题名

2018年北海道胆振東部地震引起的厚真町堰塞湖之形成與潰決潛勢分析

并列篇名

Formation and Dam Breach Analysis of the 2018 Hokkaido Iburi-Tobu Earthquake-Induced Landslide Dam in Atsuma Town, Japan

DOI

10.29417/JCSWC.201912_50(4).0003

作者

吳振佑(Chen-Yu Wu);林家興(Chia-Hsing Lin);陳國威(Kuo-Wei Chen);陳振宇(Chen-Yu Chen)

关键词

堰塞湖潰壩 ; 洪水演算 ; 影響範圍 ; 北海道胆振東部地震 ; landslide dam breach ; flood routing ; impact area ; Hokkaido Iburi-Tobu earthquake

期刊名称

中華水土保持學報

卷期/出版年月

50卷4期(2019 / 12 / 01)

页次

154 - 165

内容语文

繁體中文

中文摘要

地震或降雨引致崩塌所形成的堰塞湖,有可能導致嚴重的二次災害,故如何快速評估堰塞湖潰決後的衝擊與影響,係防災工作上的重要課題。本研究嘗試使用免費的HEC-RAS水理模式的二維洪水演算模組,建立一套快速評估堰塞湖潰決後對下游之衝擊與影響的標準作業程序,並以2018年9月6日日本北海道地震導致之厚真町堰塞湖為案例,藉由水理數值模式,分析堰塞湖潰決之洪峰水流運動特性,包括潰壩時所產生之潰決尖峰流量、洪水到達時間、河道溢淹情況等。透過不同壩高與潰壩延時之潰壞參數變動情境模擬成果,可協助防災單位掌握相關風險,並據以劃定影響範圍及保全對象、研擬緊急避難計畫,以及設定警戒發布時機等相關防災措施。

英文摘要

Landslide dams, whether induced by earthquake or rainfall, may cause serious secondary disasters. Therefore, assessing the disaster impact after a landslide dam breach is crucial for disaster response work. This study used a free two-dimensional flood-routing model on HEC-RAS to establish a standard operating procedure for rapidly assessing the impact of such a breach to protect downstream targets. The landslide dam caused by the Hokkaido earthquake in Atsuma Town, Japan on September 6, 2018 was studied in this research. A numerical model was selected to simulate the dam breach and analyze flood wave characteristics, including peak discharge, flooding arrival time, and the inundation area. Landslide dam heights and breach durations were simulated to uncover disaster risks. From these results, the emergency operation center can delimit the inundated area, protect targets, create emergency evacuation plans, and set early-warning criteria.

主题分类 生物農學 > 農業
生物農學 > 森林
生物農學 > 畜牧
生物農學 > 漁業
生物農學 > 生物環境與多樣性
工程學 > 土木與建築工程
工程學 > 市政與環境工程
参考文献
  1. Alivio, M.B.T.,Puno, G.R.,Talisay, B.A.M.(2019).Flood hazard zones using 2d hydrodynamic modeling andremote sensing approaches.Global Journal of Environmental Science and Management,5(1),1-16.
  2. Bagus, P.Y.,Mohammad, B.A.,Iwan, K.H.,Yadi, S.,Joko, N.,Arno, A.K.(2019).Analysis of flood propagation and its impact on Negeri Lima Village due to the failure of Way Ela Dam.MATEC Web of Conferences,270(4),04011.
  3. Brunner, G.W.(2016).HEC-RAS River Analysis System Reference Manual.US Army Corps of Engineers Institute for Water Resources Hydrologic Engineering Center.
  4. Brunner, G.W.(2016).HEC-RAS River Analysis System, 2D Modeling User’s Manual Versions 5.0.US Army Corps of Engineers Institute for Water Resources Hydrologic Engineering Center.
  5. Brunner, G.W.(2016).HEC-RAS River Analysis System User’s Manual Versions 5.0.US Army Corps of Engineers Institute for Water Resources Hydrologic Engineering Center.
  6. Butt, M.J.,Umar, M.,Qamar, R.(2013).Landslide dam and subsequent dam-break flood estimation using HEC-RAS model in Northern Pakistan.Natural Hazards,65(1),241-254.
  7. Costa, J.E.,Schuster, R.L.(1986).A perspective on landslide dams.Landslide dam: Processes Risk and Mitigation
  8. Costa, J.E.,Schuster, R.L.(1988).The Formation and Failure of Natural Dams.Geological Society of America Bulletin,100(7),1054-1068.
  9. Ermini, L.,Casagli, N.(2003).Prediction of the Behaviour of Landslide Dams Using a Geomorphological Dimensionless Index.Earth Surface Processes and Landforms,28,31-47.
  10. Farooq, M.,Shafique, M.,Khattak, M.S.(2019).Flood hazard assessment and mapping of River Swat using HECRAS 2D model and high-resolution 12-m TanDEM-X DEM (WorldDEM).Natural Hazards,97,477-492.
  11. Ministry of Land, Infrastructure, Transport and Tourism. (2019). “Emergency sabo works will be implemented for landslide dam that occurred in the Hidakahoronagawa of Azumagawa water system.” Hokkaido Regional Develop ment Bureau. (Mar. 13, 2019).
  12. Shieh, C.L.,Wang, C.M.,Lai, W.C.,Tsang, Y.C.,Lee, S.P.(2009).The composite hazard resulted from Typhoon Morkot in Taiwan.Journal of the Japan Society of Erosion Control Engineering,62(4),61-65.
  13. Yamagishi, H.,Yamazaki, F.(2018).Landslide by the 2018 Hokkaido Iburi-Tobu Earthquake on September 6.Landslides,15(2),2521-2524.
  14. 土砂管理研究グループ火山・土石流チーム(2008)。天然ダム監視技術マニュアル (案)。土木研究所資料,4121
  15. 小川芳也、賴良昌憲、澤井健二、足立考之、小笠原裕介、正岡聡(2014)。氾濫解析とリンクした洪水時の避難判断支援情報の提供に関する研究。自然災害科学,J. JSNDS,33(1),43-52。
  16. 水野秀明、石塚忠範、小山內信智(2011)。土砂災害防止法の改正に基づく緊急調査の手引き。土木技術資料,53(12)
  17. 北海道開発局復興・強靱化推進本部(2019)。北海道開発局復興・強靱化推進本部 (2019),平成 30年北海道胆振東部地震 に係る復旧・復興等の状況,国土交通省北海道開発局。(Hokkaido development bureau reconstruction / resilience promotion headquarters (2019). Restoration and reconstruction related to the 2018 Hokkaido Eastern Iburi Earthquake. Hokkaido Regional Development Bureau, Ministry of Land, Infrastructure, Transport and Tourism. (in Japanese))。
  18. 清水武志、內田太郎、山越隆雄、石塚忠範(2012)。天然ダムによる土石流想定範囲計算システム(QUAD-L)の開発と 2011 年台風 12 号災害における適用。土木技術資料,54(10)
  19. 許強, Q.,鄭光, G.,李為樂, W.L.(2018)。2018 年 10 月和 11 月金沙江白格两次滑坡─堰塞堵江事件分析研究。工程地质学报,26(6),1534-1551。
  20. 陳昆廷, K.T.,臧運忠, Y.C.,郭玉樹, Y.S.,呂明鴻, M.H.,謝正倫, C.L.(2010)。莫拉克颱風引致堰塞湖之案例分析。中華防災學刊,2(1),43-50。
  21. 陳樹群, S.C.,許中立, C.L.(2009)。莫拉克颱風形成之堰塞湖及危險度評估。地工技術,122,79-88。
  22. 賴桂文, K.W.(2016)。HEC-RAS 水理模式 2D 模組介紹及應用。臺灣省水利技師公會會訊,19,1-17。
  23. 謝正倫, C.L.(2009)。莫拉克颱風引致之堰塞湖。地質季刊,28(4),66-67。
被引用次数
  1. 詹婉妤,陳振宇,施佩昱,林家興(2021)。2021年臺東大南溪堰塞湖快速評估暨潰壩後洪水模擬分析。水保技術,15(4),8-15。