英文摘要
|
Mechanical/Electrical/Piping (M/E/P) systems, due to their complexity and diversity, are the most intricate portions for building construction. The lack of integration will affect the overall construction schedule and quality. In order to avoid these problems, this paper is to investigate the interface analysis and integration by two processes during the construction, one is the combined service drawing process and the other is the installation arrangement process. In the first process, the interface integration is to identify and solve the 2D and 3D pipeline interferences. During the second process, the interface integration is to deal with the installation sequencing. Based on these two processes, the ideal installation sequence will be produced. A successful system integration before construction can reduce on-site construction errors and achieve project objectives of quality, schedule, and cost. The paper clearly defines the process to complete interface integration that is essential to the building construction process.
|
参考文献
|
-
郭斯傑、陳曉晴、詹慕祖(2004)。建築工程中機電設備施工排序之研究。建築學報,45,121-141。
連結:
-
Pavitt, T. C.,Gibb, A. G. F.(2003).Interface Management within Construction, In Particular Building Façade.Journal of Construction Engineering and Management,129(1),8-15.
-
江文章(2001)。台北,國立臺灣科技大學營建工程研究所。
-
李政憲(1995)。營建自動化計畫成果報告營建自動化計畫成果報告,未出版
-
郭斯傑、黃契介、吳俊達(2002)。中國土木水利工程學刊。台北:中國土木水利工程學會。
-
葉展青(2001)。中鼎月刊。台北:中鼎工程公司。
-
詹慕祖(2000)。台北,國立臺灣大學土木工程學研究所。
-
潤安機電工程公司(2003)。機電施工圖及3D模擬圖。台北:潤泰集團。
-
黎煥霖(1994)。捷運技術。台北:台北市政府捷運工程局機電系統工程處。
|