题名

The Linkage of Process Capability without Target Value on the Center in Six Sigma Management

并列篇名

六標準差管理中目標值偏離中心值之製程能力的連結

作者

李旭華(Hsu-Hua Lee)

关键词

六標準差管理 ; 品質 ; 製程能力 ; Six sigma management ; quality ; process capability

期刊名称

中國統計學報

卷期/出版年月

51卷2期(2013 / 06 / 01)

页次

211 - 224

内容语文

英文

中文摘要

六標準差管理為突破品質改善之創新手法,以減少變異。製程能力分析乃分析變異對製程影響的方法之一。平均值偏離目標值與變異數可對應於在六標準差管理中之標準差水準,予以衡量製程能力指數。在本研究中,當目標值不在規格內之中心值時,六標準差管理中之標準差水準可連結於製程能力指數。管理者可藉此衡量六標準差管理之管理績效。

英文摘要

Six sigma management is an innovative approach of breakthrough quality management in order to reduce the variation. The process capability analysis is one of the methods to analyze the effect of variation on the process. The deviation of the mean from the target value and the variance for specific sigma level in six sigma management can be used to measure the process capability indices. In this paper, the level of six sigma management will be linked with the process capability indices when the target value is not on the center within the specification. The managers can measure managerial performance of six sigma management.

主题分类 基礎與應用科學 > 統計
参考文献
  1. Banuelas, R.,Antony, J.(2003).Going from Six Sigma to Design for Six Sigma: An Exploratory Study Using Analytic Hierarchy Process.The TQM Magazine,15(5),334-344.
  2. Breyfogle, F. W., III(2003).Implementing Six Sigma: Smarter Solutions Using Statistical Methods.Wiley.
  3. Chakravorty, S. S.(2009).Six Sigma Programs: An Implementation Model.International Journal of Production Economics,119(1),1-16.
  4. Chen, H.(1994).A Multivariate Process Capability Index Over a Rectangular Solid Tolerance Zone.Statistica Sinica,4,749-758.
  5. Chen, K. S.,Hsu, C. H.,Ouyang, L. Y.(2007).Applied product capability analysis chart in measure step of Six Sigma.Quality & Quantity,41(3),387-400.
  6. Chen, K. S.,Huang, M. L.,Li, R. K.(2001).Process Capability Analysis for an Entire Product.International Journal of Production Research,39(17),4077-4087.
  7. Cheng, J. L.(2008).Implementing Six Sigma via TQM Improvement: An Empirical Study in Taiwan.The TQM Journal,20(3),182-195.
  8. Cheng, T. C. E.(1991).EPQ with process capability and quality assurance considerations.The Journal of the Operational Research,42(8),713-720.
  9. Fieler, P. E.,Loverro, N., Jr(1991).Defects Tail Off with Six-Sigma Manufacturing.Circuits and Devices Magazine, IEEE,7(5),18-20.
  10. George, M. L.(2002).Lean Six Sigma.McGraw-Hill.
  11. Harry, M. J.(1988).The Nature of Six Sigma Quality.Shaumburg, Illinois:Motorola University Press.
  12. Harry, M. J.(1998).Six Sigma: A Breakthrough Strategy for Profitability.Quality Progress,May,60-64.
  13. Harry, M. J.(2000).Six Sigma Leads Enterprises to Coordinate Efforts.Quality Progress,33(3),70-72.
  14. Henderson, K. M.,Evans, J. R.(2000).Successful Implementation of Six Sigma: Benchmarking General Electric Company.Benchmarking: An International Journal,7(4),260-281.
  15. Hendrick, C. A.,Kelbaugh, R. L.(1998).Implementing Six Sigma at GE.The Journal for quality and participation,21(4),48-53.
  16. Hong, G. Y.,Goh, T. N.(2003).Six Sigma in Software Quality.The TQM Magazine,15(6),364-373.
  17. Hsieh, C.,Lin, B.,Manduca, B.(2007).Information Technology and Six Sigma Implementation.Journal of Computer Information Systems,47(4)
  18. Kane, V. E.(1986).Process Capability Indices.Journal of Quality Technology,18(1),41-52.
  19. Kaya, I.,Kahraman, C.(2009).Air Pollution Control Using Fuzzy Process Capability Indices in the Six-Sigma Approach.Human and Ecological Risk Assessment,15(4),689-713.
  20. Klefsjo, B.,Wiklund, H.,Edgeman, R. L.(2001).Six Sigma Seen as a Methodology for Total Quality Management.Measuring Business Excellence,15(1),31-35.
  21. Kotz, S.,Pearn W. L.,Johnson, N. L.(1993).Some Process Capability Indices Are More Reliable Than One Might Think.Applied Statistics,42(1),55-62.
  22. McFadden, F. R.(1993).Six-Sigma Quality Programs.Quality Progress,June,37-42.
  23. Munro, R. A.(2000).Linking Six Sigma with QS-9000.Quality Progress,May,47-53.
  24. Pearn, W. L.,Kotz, S.(2006).Encyclopedia and handbook of Process Capability Indices.World Scientific.
  25. Raisinghani, M. S.,Ette, H.,Pierce, R.,Cannon, G.,Daripaly, P.(2005).Six Sigma: Concepts, Tools, and Applications.Industrial Management & Data Systems,105(4),491-505.
  26. Somerville, S. E.,Montgomery, D. C.(1996).Process Capability Indices and Non Normal Distribution.Quality Engineering,9(2),305-316.
  27. Spring, F.,Leung, B.,Cheng, S.,Yeung, A.(2003).A Bibliography of Process Capability Papers.Quality and Reliability Engineering International,19(5),445-460.
  28. Swink, M.,Jocobs, B. W.(2012).Six Sigma Adoption: Operating Performance Impacts and Contextual Drivers of Success.Journal of Operations Management,30(6),437-453.
  29. Zu, X.,Robbins, T. L.,Fredendall, L. D.(2010).Mapping the Critical Links Between Organizational Culture and TQM/Six Sigma Practices.International Journal of Production Economics,123(1),86-106.
被引用次数
  1. (2014).Economic specification limits and process mean settings by considering unequal target value and specification center.工業工程學刊,31(4),199-205.
  2. (2014).Production quantity and specification limits settings by considering specified process capability value.工業工程學刊,31(4),229-237.
  3. (2017).The joint determination of specification limits, process mean, and economic manufacturing quantity.工業工程學刊,34(4),283-288.