参考文献
|
-
Banerjee, A.(1986).A joint economic-lot-size model for purchaser and vendor.Decision Sciences,17,292-311.
-
Ben-Daya, M.,Raouf's, A.(1994).Inventory models involving lead time as decision variable.Journal of the Operational Research Society,45,579-582.
-
Bylka, S.(2003).Competitive and cooperative policies for the vendor-buyer system.International Journal of Production Economics,81-82,533-544.
-
Cakanyildirim, M.,Bookbinde, J. H.,Gerchak, Y.(2000).Continuous review inventory models where random lead time depends on lot size and reserved capacity.International Journal of Production Economics,68,217-228.
-
Chandra, C.,Grabis, J.(2008).Inventory management with variable lead time dependent procurement cost.Omega,36,877-887.
-
Chang, C. T.(2005).A linearization approach for inventory models with variable lead time.Inter-national Journal of Production Economics,96,263-272.
-
Chen, K. K.,Chang, C. T.(2007).A seasonal demand inventory model with variable lead time and resource constraints.Applied Mathematical Modelling,31,2433-2445.
-
Chern, M. S.,Pan, Q.,Teng, J. T.,Chan, Y. L.,Chen, S. C.(2013).Stackelberg solution in a vendor-buyer supply chain model with permissible delay in payments.International Journal of Production Economics,144,397-404.
-
Dey, O.,Chakraborty, D.(2012).A fuzzy random periodic review system with variable lead-time and negative exponential crashing cost.Applied Mathematical Modelling,36,6312-6322.
-
Gallego, G.,Moon, I.(1993).The distribution of free news boy problem: review and extension.Journal of the Operational Research Society,44,825-834.
-
Gholami-Qadikolaei, A.,Sobhanallahi, M. A.,Mirzazadeh, A.(2013).Lead time reduction in budget and storage space restricted lot size reorder point inventory models with controllable negative exponential backorder rate.Research Journal of Applied Sciences, Engineering and Technology,5,1557-1567.
-
Glock, H. C.(2010).Lead time reduction strategies in a single-vendor single-buyer integrated inventory model with lot size dependent lead time and stochastic demand.International Journal of Production Economics,136,37-44.
-
Goyal, S. K.(1988).A joint economic-lot-size model for purchaser and vendor: A comment.Decision Sciences,19,236-241.
-
Goyal, S. K.(1976).An integrated inventory model for a single supplier single customer problem.International Journal of Production Research,15,107-111.
-
Goyal, S. K.,Nebebe, F.(2000).Determination of economic production-shipment policy for a single-vendor single-buyer system.European Journal of Operations Research,121,175-178.
-
Hadley, G.,Whitin, T.(1963).Analysis of inventory systems.Englewood Cliffs, New Jersey:Prentice Hall.
-
Hariga, M. A.,Ben-Daya, M.(1999).Some stochastic inventory models with deterministic variable lead time.European Journal of Operational Research,113,42-51.
-
Ho, C. H.(2009).A minimax distribution free procedure for an integrated inventory model with defective goods and stochastic lead time demand.International Journal of Information and Management Sciences,20,161-171.
-
Hofmann, C.(1998).Investments in modern production technology and the cash flow-oriented EPQ-model.International Journal of Production Economics,54,193-206.
-
Hong, J. D.,Hayya, J. C.(1995).Joint investment in quality improvement and setup reduction.Computers and Operations Research,22,567-574.
-
Hoque, M. A.,Goyal, S. K.(2006).A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal size batch shipments between a vendor and a buyer.International Journal of Production Economics,102,217-225.
-
Hwang, H.,Kim, D. B.,Kim, Y. D.(1993).Multiproduct economic lot size models with investments costs for setup reduction and quality improvement.International Journal of Production Research,31,691-703.
-
Jaggi, C. K.,Arneja, N.(2011).Stochastic integrated vendor-buyer model with unstable lead time and setup cost.International Journal of Industrial Engineering Computations,2,123-140.
-
Jaggi, C. K.,Arneja, N.,Ali, H.(2011).Stochastic integrated vendor-buyer model with negative exponential crashing cost.MR International Journal of Engineering and Technology,3,35-41.
-
Keller, G.,Noori, H.(1988).Impact of investing in quality improvement on the lot size model.Omega,15,595-601.
-
Lau, A. H.,Lau, H. S.(2003).Effects of a demand-curve's shape on the optimal solutions of a multi-echelon inventory/pricing model.European Journal of Operational Research,147,530-548.
-
Lee, W. C.(2005).Inventory model involving controllable backorder rate and variable lead time demand with the mixtures of distribution.Applied Mathematics and Computation,160,701-717.
-
Lee, W. C.,Wu, J. W.,Hou, W.B.(2004).A note on inventory model involving variable lead time with defective units for mixtures of distribution.International Journal of Production Economics,89,31-44.
-
Lee, W. C.,Wu, J. W.,Hsu, J. W.(2006).Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate.Applied Mathematics and Computation,175,1125-1138.
-
Liao, C. J.,Shyu, C. H.(1991).Analytical determination of lead time with normal demand.International Journal of Operations & Production Management,11,72-78.
-
Lin, Y. J.(2008).Minimax distribution free procedure with backorder price discount.International Journal of Production Economics,111,118-128.
-
Moon, I.(1994).Multiproduct economic lot size models with investments costs for setup reduction and quality improvement: Review and extensions.International Journal of Production Research,32,2795-2801.
-
Moon, I.,Choi, S.(1998).A note on lead time and distributional assumptions in continuous review inventory models.Computers and Operations Research,25,1007-1012.
-
Nasri, F.,Affisco, J. F.,Paknejad, M. T.(1990).Setup cost reduction in an inventory model with finite range stochastic lead times.International Journal of Production Research,28,199-212.
-
Ouyang, L. Y.,Chang, H. C.(1999).Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process.Production Planning Control,11,598-607.
-
Ouyang, L. Y.,Chen, C. K.,Chang, H. C.(2002).Quality improvement, setup cost and lead-time reductions in lot sizes reorder point models with an imperfect production process.Computers & Operations Research,29,1701-1717.
-
Ouyang, L. Y.,Chuang, B. R.(2001).Mixture inventory model involving variable lead time and controllable backorder rate.Computers and Industrial Engineering,40,339-348.
-
Ouyang, L. Y.,Chuang, B. R.,Wu, K. S.(1994).Optimal inventory policies involving variable lead time with defective items.Journal of the Operational Research Society of India,36,374-389.
-
Ouyang, L. Y.,Wu, K. S.,Ho, C. H.(2007).An integrated vendor-buyer inventory model with quality improvement and lead time reduction.International Journal of Production Economics,108,349-358.
-
Ouyang, L. Y.,Wu, K. S.,Ho, C. H.(2004).Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time.International Journal of Production Economics,92,255-266.
-
Ouyang, L. Y.,Yen, N. C.,Wu, K. S.(1996).Mixture inventory model with backorders and lost sales of variable lead time.International Journal of Production Economics,47,829-832.
-
Ouyang, L.,Wu, K.(1998).A minimax distribution free procedure for mixed inventory model with variable lead time.International Journal of Production Economics,56-57,511-516.
-
Paknejad, M. J.,Affisco, J. F.(1987).The effect of investment in new technology on optimal batch quantity.Proceedings of the Northeast Decision Sciences Institute,RI, USA:
-
Pan, C. H.,Hsiao, Y. C.(2001).Inventory models with backorder discounts and variable lead time.International Journal of System Science,32,925-929.
-
Pan, J. C. H.,Lo, M. C.,Hsiao, Y. C.(2004).Optimal reorder point inventory models with variable lead time and backorder discount considerations.European Journal of Operational Research,158,488-505.
-
Pan, J. C. H.,Yang, J. S.(2004).Just-in-time: an integrated inventory model involving deterministic variable lead time and quality improvement investment.International Journal of Production Research,42,853-863.
-
Pan, J. C. H.,Yang, J. S. A.(2002).Study of an integrated inventory with controllable lead time.International Journal of Production Research,40,1263-1273.
-
Park, C.(2005).An analysis of the lead time demand distribution in stochastic inventory system.International Journal of Production Economics,11,263-272.
-
Porteus, E. L.(1986).Optimal lot sizing process quality improvement and setup cost reduction.Operations Research,34,137-144.
-
Rosenblatt, M. J.,Lee, H. L.(1986).Economic production cycles with imperfect production processes.IIE Transactions,18,48-55.
-
Sarker, B. R.,Coates, E. R.(1997).Manufacturing setup cost reduction under variable lead times and finite opportunities for investment.International Journal of Production Economics,49,237-247.
-
Silver, E. A.,Peterson, R.(1985).Decision Systems for Inventory Management and Production Planning.New York:John Wiley.
-
Teng, J. T.,Crdenas, B. L. E.,Lou, K. R.(2011).The economic lot-size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation.Applied Mathematics and Computation,217,5972-5977.
-
Tersine, R.(1994).Principle of Inventory and Material Management.USA:Prentice-Hall.
-
Tsou, C. S.,Fang, H. H.,Lo, H. C.,Huang, C. H.(2009).A study of cooperative advertising in a manufacturer-retailer supply chain.International Journal of Information and Management Sciences,20,15-26.
-
Villa, A.(2001).Introducing some supply chain management problems.International Journal of Production Economics,73,1-4.
-
Viswanathan, S.(1998).Optimal strategy for the integrated vendor-buyer inventory model.European Journal of Operational Research,105,38-42.
-
Wu, J. W.,Lee, W. C.,Tsai, H. Y.(2007).Computational algorithmic procedure of optimal inventory policy involving a negative exponential crashing cost and variable lead time demand.Applied Mathematics and Computation,184,798-808.
-
Wu, J. W.,Tasi, H. Y.(2001).Mixture inventory model with back orders and lost sales for variable lead time demand with the mixtures of normal distribution.International Journal of System Science,32,259-268.
-
Wu, K. S.(2001).Continuous review inventory model with permissible delay in payment.International Journal of Information and Management Sciences,12,57-66.
-
Yang, G.,Ronald, R. T.,Chu, P.(2005).Inventory models with variable lead time and present value.European Journal of Operational Research,164,358-366.
-
Yang, M. F.,Lo, M. C.,Lu, T. P.(2013).A vendor-buyers integrated inventory model involving quality improvement investment in a supply chain.Journal of Marine Science and Technology,21,586-593.
-
Yang, P. C.,Wee, H. M.(2001).An arborescent inventory model in a supply chain system.Production Planning & Control,12,728-735.
|