题名

USING THE SIMPLIFIED DRUM-BUFFER-ROPE METHOD FOR IDENTIFYING BOTTLENECK PORTS IN THE NORTH AMERICAN LINE

作者

Wen-Tso Huang;Jr-Fong Dang;Tzu-Yun Chang

关键词

CCR model ; bottleneck port ; SDBR ; Monte Carlo simulation ; North American line

期刊名称

技術學刊

卷期/出版年月

38卷3期(2023 / 09 / 01)

页次

183 - 189

内容语文

英文

中文摘要

This study utilized the simplified drum-buffer-rope (SDBR) method of the theory of constraint (TOC) to identify the bottleneck ports in the North American line. In particular, it calculated different port utilization rates by vessel operations and obtained the highest port utilization rate from the initiating load port to the terminal unloading port by assuming that the highest port utilization rate was the bottleneck port. The Monte Carlo simulation was used to simulate actual data spanning ten years in the North American line and verify bottleneck ports.

主题分类 工程學 > 工程學綜合
参考文献
  1. Al Abbasi, J. N.,Khaleel, M. A.,Abdal-hammed, M. K.,Loh, Y. F.,Ozel, G.(2019).A New Uniform Distribution with Bathtub-Shaped Failure Rate with Simulation and Application.Mathematical Sciences,13,105-114.
  2. Benavides, M. B.,Landeghem, H. V.(2015).Implementation of S-DBR in Four Manufacturing SMEs: a Research Case Study.Production Planning & Control,26(13),1110-1127.
  3. Chakravorty, S. S.,Hales, D. N.(2016).Improving Labour Relations Performance Using a Simplified Drum Buffer Rope (S-DBR) Technique.Production Planning & Control,27(2),102-113.
  4. Chang, Y. C.,Huang, W. T.(2014).An Enhanced Model for SDBR in a Random Reentrant Flow Shop Environment.International Journal of Production Research,52(6),1808-1826.
  5. Chang, Y. C.,Huang, W. T.(2011).Using Simplified Drum-Buffer-Rope for Re-Entrant Flow Shop Scheduling in a Random Environment.African Journal of Business Management,5(26),10796-10810.
  6. China Port Network. 2016. Accessed November 1. http://www.chinaports.com/shiptracker/olv3/index.jsp
  7. Costas, J.,Ponte, B.,Fuente, D. D. L.,Pino, R.,Puche, J.(2015).Applying Goldratt’s Theory of Constraints to Reduce the Bullwhip Effect through AgentBased Modeling.Expert Systems with Applications,42(4),2049-2060.
  8. Ghorbani, M.,Arabzad, S. M.,Shirouyehzad, H.,Shahin, A.(2014).Developing a Logical Model for Cellular Manufacturing Systems by Theory of Constraints Thinking Process Approach.International Journal of Logistics Systems and Management,18(2),270-282.
  9. Govoni, H.,Souza, F. B.,Castro, R. F.,Rodrigues, J. S.,Pires, S. R. I.(2021).Analysis of Production Resources Improvement Strategies in Make-to-Stock Environments Managed by the Simplified Drum-Buffer Rope System.Gestão & Produção,28(4),e55.
  10. Huang, W. T.,Chen, P. S.,Liu, J. J.,Chen, Y. R.,Chen, Y. H.(2018).Dynamic Configuration Scheduling Problem for Stochastic Medical Resources.Journal of Biomedical Informatics,80,96-105.
  11. Hwang, Y. J.,Huang, C. L.,Li, R. K.(2011).Using Simplified Drum-Buffer-Rope to Rapidly Improve Operational Performance: A Case Study in China.Production and Inventory Management Journal,47(1),80-93.
  12. Koshti, R. D.,Kamalja, K. K.(2021).Parameter Estimation of Cambanis-Type Bivariate Uniform Distribution with Ranked Set Sampling.Journal of Applied Statistics,48(1),61-83.
  13. Lee, J. H.,Chang, J. G.,Tsai, C. H.,Li, R. K.(2010).Research on Enhancement of TOC Simplified Drum-Buffer-Rope System Using Novel Generic Procedures.Expert Systems with Applications,37(5),3747-3754.
  14. Schragenheim, E. 2006. “Using SDBR in Rapid Response Projects.” Schragenheim, E. http://www.ftfsys.com/zl/Using%20SDBR%20in%20Rapid%20Response%20Project.pdf
  15. Schragenheim, E.,Dettmer, H. W.(2000).Manufacturing at Warp Speed: Optimizing Supply Chain Financial Performance.Boca Raton, FL:St. Lucie Press.
  16. Torabi, H.,Montazeri, N. H.(2014).The Logistic-Uniform Distribution and Its Applications.Communications in Statistics-Simulation and Computation,43(10),2551-2569.
  17. Watson, K. J.,Blackstone, J. H.,Gardiner, S. C.(2007).The Evolution of a Management Philosophy: the Theory of Constraints.Journal of Operations Management,25(2),387-402.
  18. Zhao, X. F.,Hou, J. R.(2014).Analyzing the Time Buffer in the Theory of Constraints Based Lean Operations.Journal of Management Analytics,1(3),185-199.