中文摘要
|
本文以進入阿里山森林遊樂區前方2,000公尺的一處曾經產生小規模崩塌,並經穩定處理的公路邊坡(台18線86 k + 950)為對象,在邊坡上設置一系列的地下水位井、傾斜觀測管等監測設備,並連結中央氣象局阿里山雨量站的降雨觀測,取得該公路邊坡的降雨量-地下水位變動的關係,並由Geo-Studio軟體分析公路邊坡的安全係數與地下水位變動的關係,求得使安全係數= 1的臨界地下水位,再由降雨量-地下水位變動的關係圖中,探討可使邊坡的地下水位達到臨界狀態時所須要的降雨量之上、下限,並依此分辨讓邊坡處於安全、可能崩塌(0 < 破壞機率 < 100%)及崩塌(破壞機率 = 100%) 等狀態時之累積降雨量(ΣR),進而為此試驗邊坡建立以降雨量為基礎的豪雨防災預警系統,其內容為:安全階段(ΣR<366mm)警戒階段(366 mm ≦ ΣR < 599 mm)避難階段(599 mm ≦ ΣR < 882 mm)災害階段(882 mm ≦ ΣR < 1,116 mm)災難階段(1,116 mm ≦ ΣR)
|
英文摘要
|
This study investigates a highway slope 2 km ahead of the entrance of Alishan National Forest Recreation Area and is located at the mileage of 86 k + 950 of the Alishan Highway. Artificial countermeasures were conducted after a slope failure. Groundwater wells and inclination wells are installed on the slope. The relations between rainfall and groundwater fluctuation are obtained by analyzing the groundwater elevation and the rainfall data from the Alishan rainfall station. In addition, the relations between the slope stability and the groundwater level are assessed by the Geo-Studio software to obtain the groundwater level with the critical state of the slope. Then, the rainfall-groundwater level figure indicates the upper and lower bounds of the rainfall to result in the slope critical state. Next, the cumulative rainfall (ΣR) corresponding to the following three slope stability stages: stable, possible failure (0 < failure possibility < 100%), and slope failure (failure possibility = 100%) can be determined. Therefore, the rainfall-based slope warning system is shown as follows: (1) Safety (ΣR < 366 mm), (2) Warning (366 mm≦Σ R < 599 mm), (3) Refuge (599 mm≦ΣR < 882 mm), (4) Disaster (882 mm≦ΣR < 1,116 mm), (5) Catastrophe (1,116 mm≦ΣR).
|
参考文献
|
-
莊雅雯(2017)。台南,國立成功大學土木工程研究所。
連結:
-
陳允哲(2018)。台南,國立成功大學土木工程研究所。
連結:
-
曾致仁(2017)。台南,國立成功大學土木工程研究所。
連結:
-
經濟部中央地質調查所網站,http://www.moeacgs.gov.tw (2018)。
-
Chang, M. S.,Chiu, Y. F.,Lin, S. Y.,Ke, T. C.(2005).Preliminary study onthe 2003 slope failure in Woo-Wan-Chai area, Mt. Ali Road, Taiwan.Engineering Geology,80,93-114.
-
Fujita, M.(2013).Multimodal sediment disasters due to extreme heavy rainfall and the countermeasure.第 30 屆中日工程技術研討會防災組論文集,台南:
-
Geo-Slope International LTD(2018).Geo-Slope International LTD, Slope/W for Slope Stability Analysis, User’s Manual, Calgary, Alberta, Canada (2018)..
-
Lee, D. H.,Lai, M. H.,Wu, J. H.,Chi, Y. Y.,Ko, W. T,Lee, B. L.(2013).Slope management criteria for Alishan Highway based on database of heavy rainfall-induced slope failures.Engineering Geology,162,97-107.
-
Lin, H. M.,Chang, S. K.,Wu, J. H.,Juang, C. H.(2009).Neural network-based model for assessing failure potential of highway slopes in the Alishan, Taiwan area: pre- and post-earthquake investigation.Engineering Geology,104,280-289.
-
公路總局第五區養護工程處(2012)。公路總局第五區養護工程處,「2012 年度公路防救災檢討年報」,嘉義 (2012)。
-
日本地盤工學會(2006)。豪雨時における斜面崩壞のメカニズムおよび危險度予測。東京,日本:
-
王鑫(1988).地形學.台北:聯經出版社.
-
田中茂(1975)。集中豪雨と災害。水利科學,19(3)
-
成功大學公共工程研究中心(2014)。,台南:中構日建股份有限公司。
-
池谷浩(1974)。降雨強度比による土砂災害からの避難基準に関する一私案。新砂防,94,7-11。
-
行政院農委會水土保持局(2012).101 年重大土砂災例現勘及報告彙編成果報告.台北:環興科技股份有限公司.
-
何慶齡(2016)。台南,國立成功大學土木工程研究所。
-
吳建宏,陳建宏,謝承均(2013)。小林村崩塌邊坡穩定模擬之研究。第 30 屆中日工程技術研討會防災組論文集,台南:
-
呂政諭(2001)。臺南,國立成功大學土木工程研究所。
-
李明熹(2006)。台南,國立成功大學水利及海洋工程研究所。
-
李德河,田坤國,黃嵩傑,林國忠(1996)。賀伯颱風引致阿里山公路低海拔路段邊坡變動之觀測調查。地工技術雜誌,57,81-91。
-
陳弘倫(2015)。台南,國立成功大學土木工程研究所。
-
陳培源(2006).台灣地質.台北:科技圖書.
-
曾志豪(2004)。台南,國立成功大學土木工程研究所。
-
詹錢登(2002)。行政院農委會水土保持局計畫報告行政院農委會水土保持局計畫報告,台北:行政院農委會水土保持局。
-
蔡明君(2008)。台南,國立成功大學土木工程研究所。
|