参考文献
|
-
Shao, Y.E.,C.D. Hou(2006).Estimation of the starting time of a step change disturbance in a gamma process.Journal of the Chinese Institute of Industrial Engineers
連結:
-
Al-Oraini, H.A.,M.A. Rahim(2003).Economic statistical design of x2 control charts for systems with gamma (5,2) in-control times.Journal of Applied Statistics,30(4),397-409.
-
Borror, C.M.,D.C. Montgomery,G.C. Runger(1999).Robustness of the EWMA control chart to non-normality.Journal of Quality Technology,31(3),309-316.
-
Burr, I.W.(1967).The effect of non-normality on constants for X-bar and R charts.Industrial Quality Control,23,563-568.
-
Chan, L.K.,K.P. Hapuarachchi,B.D. Macpherson(1988).Robustness of x and R charts.IEEE Transactions on Reliability.
-
Chou, C.Y.,C.H. Chen,H.R. Liu(2004).Effect of Nonnormality on the economic design of warning limit charts.Quality Engineering,16(4),567-575.
-
Ferguson, T.S.(1996).A Course in Large Sample Theory.Chapman and Hall.
-
Jamshidian, F.,Y. Zhu(1997).Scenario simulation: theory and methodology.Finance and Stochastics.
-
Levinson, W.(1997).Watch out for nonnormal distributions of impurities.Chemical Engineering Progress.
-
Levinson, W.,A. Polny(1999).SPC for tool particle counts.Semiconductor International.
-
Pal, S.(2005).Evaluation of nonnormal process capability indices using generalized lambda distribution.Quality Engineering,17(1),77-85.
-
Pignatiello, J.J.,T.R. Samuel(2001).Estimation of the change point of a normal process mean in SPC applications.Journal of Quality Technology,33(1),82-95.
-
Samuel, T.R.,J.J. Pignatiello,J.A. Calvin(1998).Identifying the time of a step change with □ control charts.Quality Engineering,10(3),521-527.
-
Samuel, T.R.,J.J. Pignatiello,J.A. Calvin(1998).Identifying the time of a step change in a normal process variance.Quality Engineering,10(2),529-538.
-
Schilling, E.G.,P.R. Nelson(1976).The effect of non-normality on the control limits of charts.Journal of Quality Technology,8(4),183-188.
-
Shao, Y.E.,C.D. Hou(2004).A study on identifying the time of a step change disturbance with S control charts and MLE method.Journal of the Chinese Institute of Industrial Engineers,21(4),349-357.
-
Shewhart, W.A(1931).Economic Control of Quality of Manufactured Product
-
Shore, H.(2000).General control charts for variables.International Journal of Production Research,38(8),1875-1897.
-
Somerville, S.E.,D.C. Montgomery(1996).Process capability indices and nonnormal distributions.Quality Engineering,9(2),305-316.
-
Yourstone, S.A.,W.J. Zimmer(1992).Non-normality and the design of control charts for averages.Decision Science.
-
Zheng, G.,Z. Chen,Z. Li(2003).Tests for candidate-gene association using case-parents design.Annals of Human Genetics.
|