参考文献
|
-
Björk, K. M.(2009).An analytical solution to a fuzzy economic order quantity problem.International Journal of Approximate Reasoning,50(3),485-493.
-
Cárdenas-Barrón, L. E.(2008).Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation.Computers & Industrial Engineering,55(4),758-765.
-
Cárdenas-Barrón, L. E.(2001).The economic production quantity (EPQ) with shortage derived alge-braically.International Journal of Production Economics,70,289-292.
-
Chang, H. C.(2004).An implication of fuzzy sets theory to the EOQ model with imperfect quality items.Computers and Operations Research,31,2079-2092.
-
Chen, C. K.,Lo, C. C.,Liao, Y. X.(2008).Optimal lot size with learning consideration on an imperfect production system with allowable shortages.International Journal of Production Economics,113(1),459-469.
-
Chia-Huei, H.(2009).A minimax distribution free procedure for an integrated inventory model with defective goods and stochastic lead time demand.International Journal of Information and Management Sciences,20,161-171.
-
Chiu, S. W.(2007).Optimal replenishment policy for imperfect quality EMQ model with rework and back-logging.Applied Stochastic Models in Business and Industry,23(2),165-178.
-
Chiu, S. W.(2008).Production lot size problem with failure in repair and backlogging derived without derivatives.European Journal of Operational Research,188(2),610-615.
-
Chiu, S. W.,Chiu, Y. S. P.(2006).Mathematical modelling for production system with backlogging and failure in repair.Journal of Scientific and Industrial Research,65(6),499-506.
-
Chiu, Y. S. P.(2003).Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging.Engineering Optimization,35(4),427-437.
-
Chung, K. J.,Hou, K. L.(2003).An optimal production run time with imperfect production processes and allowable Shortage.Computers & Operations Research,30(4),483-490.
-
Dubois, D.,Prade, H.(1980).Fussy Sets and System: Theory and Implications.New York:Academic Press.
-
Grubbström, R. W.,Erdem, A.(1999).The EOQ with backlogging derived without dervatives.International Journal of Production Economics,59(1),529-530.
-
Hayek, P. A.,Salameh, M. K.(2001).Production lot size with the reworking of imperfect quality items produced.Production Planning and Control,12(6),584-590.
-
Kaufmann, A.,Gupta, M.(1991).Introduction to Fuzzy Arithmetic: Theory and Implications.New York:Van Nostrand, Reinhold.
-
Kim, C. H.,Hong, Y.(1999).An optimal run length in deteriorating production process.International Journal of Production Economics,58(2),183-189.
-
Lee, W. C.,Wu, J. W.(2002).A EOQ model for items with Weibull distributed deteriorations, shortages and power demand pattern.International Journal of Information and Management Sciences,13,19-34.
-
Lin, H. D.,Chiu, Y. S. P.,Ting, C. K.(2008).A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging.Computers & Mathematics with Implications,56(11),2819-2824.
-
Ouyang, L. Y.,Chang, H. C.(2000).EMQ model with variable lead time and imperfect production process.International Journal of Information and Management Sciences,11,1-10.
-
Pu, P. U.,Liu, Y. M.(1980).Fuzzy Topology 1, Neighborhood structure of a fuzzy point and Moore-Smith convergence.Journal of Analysis and Implications,76,571-599.
-
Rosenblatt, M. J.,Lee, H. L.(1986).Economic production cycles with imperfect production processes.IIE Transactions,18,48-55.
-
Vijayan, T.,Kumaran, M.(2008).Inventory models with a mixture of backorders and lost sales under fuzzy cost.European Journal of Operational Research,189(1),105-119.
-
Vijayan, T.,Kumaran, M.(2009).Fuzzy economic order time models with random demand.International Journal of Approximate Reasoning,50(3),529-540.
-
Yao, J. S.,Wu, K.(2000).Ranking fuzzy numbers based on decomposition principle and signed distance.Fuzzy sets and Systems,116(2),275-288.
|