题名

臺灣發展低層鋼結構建築之優先策略

并列篇名

PRIORITIES STRATEGY OF DEVELOPING LOW-RISE STEEL CONSTRUCTION BUILDINGS IN TAIWAN

作者

呂文堯(Wen-Yao Lu);王維歆(Wei-Xin Wang);郭倩彣(Chien-Wen Kuo)

关键词

低層鋼結構建築 ; 模糊德菲法 ; 層級分析法 ; 模糊偏好順序評價法 ; low-rise steel construction building ; Fuzzy Delphi Method ; AHP ; Fuzzy TOPSIS

期刊名称

技術學刊

卷期/出版年月

33卷1期(2018 / 03 / 01)

页次

29 - 40

内容语文

繁體中文

中文摘要

本文以模糊德菲法確認臺灣發展低層鋼結構建築須考慮20項SWOT因素。採用層級分析法(AHP)求得各SWOT因素之權重,建議權重較高之劣勢及威脅應列為臺灣發展低層鋼結構建築須優先改進之項目。本文針對臺灣發展低層鋼結構建築擬定八個策略,並採用模糊偏好順序評價法(Fuzzy TOPSIS)進行擇優排名。

英文摘要

Through the Fuzzy Delphi Method (FDM), we confirmed that 20 SWOT factors should be considered in developing low-rise steel construction building in Taiwan. The weights of SWOT factors were arrived at through analytical hierarchy process (AHP). Improvements should be made for the weaknesses and threats in developing low-rise steel construction buildings with higher weights. Fuzzy technique for order preference by similarity to ideal solution (Fuzzy TOPSIS) was used to obtain the order preference of eight strategies suggested in this paper.

主题分类 工程學 > 工程學綜合
参考文献
  1. 宋慶財,李雪香(2011)。從 SWOT 矩陣分析法探討傳統民居永續發展之可行性–以五溝村客家伙房民宿為例。設計學研究,14(S),111-132。
    連結:
  2. 林草英,陳勇男,莊憲正(2001)。推動中小學建築鋼構造範例之分析。建築學報,38,115-127。
    連結:
  3. 葉晉嘉,翁興利,吳濟華(2007)。德菲法與模糊德菲法之比較研究。調查研究-方法與應用,21,31-58。
    連結:
  4. Alptekin, N.(2013).Integration of SWOT Analysis and TOPSIS Method in Strategic Decision Making Process.The Macrotheme Review,2(7),1-8.
  5. Ashrafzadeh, M.,Rafiei, F. M.,Isfahani, N. M.,Zare, Z.(2012).Application of Fuzzy TOPSIS Method for the Selection of Warehouse Location: A Case Study.Interdisciplinary Journal of Contemporary Research in Business,3(9),655-671.
  6. Bas, E.(2013).The Integrated Framework for Analysis of Electricity Supply Chain Using an Integrated SWOT-fuzzy TOPSIS Methodology Combined with AHP: The Case for Turkey.International Journal of Electrical Power & Energy Systems,44(1),897-907.
  7. Chen, C. T.(2000).Extensions of the TOPSIS for Group Decision-making under Fuzzy Environment.Fuzzy Sets and Systems,114(1),1-9.
  8. Ertuğrul, İ.,Karakaşoğlu, N.(2008).Comparison of Fuzzy AHP and Fuzzy TOPSIS Methods for Facility Location Selection.International Journal of Advanced Manufacturing Technology,39(7-8),783-795.
  9. Ghorbani, M.,Velayati, R.,Ghorbani, M. M.(2011).Using Fuzzy TOPSIS to Determine Strategy Priorities by SWOT Analysis.Proceedings of 2011 International Conference on Financial Management and Economics,Hongkong, China:
  10. Hsu, Y. L.,Lee, C. H.,Kreng, V. B.(2010).The Application of Fuzzy Delphi Method and Fuzzy AHP in Lubricant Regenerative Technology Selection.Expert System with Application,37(1),419-425.
  11. Lee, C. C.,Chiang, C.,Chen, C. T.(2012).An Evaluation Model of E-Service Quality by Applying Hierarchical Fuzzy TOPSIS Method.International Journal of Electronic Business Management,10(1),38-49.
  12. Lee, T. H.,Liu, R. T.(2011).Strategy Formulation for the Recreational Areas of Central Taiwan: An Application of SWOT (Strengths, Weaknesses, Opportunities, Threats) Analysis.Journal of Hospitality Management and Tourism,2(3),38-47.
  13. Liu, W. K.(2013).Application of the Fuzzy Delphi Method and the Fuzzy Analytic Hierarchy Process for the Managerial Competence of Multinational Corporation Executives.International Journal of e-Education, e-Business, e-Management and e-Learning,3(4),313-317.
  14. Saaty, T. L.(1980).The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation.New York, NY:McGraw-Hill.
  15. Tavana, M.,Yousefpoor, N.(2012).A Hybrid Strategic Development and Prioritization Model for Information and Communication Technology Enhancement.International Journal of Operations Research and Information Systems,3(4),19-40.
  16. Weihrich, H.(1982).The TOWS Matrix- A Tool for Situational Analysis.Long Range Planning,15(2),54-66.
  17. Zadeh, L. A.(1965).Fuzzy Sets.Information and Control,8(3),338-353.
  18. 呂文堯,陳葶栩,張震鐘(2015)。以 TOPSIS 法評估室內設計圖。技術學刊,30(3),151-161。
  19. 李永展(1999)。生態城鎮:九二一災區重建的願景。新世紀智庫論壇,8,40-44。
  20. 林偉凱(2005).金屬製品業年鑑—鋼結構篇.高雄:金屬工業研究發展中心.
  21. 柯正支(2014)。桃園,健行科技大學。
  22. 高大明(2002)。花蓮,東華大學。
  23. 畢威寧(2005)。結合 AHP 與 TOPSIS 法於供應商績效評估之研究。科學與工程技術期刊,1(1),75-83。
  24. 傅思婷,吳榮華,莊允中,蔡潔娃(2009)。臺灣鋼鐵產業政策芻議。鐵冶,53(2),11-20。
  25. 劉鴻全(2015)。新北,東南科技大學。
  26. 蕭江碧(編)(1999)。,臺北,臺灣:國家地震工程研究中心。
  27. 謝英俊(2014)。輕鋼構綠建築─八八風災綱構永久屋。建築學報,90,60-65。
被引用次数
  1. (2024)。多準則群體決策法在室內裝修服務之應用研究。建築學報,128,1-18。