参考文献
|
-
Hsu, Y. Y.,Cheng, S. T.,Yu, W. D.,Chang, H. K.,Wang, K. R.(2019).Determination of the contractor selection method for the heterogeneous procurement projects based on historical bidding data.Journal of Technology,34(4),173-185.
連結:
-
Akintoye, A.,Hardcastle, C.,Beck, M.,Chinyio, E.,Asenova, D.(2003).Achieving best value in private finance initiative project procurement.Construction Management and Economics,21(5),461-470.
-
Darvish, M.,Yasaei, M.,Saeedi, A.(2009).Application of the graph theory and matrix methods to contractor ranking.Int J Proj Manag,27(6),610-619.
-
El-Abbasy, M. S.,Zayed, T.,Ahmed, M.,Alzraiee, H.,Abouhamad, M.(2013).Contractor selection model for highway projects using integrated simulation and analytic network process.J Construct Eng Manag,139(7),755-767.
-
Herbsman, Z. J.,Chen, W. T.,Epstein, W. C.(1995).Time is money: Innovative contracting methods in highway construction.Journal of construction engineering and management, ASCE,121(3),273-281.
-
Khoso, A. R.,Yusof, A. M.,Chen, Z.-S.,Skibniewski, M. J.,Chin, K.-S.,Khahro, S. H.,Sohu, S.(2022).Comprehensive analysis of state-of-the-art contractor selection models in construction environment-A critical review and future call.Socio-Economic Planning Sciences,9,101137.
-
Palaneeswaran, E.,Kumaraswamy, M. M.(2000).Contractor selection for design/build projects.J Construct Eng Manag,126(5),331-339.
-
Shen, L.,Drew, D.,Zhang, Z.(1999).Optimal bid model for price-time biparameter construction contracts.Journal of Construction Engineering and Management,204-209.
-
Yu, W. D.,Chang, H. K.,Hsu, Y. Y.,Cheng. S. T.,Wang, K. W.(2020).Pre-tendering decision model for contractor selection of public procurement projects.ASCE, J. Constr. Eng. Manage.,146(11),04020126.
-
Yu, W. D.,Wang, K. W.(2012).Best value or lowest bid? A quantitative perspective.Journal of Construction Engineering and Management,138(1),128-134.
-
Yu, W. D.,Wang, K. W.,Wang, M. T.(2013).Pricing strategy for best value tender.Journal of Construction Engineering and Management,139(6),675-684.
-
王國武,余文德(2014)。異質採購圖形分析模式之研究。技術學刊,29(1),1-15。
-
王國武,余文德(2011)。工程異質採購分析模式之研究。中國土木水利工程學刊,23(1),77-91。
-
行政院公共工程委員會,公共工程施工廠商履約情形計分要點,臺北:行政院公共工程委員會 (2014)。
-
何育興,郭殷孝(2004)。公共工程施工廠商履約情形計分試辦情形與後續推動做法。中華道路,53(3),31-42。
-
張慶麟(2021)。太魯閣號事件引出的問題。工業安全衛生,383,7-9。
|