题名

水資源供水系統長短期操作合併考量水庫水力排砂及地下水可用水量補注下之缺水風險評估研究

并列篇名

A STUDY ON THE ASSESSMENT OF WATER SHORTAGE RISK FOR A RESERCOIR WATER SUPPLY SYSTEM WITH CONDITIONS OF HYDRAULIC SEDIMENT REMOVAL AND GROUNDWATER AVAILABLE YIELD SUPPORT IN THE LONG AND SHORT TERM OPERATIONS

DOI

10.6652/JoCICHE.202105_33(3).0003

作者

陳柏蒼(Boris Po-Tsang Chen);陳昶憲(Chang-Shian Chen);羅偉誠(Wei-Cheng Lo);巫孟璇(Meng-Hsuan Wu)

关键词

缺水率 ; 序率過程 ; 產砂量分析 ; 地下水支援 ; water shortage rate ; stochastic process ; sediment yield estimation ; groundwater support

期刊名称

中國土木水利工程學刊

卷期/出版年月

33卷3期(2021 / 05 / 01)

页次

197 - 213

内容语文

繁體中文

中文摘要

本研究估計曾文-烏山頭水庫系統之淤積趨勢自2017年有效庫容五億三千兩百萬立方公尺至續淤5、10、15及20年後等4種庫容,在評估本研究與水利署估列的水力排砂效益、啟動地下水支援供水後,就整體趨勢而言,啟動地下水支援地表乾季供水後,在極端乾旱事件約可供3~5%的缺水率減緩能力,惟所能貢獻部分,隨水庫的調節能力縮小而縮小。本研究方法除可為決策者就單一水源的水資源操作方式提供量化的供水風險外,亦可呈現特定工程策略(清淤及地下水補注)下之供水風險反應。未來如需評估多水源系統的聯合操作,則需再進一步考量電腦的計算能力。

英文摘要

The proposed study is an advanced study for the establishment of water resources regulation decision support system. In this study, the conditions of characteristics of shortages, which included rates, duration and occurrence probabilities, from different scenarios of reservoir capacities (effected by the volume of reservoir sediment) and given demands would be taken into the consideration of synthetic risk of regional water supply. The current available operations including the hydraulic sediment removal and groundwater support are not enough to compensate for the risk of water shortage that caused by the increasing sediment in the Tsengwen-Wusanto Reservoir system. This study can provide more useful and objective evaluations for decision makers who need to devise strategies to face the challenges of an impending drought, especially potential strategies involved inter-watersheds regulation.

主题分类 工程學 > 土木與建築工程
工程學 > 水利工程
工程學 > 市政與環境工程
参考文献
  1. Chen, B. P.,Chen, C. S.(1977).Feasibility assessment of a water supply reliability index for water resources project planning and evaluation.Water,11(10)
  2. ETtoday 新聞雲,「四項首創工法曾文水庫防淤隧道今日啟動」,https://www.ettoday.net/news/20180128/1102317.htm#ixzz5jgK7H17L,擷取日期 2018/12/31,(2018)。
  3. Evans A. W.(1994).Evaluation public transport and road safety measures.Accident Analysis & Prevention,26(4)
  4. Frick, D. M.,Bode, D.,Salas, J. D.(1990).Effect of drought on urban water supplies. II: Water-supply analysis.Journal of Hydraulic Engineering,116(6),754-764.
  5. IRGC(2005).IRGC, Rick Governance – Towards an Integrative Approach (2005)..
  6. Jenkins, M. W.,Lund, J. R.(2000).Integrating yield and shortage management under multiple uncertainties.Journal of Water Resources Planning & Management,126(5),288-297.
  7. Karamouz, M.,Vasiliadis, H. V.(1992).Bayesian stochastic optimization of reservoir operation using uncertain forecasts.Water Resources Research.,28(5),1221-1232.
  8. Lee, C. H., “The determination of safe yield of underground reservoirs of the closed-basin type,” Transactions of the American Society of Civil Engineers, Vol. 78, Issue 1 (1915).
  9. UNDRO(1991).Mitigating natural disaster phenomenal, effects and option.New York:UN Publications.
  10. Vogel, R. M.(1987).Reliability indices for water supply systems.Journal of Water Resources Planning and Management,113(4),563-579.
  11. Yevjevich, V.(1967).An objective approach to definition and investigations of continental hydrologic droughts.Colorado State University.
  12. 吳瑞賢(2012)。行政院國家科學委員會專題研究計畫行政院國家科學委員會專題研究計畫,未出版
  13. 經濟部(2009)。經濟部,「臺灣南部區域水資源經理基本計畫 (第一次檢討)」,臺北 (2009)。
  14. 經濟部水利司(1996).水庫清淤之研究(一).臺北:
  15. 經濟部水利署(2018)。經濟部水利署,「旱災災害防救業務計畫」,臺北 (2018)。
  16. 經濟部水利署,「曾文水庫運用要點」,水利法規查詢系統,http://wralaw.wra.gov.tw/wralawgip/cp.jsp?lawId=402886812225d2ae012258fb4ea600b7 (2018)。
  17. 經濟部水利署,「把握時機曾文水庫更加強清淤」,經濟部水利署南區水資源局網站,https://www.wra.gov.tw/6996/7270/34661/ ,擷取日期2018/12/31,(2015)。
  18. 經濟部水利署(2017)。,臺北:。
  19. 經濟部水資源局(1997).水庫清淤之研究(二).臺北:
  20. 羅樹孝(1995).水文學辭典.臺北:水文學辭典茂昌圖書有限公司.