参考文献
|
-
Kim, Y. J.,B. R. Cho(2003).Determining the optimum process mean for a skewed process.International Journal of Industrial Engineering-Theory Applications and Practice,10,555-561.
連結:
-
Bowling, S. R.,M. T. Khasawneh,S. Kaewkuekool,B. R. Cho(2004).Markovian approach to determining optimum process target levels for a multi-stage serial production system.European Journal of Operational Research,159,636-650.
-
Chan, W. M.,R. N. Ibrahim(2004).Evaluating the quality level of a product with multiple quality characteristics.International Journal of Advanced Manufacturing Technology,24,738-742.
-
Chan, W. M.,R. N. Ibrahim,P. B. Lochert(2005).Evaluating the product quality level under multiple L-type quality characteristics.International Journal of Advanced Manufacturing Technology,27,90-95.
-
Chan, W. M.,R. N. Ibrahim,P. B. Lochert(2005).Quality evaluation model using loss function for multiple S-type quality characteristics.International Journal of Advanced Manufacturing Technology,26,98-101.
-
Chen, C.H.(2006).The modified Pulak and Al-Sultan`s model for determining the optimum process parameters.Communications in Statistics-Theory and Methods,35,1767-1778.
-
Chen, S. L.,K. J. Chung(1994).Inspection error effects on economic selection of target value for a production process.European Journal of Operational Research,79,311-324.
-
Chen, S. L.,K. J. Chung(1996).Selection of the optimal precision level and target value for a production process: the lower-specification-limit case.IIE Transactions,28,979-985.
-
Duffuaa, S. O.,A. W. Siddiqui(2003).Process targeting with multi-class screening and measurement error.International Journal of Production Research,41,1373-1391.
-
Feng, Q.,K. C. Kapur(2006).Economic design of specifications for 100% inspection with imperfect measurement systems.Quality Technology & Quantitative Management,3,127-144.
-
Feng, Q.,K. C. Kapur(2006).Economic development of specifications for 100% inspection based on asymmetric quality loss functions.IIE Transactions,38,659-669.
-
Ferrell, W. G.,A. Chhoker(2002).Design of economically optimal acceptance sampling plans with inspection error.Computers and Operations Research,29,1283-1300.
-
Hariga, M. A.,M. A. Al-Fawzan(2005).Joint determination of target value and production run for a process with multiple markets.International Journal of Production Economics,96,201-212.
-
Hong, S. H.,E. A. Elsayed(1999).The optimum mean for processes with normally distributed measurement error.Journal of Quality Technology,31,338-344.
-
Hong, S. H.,H. Kwon,M. K. Lee,B. R. Cho(2006).Joint optimization in process target and tolerance limit for L-type quality characteristics.International Journal of Production Research,44,3051-3060.
-
Kapur, K. C.(1988).An approach for development of specifications for quality improvement.Quality Engineering,1,63-77.
-
Kapur, K. C.,B. R. Cho(1994).Economic design and development of Specifications.Quality Engineering,6,401-417.
-
Kapur, K. C.,B. R. Cho(1996).Economic design of the specification region for multiple quality characteristics.IIE Transactions,28,237-248.
-
Kapur, K. C.,Wang, C. J.,R. E. DeVor,S. G. Kapoor (eds)(1987).Quality: Design, Planning, and Control.Boston, MA:The American Society of Mechanical Engineers.
-
Lee, M. K.,S. B. Kim,H. M. Kwon,S. H. Hong(2004).Economic selection of mean value for a filling process under quadratic quality loss.International Journal of Reliability, Quality and Safety Engineering,11,81-90.
-
Markowski, E. P.,C. A. Markowski(2002).Improved attribute acceptance sampling plans in the presence of misclassification error.European Journal of Operational Research,139,501-510.
-
Pulak, M. F. S.,K. S. Al-Sultan(1996).The optimum targeting for a single filling operation with rectifying inspection.Omega,24,727-733.
-
Rahim, M. A.,F. Tuffaha(2004).Integrated model for determining the optimal initial settings of the process mean and optimal production run assuming quadratic loss functions.International Journal of Production Research,42,3281-3300.
-
Taguchi, G.(1986).Introduction to Quality Engineering.Tokyo, Japan:Asian Productivity Organization.
-
Tang, K.(1987).The effects of inspection error on a complete inspection plan.IIE Transactions,19,421-428.
-
Tang, K.,J. Tang(1994).Design of screening procedure: a review.Journal of Quality Technology,26,209-226.
-
Taseli, A.,G. Kohsal(2006).The effect of inspection error and rework on quality loss.Proceedings of the 35th International Conference on Computers and Industrial Engineering,Istanbul, Turkey:
-
Teeravaraprug, J.(2005).Determining optimal process mean of two-market products.International Journal of Advanced Manufacturing Technology,25,1248-1253.
|