参考文献
|
-
Beach, R.,A. P. Muhlemann,D. H. R. Price,A. Paterson,J. A. Sharp(2000).A review of manufacturing flexibility.European Journal of Operational Research,122,41-57.
-
De Toni, A.,S. Tonchia(1998).Manufacturing flexibility: A literature review.International Journal of Production Research,36(6),1587-1617.
-
Delgado, M.,J. L. Verdegay,M. A. Vila(1993).On aggregation operations of linguistic labels.International Journal of Intelligent Systems,8,351-370.
-
Filev, D.,R. R. Yager(1995).Analytic properties of maximum entropy OWA operators.Information Sciences,85,11-27.
-
Gerwin, D.(1993).Manufacturing flexibility: A strategic perspective.Management Science,39(4),395-410.
-
Golden, W.,P. Powell(2000).Towards a definition of flexibility: In search of the Holy Grail.Omega,28,373-384.
-
Gupta, Y. P.,S. Goyal(1989).Flexibility of the manufacturing system: Concepts and measurement.European Journal of Operational Research,43,119-135.
-
Herrera, F.,E. Herrera-Viedma(2000).Linguistic decision analysis: Steps for solving decision problems under linguistic information.Fuzzy Sets and Systems,115,67-82.
-
Herrera, F.,E. Herrera-Viedma,J. L. Verdegay(1995).A sequential selection process in group decision making with a linguistic assessment approach.Information Sciences,85,223-239.
-
Herrera, F.,E. Herrera-Viedma,L. Martinez(2000).A fusion approach for managing multi-granularity linguistic term sets in decision making.Fuzzy Sets and Systems,114,43-58.
-
Mitchell, H. B.,D. D. Estrakh(1997).A modified OWA operator and its use in lossless DPCM image compression.International Journal of Uncertainly, Fuzziness and Knowledge-Based Systems,5(4),429-436.
-
O`Hagan, M.(1988).Aggregating template rule antecedents in real-time expert systems with fuzzy set logic.Proceedings 22(superscript nd) annual IEEE Asilomar Conference on Signals, Systems and Computers.
-
Sarker, B. R.,S. Krishnamurthy,S. G. Kuthethur(1994).A survey and critical review of flexibility measures in manufacturing systems.Production Planning and Control,5(6),512-523.
-
Sethi, A. K.,S. P. Sethi(1990).Flexibility in manufacturing: A surrey.International Journal of Flexible Manufacturing Systems,2(4),289-328.
-
Slack, N.(1987).The flexibility of manufacturing systems.International Journal of Operations and Production Management,7(4),35-45.
-
Upton, D. M.(1994).The management of manufacturing flexibility.California Management Review,36(2),72-89.
-
Vokurka, R. J.,S. W. O`Leary-Kelly(2000).A review of empirical research on manufacturing flexibility.Journal of Operations Management,18,485-501.
-
Wang, R. C.,S. J. Chuu(2004).Group decision-making using a fuzzy linguistic approach for evaluating the flexibility in a manufacturing system.European Journal of Operational Research,154,563-572.
-
Yager, R. R.(1988).On ordered weighted averaging aggregation operators in multi-criteria decision making.IEEE Transactions on Systems, Man and Cybernetics,18,183-190.
-
Zadeh, L. A.(1965).Fuzzy set.Information and Control,8,338-353.
-
Zadeh, L. A.(1975).The concept of a linguistic variable and its application to approximate reasoning.Information Sciences,301-357.
-
Zadeh, L. A..The concept of a linguistic variable and its application to approximate reasoning.Information Sciences,8,199-249.
-
Zadeh, L. A.(1976).The concept of a linguistic variable and its application to approximate reasoning.Information Sciences,9,43-58.
|