参考文献
|
-
Banuelas, R.,Antony, J.(2003).Going from Six Sigma to Design for Six Sigma: An Exploratory Study Using Analytic Hierarchy Process.The TQM Magazine,15(5),334-344.
-
Breyfogle, F. W., III(2003).Implementing Six Sigma: Smarter Solutions Using Statistical Methods.Wiley.
-
Chakravorty, S. S.(2009).Six Sigma Programs: An Implementation Model.International Journal of Production Economics,119(1),1-16.
-
Chen, H.(1994).A Multivariate Process Capability Index Over a Rectangular Solid Tolerance Zone.Statistica Sinica,4,749-758.
-
Chen, K. S.,Hsu, C. H.,Ouyang, L. Y.(2007).Applied product capability analysis chart in measure step of Six Sigma.Quality & Quantity,41(3),387-400.
-
Chen, K. S.,Huang, M. L.,Li, R. K.(2001).Process Capability Analysis for an Entire Product.International Journal of Production Research,39(17),4077-4087.
-
Cheng, J. L.(2008).Implementing Six Sigma via TQM Improvement: An Empirical Study in Taiwan.The TQM Journal,20(3),182-195.
-
Cheng, T. C. E.(1991).EPQ with process capability and quality assurance considerations.The Journal of the Operational Research,42(8),713-720.
-
Fieler, P. E.,Loverro, N., Jr(1991).Defects Tail Off with Six-Sigma Manufacturing.Circuits and Devices Magazine, IEEE,7(5),18-20.
-
George, M. L.(2002).Lean Six Sigma.McGraw-Hill.
-
Harry, M. J.(1988).The Nature of Six Sigma Quality.Shaumburg, Illinois:Motorola University Press.
-
Harry, M. J.(1998).Six Sigma: A Breakthrough Strategy for Profitability.Quality Progress,May,60-64.
-
Harry, M. J.(2000).Six Sigma Leads Enterprises to Coordinate Efforts.Quality Progress,33(3),70-72.
-
Henderson, K. M.,Evans, J. R.(2000).Successful Implementation of Six Sigma: Benchmarking General Electric Company.Benchmarking: An International Journal,7(4),260-281.
-
Hendrick, C. A.,Kelbaugh, R. L.(1998).Implementing Six Sigma at GE.The Journal for quality and participation,21(4),48-53.
-
Hong, G. Y.,Goh, T. N.(2003).Six Sigma in Software Quality.The TQM Magazine,15(6),364-373.
-
Hsieh, C.,Lin, B.,Manduca, B.(2007).Information Technology and Six Sigma Implementation.Journal of Computer Information Systems,47(4)
-
Kane, V. E.(1986).Process Capability Indices.Journal of Quality Technology,18(1),41-52.
-
Kaya, I.,Kahraman, C.(2009).Air Pollution Control Using Fuzzy Process Capability Indices in the Six-Sigma Approach.Human and Ecological Risk Assessment,15(4),689-713.
-
Klefsjo, B.,Wiklund, H.,Edgeman, R. L.(2001).Six Sigma Seen as a Methodology for Total Quality Management.Measuring Business Excellence,15(1),31-35.
-
Kotz, S.,Pearn W. L.,Johnson, N. L.(1993).Some Process Capability Indices Are More Reliable Than One Might Think.Applied Statistics,42(1),55-62.
-
McFadden, F. R.(1993).Six-Sigma Quality Programs.Quality Progress,June,37-42.
-
Munro, R. A.(2000).Linking Six Sigma with QS-9000.Quality Progress,May,47-53.
-
Pearn, W. L.,Kotz, S.(2006).Encyclopedia and handbook of Process Capability Indices.World Scientific.
-
Raisinghani, M. S.,Ette, H.,Pierce, R.,Cannon, G.,Daripaly, P.(2005).Six Sigma: Concepts, Tools, and Applications.Industrial Management & Data Systems,105(4),491-505.
-
Somerville, S. E.,Montgomery, D. C.(1996).Process Capability Indices and Non Normal Distribution.Quality Engineering,9(2),305-316.
-
Spring, F.,Leung, B.,Cheng, S.,Yeung, A.(2003).A Bibliography of Process Capability Papers.Quality and Reliability Engineering International,19(5),445-460.
-
Swink, M.,Jocobs, B. W.(2012).Six Sigma Adoption: Operating Performance Impacts and Contextual Drivers of Success.Journal of Operations Management,30(6),437-453.
-
Zu, X.,Robbins, T. L.,Fredendall, L. D.(2010).Mapping the Critical Links Between Organizational Culture and TQM/Six Sigma Practices.International Journal of Production Economics,123(1),86-106.
|