题名

Fuzzy Economic Production Quantity Models for Items with Imperfect Quality

DOI

10.6186/IJIMS.2011.22.1.3

作者

Jin-Song Hu;Ru-Qian Xu;Cai-Yun Guo

关键词

Inventory ; fuzzy set ; imperfect quality ; screening rate ; economic production quantity

期刊名称

International Journal of Information and Management Sciences

卷期/出版年月

22:1(2011 / 03 / 01)

页次

43 - 58

内容语文

英文

英文摘要

This article considers the economic production quantity problem with imperfect items in the fuzzy sense. Two economic production quantity models with fuzzy defective rate (LR-fuzzy number) are constructed, in which Model 1 is developed when the screening rate is lower than production rate consider and model 2 is proposed when the screening rate is greater than production rate. The signed distance and sample algebraic method are employed to find the optimal production quantity in the fuzzy sense so that the total cost per unit time in the fuzzy sense has a minimum value. The relationship between model 1 and model 2 is revealed through theoretical analysis. Furthermore, numerical examples are provided to illustrate the results of proposed model.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 管理學
参考文献
  1. Björk, K. M.(2009).An analytical solution to a fuzzy economic order quantity problem.International Journal of Approximate Reasoning,50(3),485-493.
  2. Cárdenas-Barrón, L. E.(2008).Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation.Computers & Industrial Engineering,55(4),758-765.
  3. Cárdenas-Barrón, L. E.(2001).The economic production quantity (EPQ) with shortage derived alge-braically.International Journal of Production Economics,70,289-292.
  4. Chang, H. C.(2004).An implication of fuzzy sets theory to the EOQ model with imperfect quality items.Computers and Operations Research,31,2079-2092.
  5. Chen, C. K.,Lo, C. C.,Liao, Y. X.(2008).Optimal lot size with learning consideration on an imperfect production system with allowable shortages.International Journal of Production Economics,113(1),459-469.
  6. Chia-Huei, H.(2009).A minimax distribution free procedure for an integrated inventory model with defective goods and stochastic lead time demand.International Journal of Information and Management Sciences,20,161-171.
  7. Chiu, S. W.(2007).Optimal replenishment policy for imperfect quality EMQ model with rework and back-logging.Applied Stochastic Models in Business and Industry,23(2),165-178.
  8. Chiu, S. W.(2008).Production lot size problem with failure in repair and backlogging derived without derivatives.European Journal of Operational Research,188(2),610-615.
  9. Chiu, S. W.,Chiu, Y. S. P.(2006).Mathematical modelling for production system with backlogging and failure in repair.Journal of Scientific and Industrial Research,65(6),499-506.
  10. Chiu, Y. S. P.(2003).Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging.Engineering Optimization,35(4),427-437.
  11. Chung, K. J.,Hou, K. L.(2003).An optimal production run time with imperfect production processes and allowable Shortage.Computers & Operations Research,30(4),483-490.
  12. Dubois, D.,Prade, H.(1980).Fussy Sets and System: Theory and Implications.New York:Academic Press.
  13. Grubbström, R. W.,Erdem, A.(1999).The EOQ with backlogging derived without dervatives.International Journal of Production Economics,59(1),529-530.
  14. Hayek, P. A.,Salameh, M. K.(2001).Production lot size with the reworking of imperfect quality items produced.Production Planning and Control,12(6),584-590.
  15. Kaufmann, A.,Gupta, M.(1991).Introduction to Fuzzy Arithmetic: Theory and Implications.New York:Van Nostrand, Reinhold.
  16. Kim, C. H.,Hong, Y.(1999).An optimal run length in deteriorating production process.International Journal of Production Economics,58(2),183-189.
  17. Lee, W. C.,Wu, J. W.(2002).A EOQ model for items with Weibull distributed deteriorations, shortages and power demand pattern.International Journal of Information and Management Sciences,13,19-34.
  18. Lin, H. D.,Chiu, Y. S. P.,Ting, C. K.(2008).A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging.Computers & Mathematics with Implications,56(11),2819-2824.
  19. Ouyang, L. Y.,Chang, H. C.(2000).EMQ model with variable lead time and imperfect production process.International Journal of Information and Management Sciences,11,1-10.
  20. Pu, P. U.,Liu, Y. M.(1980).Fuzzy Topology 1, Neighborhood structure of a fuzzy point and Moore-Smith convergence.Journal of Analysis and Implications,76,571-599.
  21. Rosenblatt, M. J.,Lee, H. L.(1986).Economic production cycles with imperfect production processes.IIE Transactions,18,48-55.
  22. Vijayan, T.,Kumaran, M.(2008).Inventory models with a mixture of backorders and lost sales under fuzzy cost.European Journal of Operational Research,189(1),105-119.
  23. Vijayan, T.,Kumaran, M.(2009).Fuzzy economic order time models with random demand.International Journal of Approximate Reasoning,50(3),529-540.
  24. Yao, J. S.,Wu, K.(2000).Ranking fuzzy numbers based on decomposition principle and signed distance.Fuzzy sets and Systems,116(2),275-288.
被引用次数
  1. Chang, Hung-Chi(2012).Determining Replenishment Lot Size and Shipment Policy in an EPQ Model with Quality Assurance: An Alternative Approach and Analysis.International Journal of Information and Management Sciences,23(2),323-332.
  2. (2012).Determining Replenishment Lot Size and Shipment Policy in an EPQ Model with Quality Assurance: An Alternative Approach and Analysis.International Journal of Information and Management Sciences,23(3),323-332.