题名

Pricing Strategy for Product Reuse with Multiple Quality Levels and Price- and Availability-Dependent Demand

DOI

10.6186/IJIMS.2014.25.1.4

作者

Jonas C. P. Yu;Jen-Ming Chen;Chia-Hung Wu

关键词

Product reuse ; optimal pricing model ; price and availability sensitive demand ; reversed logistics

期刊名称

International Journal of Information and Management Sciences

卷期/出版年月

25卷1期(2014 / 03 / 01)

页次

51 - 66

内容语文

英文

英文摘要

The study deals with optimal pricing model for recycling products, which are returned, recovered, and shipped into a secondary market for resale. The selling probability of recycling products is sensitive to their price and availability. This assumption is rational because price and availability often influence customer demand. The study also assumes that the three quality levels of collected returns exist, which affect the price they are sold for. This paper determines optimal selling prices for re-manufacturers. The exact closed-form solution is then derived and total profit is maximized to create the remanufacturing model. A numerical example and sensitivity analysis are conducted to demonstrate the model. The study provides managerial insights on the benefits of revenue management for product reuse. For example, if manager can develop an incentive return-subsidy policy to encourage consumer to offer better or more returns, the profits will increase more.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 管理學
参考文献
  1. Chen, L. T.,Chen, J. M.,Wang, B.(2011).Pricing and order-up-to decisions for a perishable item with price and stock-dependent demand under lifo policy.International Journal of Information and Management Science,22,377-393.
    連結:
  2. Huang, M. G.(2012).Economic ordering model for a single-period perishable commodity with volatile demand given a multi-tier return rebate policy.International Journal of Information and Management Science,23,129-147.
    連結:
  3. Vijayashree, M.,Uthayakumar, R.(2013).Vendor-buyer integrated inventory model with quality improvement and negative exponential lead time crashing cost.International Journal of Information and Management Science,24,307-327.
    連結:
  4. Anbuudayasankar, S.,Ganesh, K.,Lenny, S.,Mohandas, K.(2010).Unified heuristics to solve routing problem of reverse logistics in sustainable supply chain.International Journal of Systems Science,41,337-351.
  5. Aras, N.,Aksen, D.(2008).Locating collection centers for distance and incentive dependent returns.International Journal of Production Economics,111,316-333.
  6. Chen, C. H.,Lu, C. L.(2011).Optimum profit model considering production, quality and sale problem.International Journal of Systems Science,42,19171933.
  7. Dekker, R.,Fleischmann, M.,Inderfurth, K.,Van Wassenhove, L. N.(2004).Reverse logistics: Quantitative models for closed loop supply chains.Berlin:Springer.
  8. Dyckhoff, H.,Lackes, R.,Reese, J.(2003).Supply chain management and reverse logistics.Berlin:Springer.
  9. El Saadany, A. M. A.,Jaber, M. Y.(2010).A production/remanufacturing inventory model with price and quality dependant return rate.Computers & Industrial Engineering,58,352-362.
  10. Georgiadis, P.,Athanasiou, E.(2013).Flexible long-term capacity planning in closed-loop supply chain with remanufacturing.European Journal of Operational Research,225,44-58.
  11. Hsieh, T. P.,Cheng, M. C.,Dye, C. Y.,Ouyang, L. Y.(2011).Determining optimal selling price and lot size with process reliability and partial backlogging considerations.International Journal of Systems Science,42,110.
  12. Kaya, O.(2010).Incentive and production decisions for remanufacturing operations.European Journal of Operational Research,201,442-453.
  13. Kim, J.,Hong, Y.,Kim, T.(2011).Pricing and ordering policies for price-dependent demand in a supply chain of a single retailer and a single manufacturer.International Journal of Systems Science,42,8189.
  14. Koh, S. G.,Hwang, H.,Sohn, K. I.,Ko, C. S.(2002).An optimal ordering and recovery policy for reusable items.Computers and Industrial Engineering,43,59-73.
  15. Lund, R. T.(1984).Remanufacturing.Technology review,87,19-27.
  16. Mabini, M. C.,Pintelon, L. M.,Gelders, L. F.(1992).EOQ type formulation for controlling repairable inventories.International Journal of Production Economics,28,21-33.
  17. Min, J.,Zhou, Y. W.,Liu, G. Q.,Wang, S. D.(2012).An EPQ model for deteriorating items with inventory-level-dependent demand and permissible delay in payments.International Journal of Systems Science,43,1039-1053.
  18. Mitra, S.(2007).Revenue management for remanufactured products.Omega,35,553-562.
  19. Mukherjee, K.,Sarkar, B.,Bhattacharya, A.(2011).Comments on the erratum to "Supply planning model for remanufacturing system in reverse logistics environment", Comput. Ind. Eng. 51(2006) 279-287].Computers & Industrial Engineering,61,1349-1350.
  20. Nahmias, S.,Rivera, H.(1979).A deterministic model for a repairable item inventory system with a finite repair rate.International Journal of Production Research,17,215-221.
  21. Sarkar, B.(2012).An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production.Applied Mathematics and Computation,218,8295-8308.
  22. Savaskan, R. C.,Bhattacharya, S.,van Wassenhove, L. N.(2004).Closed-loop supply chain models with product remanufacturing.Management Science,50,222-238.
  23. Schrady, D. A.(1967).A deterministic inventory model for repairable items.Naval Research Logistics Quarterly,14,391-398.
  24. Shi, J.,Zhang, G.,Sha, J.(2011).Optimal production and pricing policy for a closed loop system.Resource Conservation and Recycling,55,639-647.
  25. Srivastava, S. K.(2007).Green supply chain management: a state-of-the-art literature review.International Journal of Management Reviews,9,53-80.
  26. Wang, J.,Zhao, J.,Wang, X.(2011).Optimum policy in hybrid manufacturing/remanufacturing system.Computers & Industrial Engineering,60,411419.
  27. Zanoni, S.,Segerstedt, A.,Tang, O.,Mazzoldi, L.(2012).Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy.Computers & Industrial Engineering,62,1025-1033.