题名

多類型故障型態下最適預防保養策略研究

并列篇名

THE OPTIMAL PREVENTIVE MAINTENANCE UNDER MULTI-FAULT PATTERNS

作者

黃允成(Yun-Cheng Huang);謝雅惠(Ya-Hui Hsieh);邱士珍(Shih-Chen Chiu)

关键词

更新理論 ; 預防保養 ; 壽命分配 ; renewal theory ; preventive maintenance ; lifetime distribution

期刊名称

技術學刊

卷期/出版年月

32卷1期(2017 / 03 / 01)

页次

13 - 38

内容语文

繁體中文

中文摘要

本文使用數值模擬方法,規劃一套最適預防保養策略,以提升設備維護績效。因若等到設備發生故障才進行更換,則會使正在運行中的作業停止,更會造成各相關成本的增加。本研究在已知機器設備之壽命分配下,根據隨機過程中之更新理論,於使用期間採取適當的預防保養策略。本文建構壽命期間內總期望成本模式,其中考量預防保養成本、故障維修成本與更新成本等三項因素,配合各種可能發生之情境與給定之成本參數,利用電腦軟體設計數值積分與運算程式,找尋最佳預防保養週期,以期達到總期望成本最小化之目標。此外,透過敏感度分析以了解各參數對總期望成本與最適預防保養週期之影響。最後,提出十點結論以供後續研究與實務應用之參考。

英文摘要

In this paper, we planned an optimal preventive maintenance strategy to improve maintenance performance under the lifetime distribution was given. If we wait to replace the device until it has failed, then the shutdown and related cost will be enormous. Therefore, based on stochastic process and renewal theory, we constructed the total expected cost model. Furthermore, we designed a numerical integration program to find out the optimal preventive maintenance interval that minimized the total expected cost. The total expected cost includes the preventive cost, maintenance cost, and renewal cost. The sensitivity analysis was also taken to realize the influence of parameters on total expected cost and optimal preventive maintenance interval, respectively. Nine conclusions were drawn for use future studies and practical applications.

主题分类 工程學 > 工程學綜合
参考文献
  1. 李汶娟,吳忠武,洪清文,何侃錚,林義欽(2013)。利用上記錄值樣本對具有廣義指數分配的產品之壽命性能指標做績效評估。品質學報,20(3),275-304。
    連結:
  2. Abd-Elfattah, A. M.,Hassan, A. S.,Nassr, S. G.(2008).Estimation in Step-stress Partially Accelerated Life Tests for the Burr Type XII Distribution Using Type I Censoring.Statistical Methodology,5(6),502-514.
  3. Artana, K. B.,Ishida, K.(2002).Spreadsheet Modeling of Optimal Maintenance Schedule for Components in Wear-out Phase.Reliability Engineering and System Safety,77(1),81-91.
  4. Bakouch, H. S.,Jazi, M. A.,Nadarajah, S.,Dolati, A.,Roozegar, R.(2014).A Lifetime Model with Increasing Failure Rate.Applied Mathematical Modelling,38(23),5392-5406.
  5. Balakrishnan, N.,Ling, M. H.(2014).Gamma Life-times and One-shot Device Testing Analysis.Reliability Engineering and System Safety,126,54-64.
  6. Billinton, R.,Pan, J.(1999).Optimal Maintenance Scheduling in a Parallel Redundant System Consisting of Series Components in Each Branch.IEEE Transactions on Power Delivery,14(3),928-933.
  7. Bobrowski, S.,Chen, H.,Döring, M.,Jensen, U.,Schinköthe, W.(2015).Estimation of the Lifetime Distribution of Mechatronic Systems in the Presence of a Covariate: a Comparison among Parametric, Semiparametric and Non-parametric Models.Reliability Engineering and System Safety,139,105-112.
  8. Boland, P. J.,Proschan, F.(1982).Periodic Replacement with Increasing Minimal Repair Costs at Failure.Operations Research,30(6),1183-1189.
  9. Cancho, V. G.,Louzada-Neto, F.,Barriga, G. D. C.(2011).The Poisson-exponential Lifetime Distribution.Computational Statistics and Data Analysis,55(1),677-686.
  10. Chang, C. C.,Sheu, S. H.,Chen, Y. L.(2013).Optimal Replacement Model with Age-dependent Failure Type Based on a Cumulativerepair-cost Limitpolicy.Applied Mathematical Modelling,37(1-2),308-317.
  11. Chen, M.,Nakamura, S.,Nakagawa, T.(2010).Replacement and Preventive Maintenance Models with Random Working Times.IEICE Transactions on Fundamentals of Electronics Communications and Computer Sciences,93(2),500-507.
  12. Cooray, K.(2015).A Study of Moments and Likelihood Estimators of the Odd Weibull Distribution.Statistical Methodology,26,72-83.
  13. Domma, F.,Condino, F.(2014).A New Class of Distribution Functions for Lifetime Data.Reliability Engineering and System Safety,129,36-45.
  14. Doostparast, M.,Kolahan, F.,Doostparast, M.(2014).A Reliability-Based Approach to Optimize Preventive Maintenance Scheduling for Coherent Systems.Reliability Engineering and System Safety,126,98-106.
  15. Haghighi, F.(2014).Optimal Design of Accelerated Life Tests for an Extension of the Exponential Distribution.Reliability Engineering and System Safety,131,251-256.
  16. Han, D.(2015).Time and Cost Constrained Optimal Designs of Constant-stress and Step-stress Accelerated Life Tests.Reliability Engineering and System Safety,140,1-14.
  17. Han, G.,Fu, Y.(2011).Tri-stress Accelerated Life Test for Cylinders.Procedia Engineering,16,554-563.
  18. Ismail, A. A.(2014).Inference for a Step-stress Partially Accelerated Life Test Model with an Adaptive Type-II Progressively Hybrid Censored Data from Weibull Distribution.Journal of Computational and Applied Mathematics,260,533-542.
  19. Jabar, H. B. 2003. "Plant Maintenance Strategy: Key for Enhancing Profitability" Maintenance Resources. http://www.maintenanceresources.com/referencelibrary/ezine/chemclean.htm
  20. Jeon, Y.,Juon, S. M.,Hwang, H.,Park, J.,Shul, Y. G.(2014).Accelerated Life-time Tests Including Different Load Cycling Protocols for High Temperature Polymer Electrolyte Membrane Fuel Cells.Electrochimica Acta,148,15-25.
  21. Kumar, D.,Weatberg, U.(1997).Maintenance Scheduling under Age Replacement Policy Using Proportional Hazards Model and TTT-plotting.European Journal of Operational Research,99(3),507-515.
  22. Lee, W. C.,Wu, J. W.,Hong, C. W.(2009).Assessing the Lifetime Performance Index of Products with the Exponential Distribution under Progressively Type II Right Censored Samples.Journal of Computational and Applied Mathematics,231(2),648-656.
  23. Li, D. C.,Lin, L. S.(2013).A New Approach to Assess Product Lifetime Performance for Small Data Sets.European Journal of Operational Research,230(2),290-298.
  24. Li, X.,Gao, P.,Sun, F.(2015).Acceptance Sampling Plan of Accelerated Life Testing for Lognormal Distribution Under Time-censoring.Chinese Journal of Aeronautics,28(3),814-821.
  25. Ling, L.,Xu, W.,Li, M.(2009).Parametric Inference for Progressive Type-I Hybrid Censored Data on a Simple Step-stress Accelerated Life Test Model.Mathematics and Computers in Simulation,79(10),3110-3121.
  26. Liu, X.,Tang, L. C.(2010).Planning Sequential Constantstress Accelerated Life Tests with Stepwise Loaded Auxiliary Acceleration Factor.Journal of Statistical Planning and Inference,140(7),1968-1985.
  27. Makis, V.,Jiang, X.,Cheng, K.(2000).Optimal Preventive Replacement under Minimal Repair and Random Repair Cost.Mathematics of Operations Research,25(1),141-156.
  28. Moghaddam, K. S.,Usher, J. S.(2011).Preventive Maintenance and Replacement Scheduling for Repairable and Maintainable Systems Using Dynamic Programming.Computers and Industrial Engineering,60(4),654-665.
  29. Nakagawa, T.(1986).Modified Discrete Preventive Maintenance Policies.Naval Research Logistics Quarterly,33(4),703-715.
  30. Nguyen, D. G.,Murthy, D. N. P.(1981).Optimal Preventive Maintenance Policies for Repairable Systems.Operations Research,29(6),1181-1194.
  31. Osaki, S.(1992).Applied Stochastic System Modeling.Heidelberg:Springer-Verlag.
  32. Özsoy, S.,Çelik, M.,Kadıoğlu, F. S.(2008).An Accelerated Life Test Approach for Aerospace Structural Components.Engineering Failure Analysis,15(7),946-957.
  33. Park, D. H.,Jung, G. M.,Yum, J. K.(2000).Cost Minimization for Periodic Maintenance Policy of a System Subject to Slow Degradation.Reliability Engineering and System Safety,68(2),105-112.
  34. Percy, D. F.,Kobbacy, K. A. H.(2000).Determining Economical Maintenance Intervals.International Journal of Production Economics,67(1),87-94.
  35. Sarhan A. M.,Hamilton, D. C.,Smith, B.(2012).Parameter Estimation for a Two-parameter Bathtub-shaped Lifetime Distribution.Applie Modelling,36(11),5380-5392.
  36. Seo, J. H.,Jung, M.,Kim, C. M.(2009).Design of Accelerated Life Test Sampling Plans with a Nonconstant Shape Parameter.European Journal of Operational Research,197(2),659-666.
  37. Srivastava, P. W.,Jain, N.(2011).Optimum Ramp-stress Accelerated Life Test for M Identical Repairable Systems.Applied Mathematical Modelling,35(12),5786-5793.
  38. Srivastava, P. W.,Mittal, N.(2010).Optimum Step-stress Partially Accelerated Life Tests for the Truncated Logistic Distribution with Censoring.Applied Mathematical Modelling,34(10),3166-3178.
  39. Tahmasbi, R.,Rezaei, S.(2008).A Two-parameter Life-time Distribution with Decreasing Failure Rate.Computational Statistics and Data Analysis,52(8),3889-3901.
  40. Tam, A. S. B.,Chan, W. M.,Price, J. W. H.(2006).Optimal Maintenance Intervals for a Multi-component System.Production Planning and Control: The Management of Operations,17(8),769-779.
  41. Tian, Y.,Zhu, Q.,Tian, M.(2015).Estimation for Mixed Exponential Distributions under Type-II Progressively Hybrid Censored Samples.Computational Statistics and Data Analysis,89,85-96.
  42. Watkins, A. J.,John, A. M.(2008).On Constant Stress Accelerated Life Tests Terminated by Type II Censoring at One of the Stress Levels.Journal of Statistical Planning and Inference,138(3),768-786.
  43. Xu, A.,Fu, J.,Tang, Y.,Guan, Q.(2015).Bayesian Analysis of Constant-stress Accelerated Life Test for the Weibull Distribution Using Noninformative Priors.Applied Mathematical Modelling,39(20),6183-6195.
  44. Yeh, R. H.,Chen, M. Y.(2005).Optimal Preventive-maintenance Warranty Policies for Repairable Products with Age-dependent Maintenance Costs.International Journal of Reliability, Quality and Safety Engineering,12(2),111-125.
  45. Zhang, J.,Li, W.,Cheng, G.,Chen, X.,Wu, H.,Shen, M. H. H.(2014).Life Prediction of OLED for Constant-stress Accelerated Degradation Tests Using Luminance Decaying Model.Journal of Luminescence,154,491-495.
  46. Zhang, W.,Liu, S.,Sun, B.,Liu, Y.,Pecht, M.(2015).A Cloud Model-based Method for the Analysis of Accelerated Life Test Data.Microelectronics Reliability,55(1),123-128.
  47. 張君實(2007)。桃園,中原大學。
  48. 張家華(2012)。桃園,國立中央大學。
  49. 陳沅銘(2002)。臺中,朝陽科技大學。
  50. 黃俊真(2011)。新竹,國立清華大學。
  51. 鄭達才(2000).設備維護管理─現在與未來.臺北:財團法人中國生產力中心.
  52. 蘇國瑋(1997)。桃園,國立中央大學。