負荷平均排班最佳化模式之研究-以模具加工廠為例 |
并列篇名 |
Optimal Fair-Load Scheduling-A Case Study of a Molding Factory |
DOI |
10.6652/JoCICHE.201506_27(2).0007 |
作者 |
顏上堯(Shang-Yao Yan);陳柏華(Albert Chen);林淑梅(Shou-Mei Lin) |
关键词 |
模具廠 ; 排班 ; 二元整數規劃 ; 公平指派模式 ; molding factory ; work shift ; binary integer programming ; optimal fair work assignment |
期刊名称 |
中國土木水利工程學刊 |
卷期/出版年月 |
27卷2期(2015 / 06 / 01) |
页次 |
163 - 171 |
内容语文 |
繁體中文 |
中文摘要 |
當前模具製造業大多屬24小時加工生產模式,且人工經驗排班作業為各企業單位常用但耗時的作法,常令決策者花費時間於溝通協調、安排整合調度,排班結果亦非最佳之公平指派。本研究因應現實需求及公平性,以模具加工廠之製程人員,於固定週期內從事日夜班勤務需求之人員排班為研究範圍,將現實問題之限制資源予以量化,進而轉換並建構成二元整數規劃模式,求解最佳化負荷平均之指派。本研究並調整相關參數及增減限制條件以推演方案分析,藉此求得所有製程人員之負荷平均排班,幫助決策者適度規劃人力安排,防止產生勞工超時及過勞現象致違反勞動檢查機關之規定,更可作為製造業之人力指派參考。本研究模式與傳統人工經驗指派方式相對比較下,在指派次數上節省21.05%,求解時間縮短97.44%,其負荷加權目標值、目標值、日夜班排班之次數及指定勤務出勤次數,也優於傳統人工經驗指派方式。 |
英文摘要 |
In view of the growing mold and die industry, and due to the fact that most current manufacturers utilize 24-hour operations, there is a need to automate the scheduling and assignment of mold and die work-shifts. Manual scheduling and assignment are time-consuming and pose problems to corporate departments. Decisions-makers often spend a great amount of time on communications and work-shift arrangements, while the outcome of the final work-shift may still be non-optimal. In this research, the actual demands and standard of fairness are factors considered for the scheduling and assignment of the process-personnel of a molding factory. The demands on work-shifts during daytime and nighttime in a fixed weekly period are considered. A Binary Integer Programming (BIP) approach is taken for the formulation of the problem. The test results using the real data from a molding factory show that the optimal work assignment with fair loading out performs the manual approach for higher efficiency and fairness. By using the BIP approach, there is a 21.04% reduction in numbers of assignment and a 97.44% reduction in deriving a solution. |