题名

建築工程中機電設備施工排序之探討

并列篇名

The Study of Construction Sequences for Mechanical/Electrical Facilities in Building Construction

DOI

10.6377/JA.200402.0121

作者

郭斯傑(Sy-Jye Guo);陳曉晴(Hsiao-Ching Chen);詹慕祖(Mu-Tzu Chan)

关键词

建築工程 ; 機電設備 ; 施工排序 ; building construction ; mechanical/electrical facilities ; construction sequencing

期刊名称

建築學報

卷期/出版年月

45期(2004 / 02 / 01)

页次

121 - 141

内容语文

繁體中文

中文摘要

機電設備在建築工程裡扮演著舉足輕重之角色,因機電設備間、機電與土建工程間常有介面產生,若未事先經過完善之檢討與整合,會經常變更設計與拆除重做,進而造成工期延宕、成本增加與品質不良的結果產生,因此,本研究藉著對機電工程特性與施工排序之研究達到(1)瞭解機電設備間、機電與土建工程間的施工介面關係;(2)瞭解機電工程設備與管路施工程式;(3)瞭解設備與管路中各細項構件施工排序邏輯;(4)機電工程與土建工程施工排序邏輯,期能在營建管理過程中提昇對機電工程介面控管之瞭解,提早發現問題之所在,降低變更設計發生之頻率,提昇整體工程之品質。

英文摘要

Mechanical/electrical facilities play important roles in building construction. Many interfaces exist among various mechanical/electrical facilities as well as among mechanical/electrical facilities and the building components. If these interfaces were not well integrated and solved, it will result in change orders, delay and cost overrun and the construction will then be compromised. This study focuses on the sequences of mechanical/electrical installation during the construction process and the topics are as follows: (1)The construction interfaces of mechanical/electrical construction and building construction. (2)The construction sequences of facilities and conduits. (3)The sequence logic of the components of the mechanical/electrical construction. (4)The sequence logic between mechanical/electrical construction and building construction. By means of investigation and analyses of sequences and interfaces of different phases of construction, problems will be detected early and be resolved efficiently. The goal is to achieve quality construction through effective construction management.

主题分类 工程學 > 土木與建築工程
参考文献
  1. (2003)。建築技術規則。台北:現代營建雜誌社。
  2. Echeverry, D.,Ibbs, C. W.,Kim, S.(1991).Sequencing knowledge for construction scheduling.Journal of Construction Engineering and Management, ASCE,117(1),118-130.
  3. Hanna, A. S.,Russell, J. S.,Gotzion, T. W.,Nordheim, E. V.(1999).Impact of change orders on labor efficiency for mechanical construction.Journal of Construction Engineering and Management, ASCE,,125(3),176-184.
  4. Hanna, A. S.,Russell, J. S.,Nordheim, E. V.,Bruggink, M. J.(1999).Impact of change orders on labor efficiency for electrical construction.Journal of Construction Engineering and Management, ASCE,125(4),224-232.
  5. Kartam,N.,Levitt, R.E.(1990).Intelligent planning of construction projects.J. Compute in Civ. Engrg., ASCE,4(2),155-175.
  6. Navinchandra, D.,Sriram, D.,Logcher, R. D.(1988).GHOST: Project Network Generator.J. Comp. in Civ. Engrg., ASCE,2(3),239-254.
  7. O`Brien, J. J.,Plotnick,F.L.(1994).CPM in construction management.New York:McGraw-Hill, Inc.
  8. 李政憲(1995)。高層集合住宅建築與設備介面之整合。台北:內政部建築研究所籌備處。
  9. 林耀煌(1995)。營建工程施工規劃與管理控制。台北:長松出版社。
  10. 莊嘉文(1991)。建築設備概論。台北:詹氏書局。
  11. 陳啓中(2000)。建築設備概論。台北:詹氏書局。
  12. 劉福勳(1994)。營建管理概論。台北:現代營建雜誌社。
被引用次数
  1. 戴期甦、陳曉晴、郭斯傑(2007)。建築工程機電系統施工界面整合之探討。建築學報,61,43-62。
  2. 馮重偉,張展豪,周政頡(2022)。開發輔助機電工程施工作業之擴增實境系統。中國土木水利工程學刊,34(6),541-550。