题名

Vendor-Buyer Integrated Inventory Model with Quality Improvement and Negative Exponential Lead Time Crashing Cost

DOI

10.6186/IJIMS.2013.24.4.3

作者

M. Vijayashree;R. Uthayakumar

关键词

Integrated inventory model ; vendor buyer coordination ; controllable lead time crashing cost ; supply chain management

期刊名称

International Journal of Information and Management Sciences

卷期/出版年月

24卷4期(2013 / 12 / 01)

页次

307 - 327

内容语文

英文

英文摘要

In this paper, we consider the vendor buyer integrated inventory model with lead time reduction for non defective and defective items under investment for quality improvement. This paper presents an integrated inventory quality improvement investment and crashing cost by simultaneously optimizing the optimal order quantity, lead time, process quality and number of deliveries for non defective and defective items. Negative exponential lead time crashing cost is considered in the proposed model. Lead time is an important element in any inventory management system. In many practical situations, lead time can be reduced by an additional crashing cost, that is, lead time is controllable. Here, the buyer lead time can be shortened by paying an additional crashing cost which is negative exponential function of lead time. The objective is to minimize the total cost incurred by the vendor and the buyer. In this study first, we developed mathematical model and procedure of finding the optimal solution is developed. An iterative procedure is developed to find the optimal solution and numerical examples are presented to illustrate the result of the proposed model. The result are illustrate with the help of numerical example. Graphical representation is also presented to illustrate the proposed model.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 管理學
参考文献
  1. Banerjee, A.(1986).A joint economic-lot-size model for purchaser and vendor.Decision Sciences,17,292-311.
  2. Ben-Daya, M.,Raouf's, A.(1994).Inventory models involving lead time as decision variable.Journal of the Operational Research Society,45,579-582.
  3. Bylka, S.(2003).Competitive and cooperative policies for the vendor-buyer system.International Journal of Production Economics,81-82,533-544.
  4. Cakanyildirim, M.,Bookbinde, J. H.,Gerchak, Y.(2000).Continuous review inventory models where random lead time depends on lot size and reserved capacity.International Journal of Production Economics,68,217-228.
  5. Chandra, C.,Grabis, J.(2008).Inventory management with variable lead time dependent procurement cost.Omega,36,877-887.
  6. Chang, C. T.(2005).A linearization approach for inventory models with variable lead time.Inter-national Journal of Production Economics,96,263-272.
  7. Chen, K. K.,Chang, C. T.(2007).A seasonal demand inventory model with variable lead time and resource constraints.Applied Mathematical Modelling,31,2433-2445.
  8. Chern, M. S.,Pan, Q.,Teng, J. T.,Chan, Y. L.,Chen, S. C.(2013).Stackelberg solution in a vendor-buyer supply chain model with permissible delay in payments.International Journal of Production Economics,144,397-404.
  9. Dey, O.,Chakraborty, D.(2012).A fuzzy random periodic review system with variable lead-time and negative exponential crashing cost.Applied Mathematical Modelling,36,6312-6322.
  10. Gallego, G.,Moon, I.(1993).The distribution of free news boy problem: review and extension.Journal of the Operational Research Society,44,825-834.
  11. Gholami-Qadikolaei, A.,Sobhanallahi, M. A.,Mirzazadeh, A.(2013).Lead time reduction in budget and storage space restricted lot size reorder point inventory models with controllable negative exponential backorder rate.Research Journal of Applied Sciences, Engineering and Technology,5,1557-1567.
  12. Glock, H. C.(2010).Lead time reduction strategies in a single-vendor single-buyer integrated inventory model with lot size dependent lead time and stochastic demand.International Journal of Production Economics,136,37-44.
  13. Goyal, S. K.(1988).A joint economic-lot-size model for purchaser and vendor: A comment.Decision Sciences,19,236-241.
  14. Goyal, S. K.(1976).An integrated inventory model for a single supplier single customer problem.International Journal of Production Research,15,107-111.
  15. Goyal, S. K.,Nebebe, F.(2000).Determination of economic production-shipment policy for a single-vendor single-buyer system.European Journal of Operations Research,121,175-178.
  16. Hadley, G.,Whitin, T.(1963).Analysis of inventory systems.Englewood Cliffs, New Jersey:Prentice Hall.
  17. Hariga, M. A.,Ben-Daya, M.(1999).Some stochastic inventory models with deterministic variable lead time.European Journal of Operational Research,113,42-51.
  18. Ho, C. H.(2009).A minimax distribution free procedure for an integrated inventory model with defective goods and stochastic lead time demand.International Journal of Information and Management Sciences,20,161-171.
  19. Hofmann, C.(1998).Investments in modern production technology and the cash flow-oriented EPQ-model.International Journal of Production Economics,54,193-206.
  20. Hong, J. D.,Hayya, J. C.(1995).Joint investment in quality improvement and setup reduction.Computers and Operations Research,22,567-574.
  21. Hoque, M. A.,Goyal, S. K.(2006).A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal size batch shipments between a vendor and a buyer.International Journal of Production Economics,102,217-225.
  22. Hwang, H.,Kim, D. B.,Kim, Y. D.(1993).Multiproduct economic lot size models with investments costs for setup reduction and quality improvement.International Journal of Production Research,31,691-703.
  23. Jaggi, C. K.,Arneja, N.(2011).Stochastic integrated vendor-buyer model with unstable lead time and setup cost.International Journal of Industrial Engineering Computations,2,123-140.
  24. Jaggi, C. K.,Arneja, N.,Ali, H.(2011).Stochastic integrated vendor-buyer model with negative exponential crashing cost.MR International Journal of Engineering and Technology,3,35-41.
  25. Keller, G.,Noori, H.(1988).Impact of investing in quality improvement on the lot size model.Omega,15,595-601.
  26. Lau, A. H.,Lau, H. S.(2003).Effects of a demand-curve's shape on the optimal solutions of a multi-echelon inventory/pricing model.European Journal of Operational Research,147,530-548.
  27. Lee, W. C.(2005).Inventory model involving controllable backorder rate and variable lead time demand with the mixtures of distribution.Applied Mathematics and Computation,160,701-717.
  28. Lee, W. C.,Wu, J. W.,Hou, W.B.(2004).A note on inventory model involving variable lead time with defective units for mixtures of distribution.International Journal of Production Economics,89,31-44.
  29. Lee, W. C.,Wu, J. W.,Hsu, J. W.(2006).Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate.Applied Mathematics and Computation,175,1125-1138.
  30. Liao, C. J.,Shyu, C. H.(1991).Analytical determination of lead time with normal demand.International Journal of Operations & Production Management,11,72-78.
  31. Lin, Y. J.(2008).Minimax distribution free procedure with backorder price discount.International Journal of Production Economics,111,118-128.
  32. Moon, I.(1994).Multiproduct economic lot size models with investments costs for setup reduction and quality improvement: Review and extensions.International Journal of Production Research,32,2795-2801.
  33. Moon, I.,Choi, S.(1998).A note on lead time and distributional assumptions in continuous review inventory models.Computers and Operations Research,25,1007-1012.
  34. Nasri, F.,Affisco, J. F.,Paknejad, M. T.(1990).Setup cost reduction in an inventory model with finite range stochastic lead times.International Journal of Production Research,28,199-212.
  35. Ouyang, L. Y.,Chang, H. C.(1999).Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process.Production Planning Control,11,598-607.
  36. Ouyang, L. Y.,Chen, C. K.,Chang, H. C.(2002).Quality improvement, setup cost and lead-time reductions in lot sizes reorder point models with an imperfect production process.Computers & Operations Research,29,1701-1717.
  37. Ouyang, L. Y.,Chuang, B. R.(2001).Mixture inventory model involving variable lead time and controllable backorder rate.Computers and Industrial Engineering,40,339-348.
  38. Ouyang, L. Y.,Chuang, B. R.,Wu, K. S.(1994).Optimal inventory policies involving variable lead time with defective items.Journal of the Operational Research Society of India,36,374-389.
  39. Ouyang, L. Y.,Wu, K. S.,Ho, C. H.(2007).An integrated vendor-buyer inventory model with quality improvement and lead time reduction.International Journal of Production Economics,108,349-358.
  40. Ouyang, L. Y.,Wu, K. S.,Ho, C. H.(2004).Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time.International Journal of Production Economics,92,255-266.
  41. Ouyang, L. Y.,Yen, N. C.,Wu, K. S.(1996).Mixture inventory model with backorders and lost sales of variable lead time.International Journal of Production Economics,47,829-832.
  42. Ouyang, L.,Wu, K.(1998).A minimax distribution free procedure for mixed inventory model with variable lead time.International Journal of Production Economics,56-57,511-516.
  43. Paknejad, M. J.,Affisco, J. F.(1987).The effect of investment in new technology on optimal batch quantity.Proceedings of the Northeast Decision Sciences Institute,RI, USA:
  44. Pan, C. H.,Hsiao, Y. C.(2001).Inventory models with backorder discounts and variable lead time.International Journal of System Science,32,925-929.
  45. Pan, J. C. H.,Lo, M. C.,Hsiao, Y. C.(2004).Optimal reorder point inventory models with variable lead time and backorder discount considerations.European Journal of Operational Research,158,488-505.
  46. Pan, J. C. H.,Yang, J. S.(2004).Just-in-time: an integrated inventory model involving deterministic variable lead time and quality improvement investment.International Journal of Production Research,42,853-863.
  47. Pan, J. C. H.,Yang, J. S. A.(2002).Study of an integrated inventory with controllable lead time.International Journal of Production Research,40,1263-1273.
  48. Park, C.(2005).An analysis of the lead time demand distribution in stochastic inventory system.International Journal of Production Economics,11,263-272.
  49. Porteus, E. L.(1986).Optimal lot sizing process quality improvement and setup cost reduction.Operations Research,34,137-144.
  50. Rosenblatt, M. J.,Lee, H. L.(1986).Economic production cycles with imperfect production processes.IIE Transactions,18,48-55.
  51. Sarker, B. R.,Coates, E. R.(1997).Manufacturing setup cost reduction under variable lead times and finite opportunities for investment.International Journal of Production Economics,49,237-247.
  52. Silver, E. A.,Peterson, R.(1985).Decision Systems for Inventory Management and Production Planning.New York:John Wiley.
  53. Teng, J. T.,Crdenas, B. L. E.,Lou, K. R.(2011).The economic lot-size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation.Applied Mathematics and Computation,217,5972-5977.
  54. Tersine, R.(1994).Principle of Inventory and Material Management.USA:Prentice-Hall.
  55. Tsou, C. S.,Fang, H. H.,Lo, H. C.,Huang, C. H.(2009).A study of cooperative advertising in a manufacturer-retailer supply chain.International Journal of Information and Management Sciences,20,15-26.
  56. Villa, A.(2001).Introducing some supply chain management problems.International Journal of Production Economics,73,1-4.
  57. Viswanathan, S.(1998).Optimal strategy for the integrated vendor-buyer inventory model.European Journal of Operational Research,105,38-42.
  58. Wu, J. W.,Lee, W. C.,Tsai, H. Y.(2007).Computational algorithmic procedure of optimal inventory policy involving a negative exponential crashing cost and variable lead time demand.Applied Mathematics and Computation,184,798-808.
  59. Wu, J. W.,Tasi, H. Y.(2001).Mixture inventory model with back orders and lost sales for variable lead time demand with the mixtures of normal distribution.International Journal of System Science,32,259-268.
  60. Wu, K. S.(2001).Continuous review inventory model with permissible delay in payment.International Journal of Information and Management Sciences,12,57-66.
  61. Yang, G.,Ronald, R. T.,Chu, P.(2005).Inventory models with variable lead time and present value.European Journal of Operational Research,164,358-366.
  62. Yang, M. F.,Lo, M. C.,Lu, T. P.(2013).A vendor-buyers integrated inventory model involving quality improvement investment in a supply chain.Journal of Marine Science and Technology,21,586-593.
  63. Yang, P. C.,Wee, H. M.(2001).An arborescent inventory model in a supply chain system.Production Planning & Control,12,728-735.
被引用次数
  1. Yu, Jonas C. P.,Wu, Chia-Hung,Chen, Jen-Ming(2014).Pricing Strategy for Product Reuse with Multiple Quality Levels and Price- and Availability-Dependent Demand.International Journal of Information and Management Sciences,25(1),51-66.