题名

Estimation of the Starting Time of a Step Change Disturbance in a Gamma Process

并列篇名

估計GAMMA製程中階梯式干擾啓始時間點之研究

DOI

10.29977/JCIIE.200607.0006

作者

邵曰仁(Yuehjen E. Shao);侯家鼎(Chia-Ding Hou)

关键词

SPC管制圖 ; gamma製程 ; 干擾 ; 最大槪似估計 ; SPC chart ; gamma process ; disturbance ; maximum likelihood estimation

期刊名称

工業工程學刊

卷期/出版年月

23卷4期(2006 / 07 / 01)

页次

319 - 327

内容语文

英文

中文摘要

由於估計製程干擾的啟始時間點能快速地決定失控製程的根本原因,因而成為製程改善的重要研究主題之一。不同於傳統常態製程之假設,本文探討如何使用(平均值)X管制圖以監督Gamma製程。當失控訊號產生時,我們提出一有效方法以估計製程干擾的啟始時間點;同時,本文將藉由模擬範例以評估我們所提方法之效能。

英文摘要

Due to the quick determination of the root causes for an out-of-control process, the estimation of the starting time of a process disturbance becomes an important issue for the process improvement. In contrast to the typical assumption that the process is normal, this study realizes that the process may follow a gamma distribution. For this reason an (average)X control chart was employed to monitor the gamma process. When an out-of-control signal is triggered, we propose a fruitful approach for estimating the starting time of a process disturbance. A series of simulations were conducted to evaluate the performance of the proposed approach.

主题分类 工程學 > 工程學總論
参考文献
  1. Al-Oraini, H.A.,M.A. Rahim,(2003).Economic statistical design of x2 control charts for systems with gamma (5,2) in-control times.Journal of Applied Statistics,30(4),397-409.
  2. Borror, C.M.,D.C. Montgomery,G.C. Runger(1999).Robustness of the EWMA control chart to non-normality.Journal of Quality Technology,31(3),309-316.
  3. Burr, I.W.(1967).The effect of non-normality on constants for X-bar and R charts.Industrial Quality Control,23,563-568.
  4. Chan, L.K.,K.P. Hapuarachchi,B.D. Macpherson(1988).Robustness of x and R charts.IEEE Transactions on Reliability,37(3),117-123.
  5. Chou, C.Y. C.H. Chen,H.R. Liu(2004).Effect of Nonnormality on the economic design of warning limit charts.Quality Engineering,16(4),567-575.
  6. Levinson, W.(1997).Watch out for nonnormal distributions of impurities.Chemical Engineering Progress,93(5),70-76.
  7. Levinson, W.,A. Polny(1999).SPC for tool particle counts.Semiconductor International,117-122.
  8. Pal, S.(2005).Evaluation of nonnormal process capability indices using generalized lambda distribution.Quality Engineering,17(1),77-85.
  9. Pignatiello, J. J.,T. R. Samuel(2001).Estimation of the change point of a normal process mean in SPC applications.Journal of Quality Technology,33(1),82-95.
  10. Samuel, T. R.,J. J. Pignatiello,J. A. Calvin(1998).Identifying the time of a step change in a normal process variance.Quality Engineering,10(3),529-538.
  11. Samuel, T. R.,J. J. Pignatiello,J. A. Calvin(1998).Identifying the time of a step change with X control charts.Quality Engineering,10(3),521-527.
  12. Schilling, E. G.,P. R. Nelson(1976).The effect of non-normality on the control limits of charts.Journal of Quality Technology,8(4),183-188.
  13. Shao, Y. E(1998).Integrated application of the cumulative score control chart and engineering process control.Statistica Sinica,8(1),239-252.
  14. Shao, Y. E.,C. D. Hou(2004).A study on identifying the time of a step change disturbance with S control charts and MLE method.Journal of the Chinese Institute of Industrial Engineers,21(4),349-357.
  15. Shao, Y. E.,G. C. Runger,J. Haddock,W. A. Wallace(2000).Adaptive controllers to integrate SPC and EPC.Communications in Statistics-Simulation and Computation,28(1),13-36.
  16. Shewhart, W. A(1931).Economic Control of Quality of Manufactured Product
  17. Shore, H.(2000).General control charts for variables.International Journal of Production Research,38(8),1875-1897.
  18. Somerville, S. E.,D. C. Montgomery(1996).Process capability indices and nonnormal distributions.Quality Engineering,9(2),305-316.
  19. Yourstone, S. A.,W. J. Zimmer(1992).Non-normality and the design of control charts for averages.Decision Science,23(5),1099-1113.
被引用次数
  1. Wang, Hsueh-Ju,Shao, Yuehjen E.,Hou, Chia-Ding(2006).ESTIMATION OF THE CHANGE POINT OF A GAMMA PROCESS BY USING THE S CONTROL CHART AND MLE.工業工程學刊,23(3),207-214.