英文摘要
|
The design and construction of turnkey contractors are often a temporary combination according to the characteristics and needs of the project. The uncertainty and ambiguity included in the cross-disciplinary partnership often make it difficult for the owner to carry out effective analysis during Turnkey contractor selection, resulting unable to achieve the project objectives, namely schedule, cost and quality, as owner's expectations. This study develops a "design/build partnership-based decision-making model for the turnkey contractors selection", using fuzzy preference relationships (FPR) to evaluate the relative weight of each influencing factor. A mathematical quantification method is used to evaluate the degree of integration of the contractor's design/build partnership to achieve project objectives of owner. Finally, combined with the double matrix of partnership integration and the ordering method, the ranking of the preferred turnkey contractors is calculated to assist the owner to select the most suitable contractor for the project.
|
参考文献
|
-
Adinyira, E.,Dafeamekpor, C. A.(2015).Clients’ Perceptions of Architect Performance on Building Projects in Ghana.Journal of Professional Issues in Engineering Education and Practice,141(3)
-
Afsath, K.,Sebastian, Linjesh(2015).Fuzzy MATLAB Approach to Construction Contractor Selection.International Journal of Scientific Engineering and Research (IJSER)
-
ASSAF, Sadi,HASSANAIN, Mohammad A.,HADIDI, Laith,AMMAN, Azfar(2017).A systematic approach for the selection of the architect/engineer professional in construction projects.Architecture, Civil Engineering, Environment,10(4)
-
Chiclana, F.,Herrera, F.,Herrera, V. E.(2001).Integrating multiplicative preference relations in a multipurpose decision making model based on fuzzy preference relations.Fuzzy Sets and Systems,112(2),277-291.
-
De Araúj, Maria Creuza Borges(2015).Contractor selection in construction industry: A multicriteria model.2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
-
De Araújo, Maria Creuza Borges,Alencar, Luciana Hazin,de Miranda Mota, Caroline Maria(2016).Model for contractor performance evaluation in construction industry.IEEE International Conference on Systems, Man, and Cybernetics (SMC)
-
Hassaan, H. S.,Fors, M. N.,Shehata, M. S..Fuzzy decision model for construction contractor’s selection in Egypt: Tender phase.2013 IEEE International Conference on Industrial Engineering and Engineering Management
-
Herrera-Viedma, E.,Herrera, F.,Chiclana, F.,Luque, M.(2004).Some issues on consistency of fuzzy preference relations.European Journal of Operational Research,154,98-109.
-
Huang, Xiaohong(2011).An analysis of the selection of project contractor in the construction management process.International Journal of Business and Management,6(3),184.
-
Ling, Y. Y.(2002).Model for predicting performance of architects and engineers.Journal of Construction Engineering and Management,128(5)
-
Maqsoom, Ahsen,Bajwa, Sajjad,Khan, Hafiz Zahoor Ahmad,Thaheem, Muhammad Jamaluddin(2019).Optimizing contractor’s selection and bid evaluation process in construction industry: Client’s perspective.Strategic Management in Construction Industry of Pakistan
-
Safa, Mahdi,Yee, Ming-Ho,Rayside, Derek,Haas, Carl T.,F.ASCE, P.E.(2016).Optimizing contractor selection for construction packages in capital projects.Journal of Computing in Civil Engineering,30(5)
-
Sibiya, Mandisa,Aigbavboa, Clinton,Thwala, Wellington Didibhuku.Construction Projects’ Key Performance Indicators: A Case of the South African Construction Industry.2015 International Conference on Construction and Real Estate Management
-
Singh, D.,Tiong, Robert L.K.(2005).A fuzzy decision framework for contractor selection.Journal of Construction Engineering and Management,131(1)
-
吳俊明(2001)。國立成功大學建築及都市規劃學門。
-
吳盈瑩(2018)。國立中央大學營建管理研究所。
-
李潔玟(2017)。國立交通大學土木工程學系。
-
杜文綺(2015)。國立高雄應用科技大學企業管理系碩士在職專班。
-
卓心庭(2016)。國立交通大學土木工程學系。
-
周文萍(2014)。國立交通大學管理學院管理科學學程。
-
林志棟(2010)。國立中央大學土木工程學系。
-
孫千惠(2008)。國立中央大學土木工程學系。
-
康尚德(2011)。國立台灣科技大學營建工程系。
-
張君榮(2011)。國立交通大學工學院工程技術與管理學程。
-
張慶成(2020)。國立宜蘭大學高階經營管理碩士在職專班。
-
梁國聖(2016)。國立中央大學營建管理研究所。
-
許志諭(2005)。國立成功大學高階管理碩士在職專班。
-
許迪威(2003)。國立台灣科技大徐營建工程系。
-
許峰賓(2006)。國立成功大學建築研究所。
-
陳桂蘭(2010)。中華大學營建管理研究所碩士班。
-
陳淑君(2002)。國立台灣大學土木工程學研究所。
-
黃志民(2006)。國立台灣科技大學營建工程系。
-
黃崧銓(2015)。逢甲大學土地管理系碩士在職專班。
-
楊政賢(2009)。國立中央大學營建管理研究所。
-
謝金明(2014)。國立成功大學工業與資訊管理學系碩士在職專班。
|