参考文献
|
-
郭韋良,謝尚賢(2017)。全球 BIM 指引之發展簡介。中國土木水利工程學會會刊,44(4),4-9。
連結:
-
陳建忠,余文德,邱垂德,鄭紹材,賴朝俊(2017)。台灣 BIM指南之研擬。中國土木水利工程學會會刊,44(4),26-38。
連結:
-
楊智斌,徐景文,周宏宇(2017)。公共工程執行執行導入 BIM 技術作業手冊介紹。土木水利,44(4),18-25。
連結:
-
Amiri, M.,Zandieh, M.,Soltani, R.,Vahdani, B.(2009).A hybrid multi-criteria decision-making model for firms competence evaluation.Expert Systems with Applications,36,12314-12322.
-
Becerik-Gerber, B.,Rice, S.(2010).The Perceived Value of Building Information Modeling in the U.S. Building Industry.Journal of Information Technology in Construction,15,185-201.
-
Bertolini, M.,Braglia, M.,Carmignani, G.(2006).Application of the AHP methodology in making a proposal for a public work contract.International Journal of Project Management,24,422-430.
-
British standards institution, BIM Level 2, (PAS 1192, http://bim-level2.org/en/standards/downloads/, Access 2018/09/02.
-
Building and construction authority(2013).Singapore BIM Guide.
-
buildingSMART alliance(2015).National BIM standard- united states.National Institute of Building Sciences=NIBS.
-
Celik, M.,Deha Er, I.,Fahri Ozok, A.(2009).Application offuzzy extended AHP methodology on shipping registry selection: The case of Turkish maritime industry.Expert System with Applications,36,190-198.
-
CIC(2013).Computer Integrated Construction (CIC) Research Program at The Pennsylvania State UniversityComputer Integrated Construction (CIC) Research Program at The Pennsylvania State University,未出版
-
CIC(2011).Computer Integrated Construction (CIC) Research Program at The Pennsylvania State UniversityComputer Integrated Construction (CIC) Research Program at The Pennsylvania State University,未出版
-
Durán, O.,Aguilo, J.(2008).Computer-aided machine-tool selection based on a Fuzzy-AHP approach.Expert System with Applications,34,1787-1794.
-
Lin, C. C.,Wang, W. C.,Yu, W. D.(2008).Improving AHP for construction with an adaptive AHP approach (A3).Automation in Construction,17,180-187.
-
McGraw Hill Construction(2009).Smart Market Report - the Business Value of BIM: Getting Building Information Modeling to the Bottom Line.New York:McGraw Hill Construction.
-
Ngai, E. W. T.,Chan, E. W. C.(2005).Evaluation of knowledge management tools using AHP.Expert System with Applications,29,889-899.
-
NIBS(2017).NIBS, “National BIM guide for owners,” National Institute of Building Sciences (NIBS) (2017)..
-
Olatunji, O. A.(2011).Modelling the costs of corporate implementation of building information modelling.Journal of Financial Management of Property and Construction,16(3),211-231.
-
Patil, N. B.,Nalawade, S. S.(2017).Building Information Modeling: A perspective and cost effectiveness.International Journal of Recent Advances in Engineering & Technology,5(2),24-26.
-
Rezaei, J.,Fahim, P. B. M.,Tavasszy, L.(2014).Supplier selection in the airline retail industry using a funnel methodology: Conjunctive screening method and fuzzy AHP.Expert System with Applications,41,65-79.
-
Russo, R.,Camanho, R.(2015).Criteria in AHP: A systematic review of literature.Procedia Computer Science,55,1123-1132.
-
Saaty, T. L.(1980).The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation.NY:McGraw-Hill.
-
Yu, W. D.(1995).An adaptive analytic hierarchy process for determining the fuzzy membership values in multi- criterion decision problems.Proceedings of the 1st CSCE Construction Specialty Conference,Ottawa, Canada:
-
上海市城鄉建設與管理委員會(2015).上海市建築訊息模型技術應用指南.
-
台大 BIM 研究中心(2017).業主 BIM 實施方針之擬定指引.台大土木工程資訊模擬與管理研究中心.
-
住房和城鄉建設部與質量監督檢驗檢疫總局(2013)。住房和城鄉建設部與質量監督檢驗檢疫總局,建築工程信息模型應用統一標準 (征求意見稿),中華人民共和國國家標準 (2013)。
-
余文德,鄭紹材,賴朝俊(2016)。內政部建築研究所委託研究報告內政部建築研究所委託研究報告,內政部建築研究所。
-
林俊昌(2008)。交通大學土木工程學系。
-
邱垂德,鄭紹材,余文德(2015)。內政部建築研究所委託研究報告內政部建築研究所委託研究報告,內政部建築研究所。
-
許俊逸,徐景文,林傑,李文欽(2014)。BIM 帶來的變革與政府的前瞻作為。工程,87(5),2-9。
-
陳瑞鈴,楊智斌(2017)。內政部建築研究所協同研究報告內政部建築研究所協同研究報告,內政部建築研究所。
-
陳瑞鈴,謝宗興(2016)。陳瑞鈴、謝宗興,「推動多面向智慧城市及建築防火與BIM 技術先期計畫新加坡 BIM 研習行程」,內政部建築研究所出國考察報告,2016 年 10 月 19 日,第 28 頁。
-
楊智斌(2017).「機關辦理公共工程導入建築資訊建模 BIM 技術」委託專業服務案成果報告書.行政院公共工程委員會.
-
楊智斌(2017)。楊智斌,機關辦理公共工程導入建築資訊建模(BIM)技術作業參考手冊,行政院公共工程委員會委託專業服務案(2017)。
|