中文摘要

針對新產品開發,以運籌效率為考量的產品設計(DFL)以及多選項式同步工程(SBCE)素來為獨立的兩項方法論。前者係考量運籌系統的條件進行產品設計;而後者首先平行產生若干設計選項,而後收斂為包括產品及製程的最終規格。本研究整合DFL與SBCE,提出一決策支援的架構,用以評估個別設計選項的運籌時問及成本,並經由權衡分析以決定最佳的設計。為滿足應有的功能,本分析架構應用高階斐氏圖、作業成本分析法、以及TOPSIS進行分析。

英文摘要

Design for Logistics (DFL) and Set-based Concurrent Engineering (SBCE) are two conventionally separated methodologies for product design. The former intends to design products by taking into consideration the logistics system that the product needs to fit in, whereas the latter explores a set of design alternatives to converge on a final specification for both product and processes. Within the scheme of integrating DFL and SBCE, we develop a decision support framework to estimate logistics time and cost for a set of design alternatives and determine the best design by making tradeoff between these two performance measures. In the proposed framework, High Level Petri Nets, Activity Based Costing, and TOPSIS are applied for the necessary functions.

主题分类 工程學 > 工程學總論
参考文献
  1. Anumba, C. J., C. E. Siemieniuch,M. A.(2000).Sinclair, Supply chain implications of concurrent engineering.International Journal of Physical Distribution & Logistics Management,30(7),556-597.
  2. Barkan, P., C. M. Hinckley(1993).The benefits and limitations of structured design methodologies.ASME Manufacturing Review.
  3. Ben-Arieh, D.,L. Qian(2003).Activity-based cost management for design and development stage.International Journal of Production Economics,83(2),169-183.
  4. Berthomieu, B.,M. Diaz(1991).Modeling and verification of time dependent systems using time petri nets.IEEE Transactions on Software Engineering.
  5. Boothroyd, G(1994).Product design for manufacture and assembly.Computer Aided Design.
  6. Callioni, G,C. Billington(2001).Effective collaboration.OR/MS Today.
  7. Cooper, R.(1988).The rise of activity-based costing-part one: what is an activity-based cost system.Journal of Cost Management,2,45-54.
  8. Copacino, W.(1997).Supply Chain Management: The Basics and Beyond.
  9. Coyne, R. D.,M. A. Rosenman, Radford, A. D., Balachandran, M., Gero, J. S.(1990).Knowledge-Based Design Systems, Addison-Wesley.
  10. Dowlatshahi S.(1997).The role of product design in designer-buyer-supplier interface.Production Planning and Control.
  11. Dowlatshahi, S.(1999).A modeling approach to logistics in concurrent engineering.European Journal of Operational Research,115(1),59-76.
  12. Dowlatshahi, S.(1996).The role of logistics in concurrent engineering.International Journal of Production Economics.
  13. Ellison, D., K. Clark, T. Fujimoto,Y. Hyun(1995).Working Paper 95-066, Harvard Business SchoolWorking Paper 95-066, Harvard Business School,未出版
  14. Ernst, R.,B. Kamrad(2000).Evaluation of supply chain structures through modularization and postponement.European Journal of Operational Research,124(3),495-510.
  15. Fine, C.(1998).Clockspeed-Winning Industry Control in the Age of Temporary Advantage Perseus Books.
  16. Fisher, M. L.(1997).What is the right supply chain for your product?.Harvard Business Review.
  17. Foo, G., J. P. Clancy, L. E. Kinney,C. R.Lindemulder(1990).Design for material logistics.AT&T Technical Journal,69(3),61.
  18. Gaeta, R.(1996).Efficient discrete-event simulation of colored petri nets.IEEE Transactions on Software Engineering.
  19. Hammer, M.(2001).The Agenda: What Every Business Must Do To Dominate The Decade. Crown Publishing Group.
  20. Hatch, M.,R. D. Badinelli(1999).A concurrent optimization methodology for concurrent engineering.IEEE Transactions on Engineering Management.
  21. Herrmann, J. W., I. Minis,V. Ramachandran(1995).Information models for partner selection in agile manufacturing.Engineering Data Management and Emerging Technologies.
  22. Hwang, C. L., Y. J. Lai,T. Y. Liu(1993).A new approach for multiple objective decision making.Computer Operation Research.
  23. Hwang, C. L.,K. Yoon(1981).Multiple Attribute Decision Making: Methods and Applications. Springer-Verlag.
  24. Ishii, K., C. Juengel,C. F. Eub anks(1995).Design for product variety: Key to product line structuring. ASME Design Engineering Technical Conference.
  25. Jeetendra, V. A., O. V. K. Chetty,J. P. Reddy(2000).Petri nets for project management and resource leveling.International Journal of Advanced Manufacturing Technology,16(7),516-520.
  26. Jensen, K.(1990).Coloured Petri nets: a high level language for system design and analysis, in: G. Rozenberg, eds., Advances in Petri Pets, Vol. 483 of Lecture Notes In Computer Science, Springer-Verlag, Berlin
  27. Kim, G., C. S. Park,K. P. Yoon(1997).Identifying investment opportunities for advanced manufacturing systems with comparative-integrated performance measurement.International Journal of Production Economics,50(1),23-33.
  28. Krikke, H., J. Bloemhof-Ruwaard,L. N. Van Wassenhove(2003).Concurrent product and closed-loop supply chain design with an application to refrigerators.International Journal of Production Research,41(16),3689-3719.
  29. Kumar, A.,L. S. Ganesh(1998).Use of Petri nets for resource allocation in projects.IEEE Transactions on Engineering Management.
  30. Kusiak, A.,H. H. Yang(1993).Modeling the design process with petri nets, in: A. Kusiak, eds., Concurrent Engineering: Automation, Tools, and Techniques, John Wiley & Sons,447-464.
  31. Lee, B.,K. Saitou(2002).Design of part family robust-to-production plan variations based on quantitative manufacturability evaluation.Research in Engineering Design.
  32. Lee, H. L., C. Billington,B. Carter(1993).Hewlett-Packard gains control of inventory and service through design for localization.Interfaces.
  33. Lee, H. L., Sasser, M.(1995).Product universality and design for supply chain management.Production Planning and Control: Special Issue on Supply Chain Management.
  34. Lee, H. L.,S. Whang(2001).E-fulfillment: winning the last mile of e-commerce.Sloan Management Review,42(4),54-62.
  35. Lewis, R. J.(1995).Activity-based Models for Cost Management Systems. Quorum Books, Westport, CT
  36. Liker, J. K., D. K. Sobek,A. C. Ward, Cristiano, J. J.(1996).Involving suppliers in product development in the US and Japan: evidence for set-based concurrent engineering.IEEE Transactions in Engineering Management
  37. Marsan, M. J., G. Balbo,G. Conte(1984).A class of generalized stochastic petri nets for the performance evaluation of multiprocessor systems.ACM Transac lions on Computer Systems
  38. Mather, H.(1992).Design for logistics (DFL)-the next challenge for designers.Production and Inventory Management Journal,33,7-10.
  39. Molloy, O., S. Tilley,E. A. Warman(1998).Design for Manufacturing and Assembly-Concepts, Architectures and Implementations. Chapman & Hall,London:
  40. Monplaisir, L.,N. Singh(2002).Collaborative Engineering for Product Design and Development.American Scientific Publishers.
  41. Murata, T.(1989).Petri nets: properties, analysis and applications.Proceedings of the IEEE.
  42. Nahm Y. E.,H. Ishikawa(2004).Integrated product and process modeling for collaborative design environment.Concurrent Engineering: Research and Applications
  43. Pahi, G., Beitz, W.(1996).Engineering Design: A Systematic Approach, Springer-Verlag
  44. Prasad, B.(1996).Concurrent Engineering Fundamentals: Integrated Product and Process Organization,New York:
  45. Priest, J. W.,J. M. Sanchez(2001).Product Development and Design for Manufacturing: A Collaborative Approach to Producibility and Reliability,New York:
  46. Ranky, P. G.(1994).Concurrent engineering and enterprise modeling.Assembly Automation.
  47. Saaty, T. L.(1994).Fundamentals of Decision Making and Priority Theory with the Analytic Hierarchy Process. RWS Publications, Pittsburgh, PA.
  48. Salvador, F., C. Forza,M. Rungtusanatham(2002).Modularity, product variety, production volume, and component sourcing: theorizing beyond generic prescriptions.Journal of Operations Management,20(5),549-575.
  49. Scheer, A. W.(1998).Business Process Engineering-Reference Models for Industrial Enterprises.
  50. Simchi-Levi, D., P. Kaminsky,E. Simchi-Levi(2003).Managing the Supply Chain: The Definitive Guide for the Business Professional, McGraw-Hill.
  51. Simchi-Levi, D., P. Kaminsky,E. Simchi-Levi(2000).Designing and Managing the Supply Chain: Concepts, Strategies, and Case Studies, McGraw-Hill.
  52. Sobek, II, D.K., A. C. Ward,J. K. Liker(1999).Toyota's principles of set-based concurrent engineering.Sloan Management Review,40(2),67-83.
  53. Spedding, T. A.,G. Q. Sun(1999).Application of discrete event simulation to the activity based costing of manufacturing systems.International Journal of Production Economics,58,289-301.
  54. Stansifer, R., M. Beaven,D. C. Marinescu(1994).Modeling concurrent programs with colored petri nets.Journal of Systems Software,26,29-148.
  55. Project Concept for Product Design for Supply Chain
  56. Taylor, G. D.(1997).Design for global manufacturing and assembly.IIE Transactions.
  57. Turney, P. B.(1990).What is the scope of activity based costing.Journal of Cost Management.
  58. Turney, P. B.(1992).What an activity based costing model look like.Journal of Cost Management.
  59. Ulrich, K. T., S. D. Eppinger(1995).Product Design and Development.
  60. van der Aalst, W. M. P.(1992).Modeling and analysis of complex logistics systems, in: H. J. Pels and J. C. Wortmann.Integration in Production Management Systems, Vol. B-7 of IFIP Transactions, Elservier Science Publishers, Amsterdam.
  61. Workflow Patterns
  62. van der Aalst, W.M.P., K. M. van Hee(1996).Business process redesign: a petri-net-based approach.Computers in Industry.
  63. Van Hee, K. M.(1994).Information System Engineering: A Formal Approach.Cambridge University Press.
  64. Wang, J., J. Terpenny(2003).Interactive evolutionary solution synthesis in fuzzy set-based preliminary engineering design.Journal of Intelligent Manufacturing,14(2),153-167.
  65. Ward, A., J. K. Liker, D. Sobek,J. Cristiano(1995).The second Toyota paradox: how delaying decisions can make better cars faster.Sloan Management Review,36(3),43-61.
  66. Wei, Y.,P. J. Egbelu(2000).A framework for estimating manufacturing cost from geometric design data.International Journal of Computer Integrated Manufacturing,13(1),50-63.
  67. WFMC(1996).Workflow management coalition terminology and glossary. Technical Report (WFMC-TC-l0l 1). Workfiow Management CoalitionWorkflow management coalition terminology and glossary. Technical Report (WFMC-TC-l0l 1). Workfiow Management Coalition,未出版
  68. Wheelwright, S. C.,K. B. Clark(1992).Creating project plans to focus product development.Harvard Business Review.
  69. Yan, H., X. Yu,T. C. E. Cheng(2003).A strategic model for supply chain design with logical constraints: formulation and solution.Computers and Operations Research,30,2135-2155.
  70. Yang, B., N. D. Burns,C. J. Backhouse(2004).Management of uncertainty through postponement.International Journal of Production Research,42(6),1049-1064.
  71. Yang, B.,N. D. Burns(2003).Implications of postponement for the supply chain.International Journal of Production Research,41(9),2075-2090.
  72. Zhou, M. C.,K. Venkatesh(1999).Modeling, Simulation and Control of Flexible Manufacturing Systems: A Petri Net Approach. World Scientific, River Edge, NJ.