英文摘要
|
At construction job site, engineers have to deal with interrelationships and conflicts between various working activities during MEP (Mechanical, Electrical, and Plumbing) construction. The traditional 2-dimensional drawings cannot provide detail information for solving those issues occurring. Although 3D BIM can provide information to solve space conflicts, it is hard to locate 3D BIM properly according to various MEP construction activities. In addition, if the discrepancy of the information between the design and on-site situation occurs, it is also difficult to notice differences and identify these changes in real time. Therefore, this research first analyzes the informational and operational needs in the MEP construction to establish the mechanism of converting BIM to AR and building the cloud database that fulfills the requirements of MEP construction. Then a collaborative application that integrates BIM and AR to provide information to assist engineers during MEP construction is developed. As a result, the proposed application with the auxiliary functions can improve the MEP construction activities in terms of acquiring and updating information in real time.
|
参考文献
|
-
郭斯傑,陳曉晴,詹慕祖(2004)。建築工程中機電設備施工排序之探討。建築學報,45,121-141。
連結:
-
Alizadehsalehi, Sepehr,Hadavi, Ahmad,Huang, Joseph Chuenhuei(2020).From BIM to extended reality in AEC industry.Automation in Construction,116,103254.
-
Baeka, Francis,Hab, Inhae,Kimb, Hyoungkwan(2019).Augmented reality system for facility management using image-based indoor localization.Automation in Construction,99,18-26.
-
Behzadan, Amir H.,Dong, Suyang,Kamat, Vineet R.(2015).Augmented reality visualization: A review of civil infrastructure system applications.Advanced Engineering Informatics
-
Chen, Yi-Jao,Lai, Yong-Shan,Lin, Joseph Yen-Han(2020).BIM-based augmented reality inspection and maintenance of fire safety equipment.Automation in Construction,110,103041.
-
Chu, Michael,Matthews, Jane,Love, Peter E.D.(2018).Integrating mobile Building Information Modelling and Augmented Reality systems: An experimental study.Automation in Construction,85,305-316.
-
El Ammari, Khaled,Hammad, Amin(2019).Remote interactive collaboration in facilities management using BIM-based mixed reality.Automation in Construction,107,102940.
-
Hu, Zhen-Zhong,Zhang, Jian-Ping,Yu, Fang-Qiang,Tian, Pei-Long,Xiang, Xue-Song(2016).Construction and facility management of large MEP projects using a multi-Scale building information model.Advances in Engineering Software,100,215-230.
-
Jang, Ryan,Collinge, William(2020).Improving BIM asset and facilities management processes: A Mechanical and Electrical (M&E) contractor perspective.Journal of Building Engineering,32,101540.
-
Kwon, O. S.,Park, C. S.,Lim, C. R.(2014).A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality.Automation in Construction,46,74-81.
-
Meža, Sebastjan,Turk, Žiga,Dolenc, Matevž(2014).Component based engineering of a mobile BIM-based augmented reality system.Automation in Construction,42,1-12.
-
楊智傑,謝啟萬(2020)。BIM 導入管線工設施維護管理建立─以職務宿舍設施為例。第 18 屆大地工程學術研究討論會
-
蘇美茹(2017)。台北市,國立臺灣大學土木工程學系研究所。
|