题名

Working Vacation Queue with Service Interruption and Multi Optional Repair

DOI

10.6186/IJIMS.2011.22.2.4

作者

Madhu Jain;G. C. Sharma;Richa Sharma

关键词

M/E(subscript k)/1 queue ; state dependent rates ; working vacation ; multi-optional repair ; probability generating function ; queue size

期刊名称

International Journal of Information and Management Sciences

卷期/出版年月

22:2(2011 / 06 / 01)

页次

157 - 176

内容语文

英文

英文摘要

In this investigation, we deal with a state dependent M/E(subscript k)/1 queueing system with working vacation (WV), service interruption and multi-optional repair. When the system becomes empty, the server leaves the system and takes working vacation for random time during which he may perform some secondary work. The server is also subjected to break- down and requires multi optional repair for restoration. The vacation time and the life time of the server are exponentially distributed. The service times are assumed to be Erlangian distributed for both working vacation and busy states of the server. The customers arrive at the service station according to Poisson process with rates dependent upon the status of the server. We employ a generating function technique to obtain the expected number of customers and other system characteristics. The cost function is constructed by considering different cost elements of the system states. By taking illustration, numerical experiment is performed to validate the analytical results. The sensitivity analysis has also been done to examine the effect of different parameters on the system performance characteristics.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 管理學
参考文献
  1. Arumuganathan, R.,Jeyakumar, S.(2005).Steady state analysis of a bulk queue with multiple vacations, setup times with N-policy and closedown times.Applied Mathematical Modelling,29,972-986.
  2. Choudhury, G.(2009).An M/G/1 retrial queue with an additional phase of second service and general retrial times.International Journal of Information and Management Science,20,1-14.
  3. Choudhury, G.,Deka, K.(2008).An M/G/1 retrial queueing system with two phases of service subject to server breakdown and repair.Performance Evaluation,65(10),714-724.
  4. Choudhury, G.,Deka, K.(2009).A note on M/G/1 queue with two phases of service and linear repeated attempts subject to random breakdown.International Journal of Information and Management Science,20,547-563.
  5. Choudhury, G.,Tadj, L.(2009).An M/G/1 queue with two phases of service subject to the server breakdown and delayed repair.Applied Mathematics and Computation,33(6),2699-2709.
  6. Goswami, C.,Selvaraju, N.(2010).The discrete-time MAP/PH/1 queue with multiple working vacations.Applied Mathematical and Modelling,34(4),931-946.
  7. Gross, D.,Harris, C. M.(1985).Fundamentals of Queueing Theory.New York:John Wiley and Sons.
  8. Gupta, U. C.,Sikdar, K.(2004).The finite-buffer M/G/1 queue with general bulk-service rule and single vacation.Performance Evaluation,57(2),199-219.
  9. Jain, M.,Jain, A.(2010).Working vacations queueing model with multiple types of server breakdowns.Applied Mathematical Modelling,34(1),1-13.
  10. Ke, J. C.(2008).An M[x]/G/1 system with startup server and j additional options for service.Applied Mathematical Modelling,33(7),3186-3196.
  11. Ke, J. C.(2007).Bi-level control for batch arrival queues with an early start-up and un-reliable server.Applied Mathematical Modelling,28(5),469-485.
  12. Ke, J. C. ,Chang, F. M.(2009).M[x]/(G1,G2)/1 retrial queue under Bernoulli vacation schedules with general repeated attempts and starting failures.Applied Mathematical Modelling,32(4),443-458.
  13. Li, J. H.,Tian, N. S.,Ma, Z. Y.(2007).Performance analysis of GI/M/1 queue with working vacations.Operations Research Letters,35(5),595-600.
  14. Madan, K.C.,Al-Rawwash, M.(2005).On the MX/G/1 queue with feedback and optional server vacations based on a single vacation policy.Applied Mathematical and Computation,160(3),909-919.
  15. Medhi, J.(2000).Stochastic Processes.New Delhi:Wiley Eastern Limited.
  16. Omey, E.,Gulck, S. V.(2008).Maximum entropy analysis of the M[x]/M/1 queueing system with multiple vacation and server breakdowns.Computers & Industrial Engineering,54(4),1078-1086.
  17. Palaniammal, S.,Nadarajan, R.,Afthab Begum, M. I.(2006).Erlangian bulk service queueing model with server's single vacation.International Journal of Management Systems,22(2),175-187.
  18. Servi, L. D.,Finn, S. G.(2002).M/M/1 queues with working vacations (M/M/1/WV).Performance Evaluation,50,41-52.
  19. Wang, J.(2004).An M/G/1 queue with second optional service and server breakdowns.Computers & Mathematics with Applications,47(10-11),1713-1723.
  20. Wang, K. H.,Huang, K. B.(2009).A maximum entropy approach for the p,N-policy M/G/1 queue with removable and unreliable server.Applied Mathematical Modelling,33(4),2024-2034.
  21. Wu, D. A.,Takagi, H.(2006).An M/G/1 queues with multiple working vacations and exhaustive service discipline.Performance Evaluation,63(7),654-681.
  22. Yang, W. S.,Kim, J. D.,Chae, J. C.(2002).Analysis of M/G/1 stochastic clearing system.Stochastic Analysis with Applications,20(5),1083-1100.
  23. Zadeh, A. B.,Shahkar, G. H.(2008).A two phases queue system with Bernoulli feedback and Bernoulli schedule server vacation.International Journal of Information and Management Science,19(2),329-338.