题名

災後緊急醫療救護車派遣規劃之研究

并列篇名

ON THE STUDY OF DISPATCHING EMERGENCY MEDICAL AMBULANCES FOLLOWING A DISASTER

DOI

10.6652/JoCICHE.202211_34(7).0001

作者

顏上堯(Shangyao Yan);陳俊穎(Chun-Ying Chen);洪子蓁(Tzu-Chen Hung)

关键词

緊急醫療救護 ; 救護車派遣 ; 網路流動 ; 最佳化 ; 數學規劃 ; emergent medical recuse ; ambulance dispatching ; disasters ; network flow ; optimization ; mathematical programming

期刊名称

中國土木水利工程學刊

卷期/出版年月

34卷7期(2022 / 11 / 01)

页次

565 - 576

内容语文

英文

中文摘要

以往發生重大災害事故時,衛生福利部會啟動區域緊急醫療應變中心,採取必要緊急措施。指揮中心在指派救護車後送傷患時,經常依照決策者或指揮官過去經驗所決定,此作法缺乏系統性最佳化分析,且可能造成誤判,導致延誤後送。因此,本研究以系統最佳化觀點,運用網路流動技巧定式救護車輛於時空中流動之情形,並配合數學規劃方法所構建一災後緊急醫療救護車派遣規劃模式。為評估模式正確性,本研究以桃園地區之相關資料及合理假設進行範例測試,並針對不同參數進行敏感度分析和方案分析,結果顯示本研究模式可作為決策者之規劃輔助工具。

英文摘要

When serious disasters occur, Ministry of Health and Welfare will initiate regional emergency medical operation center (REMOC) and take some necessary actions. The command center often assigned ambulances based on the decision maker's or commander's past experiences. However, this approach lacks a systematic optimization analysis. It may also cause delays to evacuate the casualties due to the incorrect judgment. Therefore, in this study, from the perspective of system optimization, we propose a model for dispatching emergency medical ambulances following a disaster. The proposed model is constructed by using the network flow technique, coupled with the mathematical programming method, to formulate the movement of ambulances in the dimensions of time and space. To evaluate the correctness of the model, a case study using the related data of Taoyuan City with reasonable assumptions is performed. A number of sensitivity/scenario analyses are conducted as well in the case study. The results demonstrate that the proposed model could be a planning support tool for the decision maker.

主题分类 工程學 > 土木與建築工程
工程學 > 水利工程
工程學 > 市政與環境工程
参考文献
  1. Bish, D. R.,Agca, E.,Glick, R.(2014).Decision support forhospital evacuation and emergency response.Annals of Operations Research,221(1),89-106.
  2. Chen, C. Y.,Yan, S.,Wu, Y. S.(2019).A model for taxi pooling with stochastic vehicle travel times.International Journal of Sustainable Transportation,13(8),582-596.
  3. Fitzsimmons, J. A.(1973).A methodology for emergency ambulance deployment.Management Science,19(6),627-636.
  4. Gong, Q.,Batta, R.(2007).Allocation and reallocation of ambulances to casualty clusters in a disaster relief operation.IIE Transactions,39(1),27-39.
  5. Jotshi, A.,Gong, Q.,Batta, R.(2009).Dispatching and routing of emergency vehicles in disaster mitigation using data fusion.Socio-Economic Planning Sciences,43(1),1-24.
  6. Liu, Y.,Li, Z.,Liu, J.,Patel, H.(2016).A double standard model for allocating limited emergency medical service vehicle resources ensuring service reliability.Transportation Research Part C,69,120-133.
  7. Rau, H. H.,Kumar, A.,Hsu, C. Y.,Hung, N. C.(2011).Identification of variables to decide optimal hospital for emergency patients.2nd IEEE International Conference on Emergency Management and Management Sciences
  8. Silka, P. A.,Geiderman, J. M.,Kim, J. Y.(2001).Diversion of ALS ambulance: Characteristics, causes, and effect in a large urban system.Prehospital Emergency Care,5(1),23-28.
  9. Spaite, D. W.,Valenzuela, T. D.,Meislin, H. W.,Criss, F.A.,Hinsberg, P.(1993).Prospective validation of a new model for evaluating emergency medical services systems by in-field observation of specific time intervals in prehospital care.Annals of Emergency Medicine,22(4),638-645.
  10. Tavakkoli-Moghaddam, R.,Memari, P.,Talebi, E.(2018).A bi-objective location-allocation problem of temporary emergency stations and ambulance routing in a disaster situation.ICOA 2018: The IEEE 4thInternational Conference on Optimization and Applications
  11. Tayfur, E.,Taaffe, K.(2009).A model for allocating resources during hospital evacuations.Computers & Industrial Engineering,57(4),1313-1323.
  12. Wilson, D. T.,Hawe, G. I.,Coates, G.,Crouch, R. S.(2013).A multi-objective combinatorial model of casualty processing in major incident response.European Journal of Operational Research,230(3),643-655.
  13. Yan, S.,Lin, C. K.,Kuo, Z. Q.(2021).Optimally locating electric scooter battery swapping stations and battery deployment.Engineering Optimization,53(5),754-769.
  14. 石富元(2005)。,臺北市:國立臺灣大學醫學院急診醫學科。
  15. 吳青翰(2006)。台南,國立成功大學交通管理學系。
  16. 施宣政(2004)。桃園,中原大學資訊管理研究所。
  17. 張偉德(2016)。台南,國立成功大學工業與資訊管理研究所。
  18. 陳育詩(2016)。台北,國立臺灣大學土木工程學研究所。