英文摘要
|
Automation is an irreversible trend in AEC industry due to labor shortage, high risk, low level of digitalization, low margin of profit, etc. Traditional tunnel planning is a time-consuming iterative work among different expertise. For the purpose of increasing the efficiency of tunnel planning, this research presents an automated planning system for mountain tunnel construction projects. The system uses the improved A* algorithm that accounts for requirements by road design specifications to automatically create a region of possible alignment. Then, it automatically streams the alignment data to assist construction of geological profiles and considers both rock classification and support category to estimate the project's cost and schedule. Finally, visualization of planning results is provided. The research result shows that, the process automation supported by the developed system can significantly improve the productivity of engineers in planning of mountain tunnel construction projects.
|
参考文献
|
-
洪晨瑋,張正憲,賴建名,嚴世傑,柳儒錚,謝尚賢(2020)。設計流程自動化平台之開發:以捷運深開挖工程為例。中國土木水利工程學刊,32(5),463-469。
連結:
-
洪晨瑋,張正憲,賴建名,嚴世傑,柳儒錚,謝尚賢(2020)。設計流程自動化平台之開發:以捷運深開挖工程為例。中國土木水利工程學刊,32(5),463-469。
連結:
-
Agarwal, R.,Chandrasekaran, S.,Sridhar, M.(2016).Agarwal, R., Chandrasekaran, S., and Sridhar, M., “Imagining construction’s digital future,” Capital Projects and Infrastructure, McKinsey Productivity Sciences Center, Singapore (2016)..
-
Dijkstra, E. W.(1959).A note on two problems in connexion with graphs.Numerische Mathematik,1,269-271.
-
Djojo, M. A.,Karyono, K.(2013).Computational Load Analysis of Dijkstra, A*, and Floyd-Warshall Algorithms in Mesh Network.2013 International Conference on Robotics, Biomimetics, Intelligent Computational Systems (ROBIONETICS),Jogjakarta, Indonesia:
-
Hart, E. P.,Nilsson, N. J.,Raphael, B.(1968).A formal basis for the heuristic determination of minimum cost paths.IEEE Transactions on System Science and Cybernetics,4,100-107.
-
McGraw Hill Construction(2014).McGraw Hill Smart Market ReportMcGraw Hill Smart Market Report,未出版
-
Ribeirinho, M. J., Mischke, J., Strube, G., Sjödin, E., Blanco, J. L., and Palter, R., The Next Normal in Construction: How Disruption is Reshaping the World’s Largest Ecosystem, McKinsey & Company, Available at https://www.mckinsey.com/business-functions/operations/our-insights/the-next-normal-in-construction-how-disruption-is-reshaping-the-worlds-largest-ecosystem (2020).
-
Sushma, M. B.,Maji, A.(2020).A modified motion planning algorithm for horizontal highway alignment development.Computer‐Aided Civil and Infrastructure Engineering,35(8),818-831.
-
Zeng, W.,Church, R. L.(2009).Finding shortest paths on real road networks: The case for A.International Journal of Geographical Information Science,23,531-543.
-
王安強,楊智斌(2018)。內政部建築研究所協同研究報告內政部建築研究所協同研究報告,台北:內政部建築研究所。
-
交通部,公路隧道設計規範,交通部,台北 (2017)。
-
交通部,公路路線設計規範,交通部,台北 (2019)。
-
徐耀賜(1996).公路工程理論與實務.台北:國彰出版社.
-
韓春華,易思蓉,楊揚(2011)。基於最優路徑分析的線路初始平面自動生成方法。西南交通大學學報,46(2),253-258。
|