参考文献
|
-
Harris, F. W. (1913). How many parts to make at once, Factory, The Magazine of Management, Vol.10, 135-136, 152
-
Chan, W. M.,Ibrahim, R. N.,Lochert, P. B.(2003).A new EPQ model: integrating lower pricing, rework and reject situations.Production Planning and Control,14,588-595.
-
Chang, H. C.(2013).An economic production quantity model with consolidating shipments of imperfect quality items: A note.International Journal of Production Economics,144,507-509.
-
Chiu, S. W.(2007).Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging.Applied Stochastic Models in Business and Industry,23,165-178.
-
Chiu, Y. P.(2003).Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging.Engineering Optimization,35,427437.
-
El Saadany, A. M. A.,Jaber, M. Y.(2010).A production/remanufacturing inventory model with price and quality dependent return rate.Computers & Industrial Engineering,58,352-362.
-
Glock, C. H.,Jaber, M. Y.(2013).A multi-stage production-inventory model with learning and forgetting effects, rework and scrap.Computers & Industrial Engineering,64,708-720.
-
Groenevelt, H.,Pintelon, L.,Seidmann, A.(1992).Production lot sizing with machine breakdowns.Management Science,38,104-123.
-
Hong, J. D.,Hayya, J. C.(1995).Joint investment in quality improvement and setup reduction.Computers & Operations Research,22,567-574.
-
Hsu, J. T.,Hsu, L. F.(2013).An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns.International Journal of Production Economics,143,162-170.
-
Jaber, M. Y.,Bonney, M.,Moualek, I.(2009).An economic order quantity model for an imperfect production process with entropy cost.International Journal of Production Economics,118,26-33.
-
Keller, G.,Noori, H.(1988).Impact of investing in quality improvement on the lot size model.Omega International Journal of Management Sciences,16,595-601.
-
Khan, M.,Jaber, M. Y.,Bonney, M.(2011).An economic order quantity (EOQ) for items with imperfect quality and inspection errors.International Journal of Production Economics,133,113-118.
-
Kim, C. H.,Hong, Y.(1999).An optimal production run length in deteriorating production processes.International Journal of Production Economics,58,183-189.
-
Kulkarni, S. S.(2008).Loss-based quality costs and inventory planning: General models and insights.European Journal of Operational Research,188,428-449.
-
Lee, H. L.,Rosenblatt, M. J.(1987).Simultaneous determination of production cycle and inspection schedules in a production system.Management Science,33,1125-1136.
-
Lee, H. L.,Rosenblatt, M. J.(1989).A production and maintenance planning model with restoration cost dependent on detection delay.IIE Transactions,21,368-375.
-
Ouyang, L. Y.,Chang, C. T.(2013).Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging.International Journal of Production Economics,144,610-617.
-
Ouyang, L. Y.,Wu, K. S.,Ho, C. H.(2007).An integrated vendor-buyer inventory model with quality improvement and lead time reduction.International Journal of Production Economics,108,349-358.
-
Papachristos, S.,Konstantaras, I.(2006).Economic ordering quantity models for items with imperfect quality.International Journal of Production Economics,100,148-154.
-
Porteus, E. L.(1986).Optimal lot sizing, process quality improvement and setup cost reduction.Operations Research,34,137-144.
-
Raouf, A.,Jain, J. K.,Sathe, P. T.(1983).A cost-minimization model for multicharacteristic component inspection.IIE Transactions,15,187-194.
-
Rezaei, J.,Salimi, N.(2012).Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier.International Journal of Production Economics,137,11-18.
-
Roy, A.,Maity, K.,Kar, S.,Maiti, M.(2009).A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment.Computers & Industrial Engineering,56,87-96.
-
Salameh, M. K.,Jaber, M. Y.(2000).Economic production quantity model for items with imperfect quality.International Journal of Production Economics,64,59-64.
-
Sana, S. S.(2010).A production-inventory model in an imperfect production process.European Journal of Operational Research,200,451-464.
-
Sarker, B. R.,Jamal, A. M. M.,Mondal, S.(2008).Optimal batch sizing in a multi-stage production system with rework consideration.European Journal of Operational Research,184,915-929.
-
Sheu, S. H.,Chen, Y. C.,Wang, W. Y.,Shin, N. H.(2003).Economic optimization of off-line inspection with inspection errors.Journal of the Operational Research Society,54,888-895.
-
Su, C. H.(2012).Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit.International Journal of Production Economics,139,247-256.
-
Wang, C. H.(2007).Economic off-line quality control strategy with two types of inspection errors.European Journal of Operational Research,179,132-147.
-
Wang, C. H.,Dohi, T.,Tsai, W.C.(2010).Coordinated procurement/inspection and production model under inspection errors.Computers & Industrial Engineering,59,473-478.
-
Waters, C. D. J.(1994).Inventory Control and Management.Chichester:Wiley.
-
Wu, C. C.,Chou, C. Y.,Huang, C.(2009).Optimal price, warranty length and production rate for free replacement policy in the static demand market.Omega International Journal of Management Sciences,37,29-39.
-
Yassine, A.,Maddah, B.,Salameh, M.(2012).Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model.International Journal of Production Economics,135,345-352.
-
Yoo, S. H.,Kim, D. S.,Park, M. S.(2009).Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return.International Journal of Production Economics,121,255-265.
-
Yoo, S. H.,Kim, D. S.,Park, M. S.(2012).Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return.International Journal of Production Economics,140,922-933.
-
Zhang, X.,Gerchak, Y.(1990).Joint lot sizing and inspection policy in an EOQ model with random yield.IIE Transactions,22,41-47.
|