题名

Supplier Integration and Time-Based Capabilities: An Empirical Study

并列篇名

供應商整合實務對時基能力的影響關係實證研究

DOI

10.29977/JCIIE.200905.0007

作者

林如貞(Ru-Jen Lin)

关键词

供應商整合實務 ; 時基能力 ; 供應鏈管理 ; supplier integration ; time-based capabilities ; supply chain management

期刊名称

工業工程學刊

卷期/出版年月

26卷3期(2009 / 05 / 01)

页次

215 - 227

内容语文

英文

中文摘要

產業鏈內供應商整合被視爲企業改善經營績效、提昇競爭優勢之重要策略。本研究主要係探討供應商整合活動與時基能力間之關係,並指出供應商整合與時基能力係爲多元概念,對提昇時基競爭力而言,並非所有的供應商間協同活動皆具有同等之影響效益。本研究以過去的文獻爲基礎,選定評估供應商整合活動包括:供應商參與程度、賦與供應商零件設計權責性、供應商來源基礎減少程度、供應商承諾性及資訊分享程度。評估這些活動對時基競爭力影響之指標則包括:交貨迅速性、交貨準時性、新產品研發速度及製造週期時間。研究統計結果顯示,若干供應商整合活動對時基競爭力提昇之效益,遠超過其他供應商整合活動。針對不同類型時基績效之提升,本研究提出應遵循之原則,據以決定企業所應發展及投入之供應商整合實務。此外,若干研究假設及於管理方面之應用,亦於本研究中提出討論。

英文摘要

Supplier integration is touted as an imperative strategy to improve firm performance and enhance a firm's competitive advantage in the marketplace. This study investigates the relationship between several supplier integration practices and time-based capabilities. We posit that both supplier integration and time-based capability are multi-dimensional constructs and not all collaborative activities are equally important to all aspects of time-based competition. Based on the literature, several supplier integration activities, including supplier involvement, design integration, supplier base reduction, supplier commitment, and information sharing practices are examined regarding their effect on time-based competition, measured as delivery speed, new product development time, delivery reliability, and manufacturing cycle time. The statistical findings indicate while supplier integration contributes to the performance of a firm's time-based competition, some integration practices are more effective than others. The results provide specific guidelines for firms to develop and implement different supplier integration practices for enhancing specific kinds of time-based capabilities. Finally, research propositions are presented and several managerial implications are discussed.

主题分类 工程學 > 工程學總論
参考文献
  1. Amstrong, J. S.,T. S. Overton(1977).Estimating non-response bias in mail surveys.Journal of Marketing Research,4,396-402.
  2. Anderson, E.,B. Weitz(1992).The use of pledges to build and sustain commitment in distribution channels.Journal of Marketing Research,29,18-34.
  3. Asanuma, B.(1989).Manufacturer-supplier relationships in Japan and the concept of relation-specific skill.Journal of the Japanese and International Economies,3,1-30.
  4. Cannon, J. P.,W. D. Perreault(1999).Buyer-seller relationships in business markets.Journal of Marketing Research,36,439-460.
  5. Carr, A. S.,J. N. Pearson(1999).Strategically managed buyer-supplier relationships and performance outcomes.Journal of Operations Management,17,497-519.
  6. Carter, J. R.,J. G. Miller(1989).The impact of alternative vendor/buyer communication structures on the quality of purchased materials.Decision Sciences,20,759-776.
  7. Carter, P. L.,S. A. Melnyk,R. B. Handfield(1995).Identifying the basic process strategies for time-based competition.Production and Inventory Management Journal,36,65-70.
  8. Chen, I. J.,A. Paulraj(2004).Understanding supply chain management: critical research and a theoretical framework.International Journal of Production Research,42,131-163.
  9. Chen, I. J.,A. Paulraj,A. A. Lado(2004).Strategic purchasing, supply management, and firm performance.Journal of Operations Management,22,505-523.
  10. Choi, T. Y.,D. R. Krause(2006).The supply base and its complexity: implications for transaction costs, risks, responsiveness, and innovation.Journal of Operations Management,24,637-652.
  11. Churchill, G. A.(1979).A paradigm for developing better measures of marketing constructs.Journal of Marketing Research,16,64-73.
  12. Clark, K. B.(1989).Project scope and project performance: the effect of parts strategy and supplier involvement on product development.Management Science,35,1247-1263.
  13. Clark, K. B.,T. Fujimoto(1991).Product Development Performance: Strategy Organization and Management in the World Auto Industry.MA:Harvard Business School Press.
  14. De Meyer, A.,K. Ferdows(1990).Influence of manufacturing improvement programmes on performance.International Journal of Operations and Production Management,10,120-131.
  15. Derocher, R. P.,J. Kilpatrick(2000).Six supply chain lessons for the new millennium.Supply Chain Management Review,3,34-41.
  16. Droge, C.,J. Jayaram,S. K. Vickery(2004).The effects of internal versus external integration practices on time-Based performance and overall firm performance.Journal of Operations Management,22,557-573.
  17. Dyer, J. H.(1997).Effective interfirm collaboration: how firms minimize transaction costs and maximize transaction value.Strategic Management Journal,18,535-556.
  18. Dyer, J. H.,H. Singh(1998).The relational view: cooperative strategy and sources of interorganizational competitive advantage.The Academy of Management Review,23,660-679.
  19. Evans, P. B.,E. J. Wurster(1997).Strategy and the new economics of information.Harvard Business Review,75,71-82.
  20. Funk, J. L.(1993).Japanese product-development strategies: a summary and propositions about their implementation.IEEE Transactions on Engineering Management,40,224-236.
  21. Gadde, L. E.,H. Hakansson(1994).The changing role of purchasing: reconsidering three strategic issues.European Journal of Purchasing and Supply Management,1,27-35.
  22. Gerwin, D.(1993).Manufacturing flexibility: a strategic perspective.Management Science,39,395-410.
  23. Grover, V.,J. T. Teng,K. D. Fiedler(1993).Information technology enabled business process redesign: an integrated planning framework.Omega,21,433-447.
  24. Hahn, C. K.,K. H. Kim,J. S. Kim(1986).Costs of competition: implications for purchasing strategy.International Journal of Purchasing and Materials Management,22,2-7.
  25. Hair, J. F.,R. E. Anderson,R. L. Tatham,W. C. Black(1998).Multivariate Data Analysis.NJ:Prentice Hall.
  26. Handfield, R. B.,C. Bechtel(2002).The role of trust and relationship structure in improving supply chain responsiveness.Industrial Marketing Management,31,367-382.
  27. Handfield, R. B.,R. T. Pannesi(1992).An empirical study of delivery speed and reliability.International Journal of Operations & Production Management,12,58-72.
  28. Handfield, R. B.,R. T. Pannesi(1995).Antecedents of lead-time competitiveness in make-to-order manufacturing firms.International Journal of Production Research,33,511-537.
  29. Hartley, J. L.,B. J. Zirger,R. R. Kamath(1997).Managing the buyer-supplier interface for on-time performance in product development.Journal of Operations Management,15,57-70.
  30. Hartley, J. L.,J. R. Meredith,D. McCutcheon,R. R. Kamath(1997).Supplier contributions to product development: an exploratory study.IEEE Transactions on Engineering Management,44,258-267.
  31. Heide, J. B.,G. John(1990).Alliances in industrial purchasing: the determinants of joint action in buyer-supplier relationships.Journal of Marketing Research,27,24-36.
  32. Helper, S.(1991).How much has really changed between U.S. automakers and their suppliers?.Sloan Management Review,32,15-28.
  33. Hoe, S. L.(2008).Issues and procedures in adopting structural equation modeling technique.Journal of Applied Quantitative Methods,3,76-83.
  34. Jayaram, J.,S. K. Vickery,C. Droge(1999).An empirical study of time-based competition in the North American automotive supplier industry.International Journal of Operations and Production Management,19,1010-1033.
  35. John, S.,K. C. Heriot(1993).Small suppliers and JIT purchasing.International Journal of Purchasing and Materials Management,29,11-16.
  36. Johnston, D. A.,D. M. McMutcheon,F. I. Stuart,H. Kerwood(2004).Effects of supplier trust on performance of cooperative supplier relationships.Journal of Operations Management,22,23-38.
  37. Kerling, F. N.(1986).Foundations of Behavior Research.NY:Wadsworth.
  38. Kerlinger, F. N.(1979).Behavioral Research: a Conceptual Approach.NY:Hot, Rinehart and Winston.
  39. Koufteros, X. A.(1995).The University of Toledo.
  40. Kumar, N.(1996).The power of trust in manufacturing-retailer relationships.Harvard Business Review,74,92-106.
  41. Larson, P. D.,J. D. Kulchitsky(2000).The use and impact of communication media in purchasing and supply management.Journal of Supply Chain Management,36,29-39.
  42. Lee, H. L.,C. Billington(1992).Managing supply chain inventory: pitfalls and opportunities.Solan Management Review,33,65-73.
  43. Lee, H. L.,V. Padmanabhan,S. Whang(1997).Information distortion in a supply chain: the bullwhip effect.Management Science,43,546-558.
  44. Liker, J. K.,R. R. Kamath,S. N. Wasti(1998).Supplier involvement in design: a comparative survey of automotive supplier in the USA, UK and Japan.International Journal of Quality Science,3,214-238.
  45. Lummus, R. R.,L. K. Duclos,R. J. Vokurka(2003).Supply chain flexibility: building a new model.Global Journal of Flexible Systems Management,4,1-13.
  46. McEvily, B.,A. Marcus(2005).Embedded ties and acquisition of competitive capabilities.Strategic Management Journal,26,1033-1055.
  47. Millson, M. R.,S. P. Raj,D. Wilemon(1992).A survey of major approaches for accelerating new product development.Journal of Product Innovation Management,9,53-69.
  48. Mohr, J. J.,R. S. Sohi(1995).Communication flows in distribution channels: impact on assessments of communication quality and satisfaction.Journal of Retailing,71,393-416.
  49. Narasimhan, R.,S. Talluri,A. Das(2004).Exploring flexibility and execution competencies of manufacturing firms.Journal of Operations Management,22,91-106.
  50. Neter, J.,W. Wasserman,M. H. Kutner(1983).Applied Linear Regression Models.Illinois:Irwin.
  51. Nunnally, I. C.(1978).Psychometric Theory.NY:Mc Graw-Hill.
  52. Park, S.,J. L. Hartley,D. Wilson(2001).Quality management practices and their relationship to buyer's supplier ratings: a study in the Korean automotive industry.Journal of Operations Management,19,695-712.
  53. Petersen, K. P.,R. B. Handfield,G. L. Ragatz(2003).A model of supplier integration into new product development.Journal of Innovation Management,20,284-299.
  54. Prahinski, C.,W. C. Benton(2004).Supplier evaluations: communication strategies to improve supplier performance.Journal of Operations Management,22,39-62.
  55. Ragatz, G. L.,R. B. Handfield,K. J. Petersen(2002).Benefits associated with supplier integration into new product development under conditions of technology uncertainty.Journal of Business Research,55,389-400.
  56. Raia, E.(1993).The design team: suppliers move into the line of fire.Purchasing,115,9-11.
  57. Raia, E.(1988).Purchasing magazine 1988 medal of professional excellence: black & decker.Purchasing,105,46-57.
  58. Roth, A. V.,J. Miller,J. Ettlie(eds),M. Burstein (eds),A. Fiegenbaum (eds)(1990).Manufacturing Strategy.MA:Kluwer Academic.
  59. Sahin, F.,E. P. Robinson(2002).Flow coordination and information sharing in supply chains: review, implications, and directions for future research.Decision Sciences,33,505-536.
  60. Saraph, J. V.,P. G. Benson,R. G. Schroder(1989).An instrument for measuring the critical factors of quality management.Decision Sciences,20,810-829.
  61. Shin, H.,D. A. Collier,D. D. Wilson(2000).Supply management and supplier/buyer performance.Journal of Operations Management,18,317-333.
  62. Stalk, G. H.,T. M. Hout(1990).Competing Against Time: How Time Based Competition is Reshaping Global Markets.NY:The Free Press.
  63. Suarez, F. F.,M. A. Cusumano,C. F. Fine(1996).An empirical study of manufacturing flexibility in printed circuit board assembly.Operations Research,44,223-240.
  64. Susman, G. (eds),J. Dean(1992).Integration Design for Manufacturing for Competitive Advantage.NY:Oxford University Press.
  65. Swink, M.(1999).Threats to new product manufacturability and the effects of development team integration process.Journal of Operations Management,17,691-709.
  66. Takeishi, A.(2001).Bridging inter and intra firm boundaries: management of supplier involvement in automobile product development.Strategic Management Journal,22,403-433.
  67. Tan, C. L.,M. A. Vonderembse(2006).Mediating effects of computer-aided design usage: from concurrent engineering to product development performance.Journal of Operations Management,24,494-510.
  68. Tersine, R. J.,E. A. Hummingbird(1995).Lead-time reduction: the search for competitive advantage.International Journal of Operations and Production Management,15,8-18.
  69. Towill, D. R.(1997).The seamless chain the predator's strategic advantage.International Journal of Technology Management,13,37-56.
  70. Tracey, M.,M. A. Vonderembse,J. S. Lim(1999).Manufacturing technology and strategy formulation: keys to enhancing competitiveness and improving performance.Journal of Operations Management,17,411-428.
  71. Tu, Q.,M. A. Vonderembse,T. S. Ragu-Nathan,B. Gu-Nathan(2004).Measuring modularity-based manufacturing practices and their impact on mass customization capability: a customer-driven perspective.Decision Sciences,35,147-167.
  72. Turnbull, P.,N. Oliver,B. Wilkinson(1992).Buyer-supplier relations in the UK automotive industry: strategic implication of the Japanese manufacturing model.Strategic Management,13,159-168.
  73. Wang, Y. S.,Y. M. Wang,H. H. Lin,T. I. Tang(2003).Determinants of user acceptance of Internet banking: an empirical study.International Journal of Service Industry Management,14,501-519.
  74. Ward, P.,H. Zhou(2006).Impact of information technology integration and lean/just-in-time practices on lead-time performance.Decision Sciences,37,177-203.
  75. Wasti, S. N.,J. K. Liker(1999).Collaborating with supplier in product development: a U.S. and Japan comparative study.IEEE Transactions on Engineering Management,46,444-461.
  76. Wheelwright, S. C.,K. B. Clark(1992).Revolutionalizing Product Development.NY:The Free Press.
  77. Zaheer, A.,B. McEvily,V. Perrone(1998).Does trust matter? exploring the effects of interorganizational and interpersonal trust on performance.Organization Science,9,141-159.