题名

Optimal Ordering Policy for an Economic Order Quantity Model with Inspection Errors and Inspection Improvement Investment

并列篇名

考慮檢查程序發生錯誤且得以投資資金改善檢查程序的經濟訂購量模型之最適訂購策略

DOI

10.6186/IJIMS.2014.25.4.3

作者

歐陽良裕(Liang-Yuh Ouyang);蘇家嫻(Chia-Hsien Su);和家慧(Chia-Huei Ho);楊志德(Chih-Te Yang)

关键词

存貨 ; 不良品 ; 檢查錯誤 ; 檢定力 ; 投資資金 ; Inventory ; defective products ; inspection error ; power of the test ; capital investment

期刊名称

International Journal of Information and Management Sciences

卷期/出版年月

25卷4期(2014 / 12 / 01)

页次

317 - 330

内容语文

英文

中文摘要

消費者保護自身權益意識的擡頭,使得越來越多的企業注重其產品品質。若企業無法在出售產品前檢查出不良品,會造成成本提高、銷售收入減少、聲譽受損,進而降低競爭力。本研究考慮零售商收到的商品中含有不良品的經濟訂購量(EOQ)模型,雖然零售商進行商品品質檢查,但是檢查程序不完善。我們假設檢查結果會發生型I和型II檢查錯誤,且市場需求率與型II檢查錯誤有關。為改善檢查程序的品質,零售商會投資資金以降低型II檢查錯誤的發生。本研究擬決定最適的訂購量和檢定力,使得單位時間總利潤有最大值。對所建立的存貨模型,數學分析方法將用來證明最適解存在;接著,發展一演算法以幫助求解。最後,以數值範例說明求解過程,並對重要的參數進行敏感性分析。

英文摘要

The rise of consumer rights has caused businesses to focus increasingly on product quality. The inability of businesses to identify defective items before selling them results in higher return costs, decreased sales revenue, damaged reputations, and decreased competitiveness. This study examines the economic order quantity (EOQ) model in which the retailer discovers defective goods among received products. Although retailers conduct quality inspections, the inspection process is imperfect. We assume that Type I and Type II inspection errors occur during product quality inspection and that the market demand rate is sensitive to Type II inspection errors. To improve inspection, the retailer invests capital to decrease Type II inspection errors. This study investigates the optimal order quantity and the power of the test to maximize total profit per unit time. Mathematical analysis is used to show the optimal solution exists. An algorithm is then developed to calculate the optimal solution. Finally, numerical examples demonstrate the solution process and sensitivity analysis with respect to major parameters is carried out.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 管理學
参考文献
  1. Harris, F. W. (1913). How many parts to make at once, Factory, The Magazine of Management, Vol.10, 135-136, 152
  2. Chan, W. M.,Ibrahim, R. N.,Lochert, P. B.(2003).A new EPQ model: integrating lower pricing, rework and reject situations.Production Planning and Control,14,588-595.
  3. Chang, H. C.(2013).An economic production quantity model with consolidating shipments of imperfect quality items: A note.International Journal of Production Economics,144,507-509.
  4. Chiu, S. W.(2007).Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging.Applied Stochastic Models in Business and Industry,23,165-178.
  5. Chiu, Y. P.(2003).Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging.Engineering Optimization,35,427437.
  6. El Saadany, A. M. A.,Jaber, M. Y.(2010).A production/remanufacturing inventory model with price and quality dependent return rate.Computers & Industrial Engineering,58,352-362.
  7. Glock, C. H.,Jaber, M. Y.(2013).A multi-stage production-inventory model with learning and forgetting effects, rework and scrap.Computers & Industrial Engineering,64,708-720.
  8. Groenevelt, H.,Pintelon, L.,Seidmann, A.(1992).Production lot sizing with machine breakdowns.Management Science,38,104-123.
  9. Hong, J. D.,Hayya, J. C.(1995).Joint investment in quality improvement and setup reduction.Computers & Operations Research,22,567-574.
  10. Hsu, J. T.,Hsu, L. F.(2013).An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns.International Journal of Production Economics,143,162-170.
  11. Jaber, M. Y.,Bonney, M.,Moualek, I.(2009).An economic order quantity model for an imperfect production process with entropy cost.International Journal of Production Economics,118,26-33.
  12. Keller, G.,Noori, H.(1988).Impact of investing in quality improvement on the lot size model.Omega International Journal of Management Sciences,16,595-601.
  13. Khan, M.,Jaber, M. Y.,Bonney, M.(2011).An economic order quantity (EOQ) for items with imperfect quality and inspection errors.International Journal of Production Economics,133,113-118.
  14. Kim, C. H.,Hong, Y.(1999).An optimal production run length in deteriorating production processes.International Journal of Production Economics,58,183-189.
  15. Kulkarni, S. S.(2008).Loss-based quality costs and inventory planning: General models and insights.European Journal of Operational Research,188,428-449.
  16. Lee, H. L.,Rosenblatt, M. J.(1987).Simultaneous determination of production cycle and inspection schedules in a production system.Management Science,33,1125-1136.
  17. Lee, H. L.,Rosenblatt, M. J.(1989).A production and maintenance planning model with restoration cost dependent on detection delay.IIE Transactions,21,368-375.
  18. Ouyang, L. Y.,Chang, C. T.(2013).Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging.International Journal of Production Economics,144,610-617.
  19. Ouyang, L. Y.,Wu, K. S.,Ho, C. H.(2007).An integrated vendor-buyer inventory model with quality improvement and lead time reduction.International Journal of Production Economics,108,349-358.
  20. Papachristos, S.,Konstantaras, I.(2006).Economic ordering quantity models for items with imperfect quality.International Journal of Production Economics,100,148-154.
  21. Porteus, E. L.(1986).Optimal lot sizing, process quality improvement and setup cost reduction.Operations Research,34,137-144.
  22. Raouf, A.,Jain, J. K.,Sathe, P. T.(1983).A cost-minimization model for multicharacteristic component inspection.IIE Transactions,15,187-194.
  23. Rezaei, J.,Salimi, N.(2012).Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier.International Journal of Production Economics,137,11-18.
  24. Roy, A.,Maity, K.,Kar, S.,Maiti, M.(2009).A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment.Computers & Industrial Engineering,56,87-96.
  25. Salameh, M. K.,Jaber, M. Y.(2000).Economic production quantity model for items with imperfect quality.International Journal of Production Economics,64,59-64.
  26. Sana, S. S.(2010).A production-inventory model in an imperfect production process.European Journal of Operational Research,200,451-464.
  27. Sarker, B. R.,Jamal, A. M. M.,Mondal, S.(2008).Optimal batch sizing in a multi-stage production system with rework consideration.European Journal of Operational Research,184,915-929.
  28. Sheu, S. H.,Chen, Y. C.,Wang, W. Y.,Shin, N. H.(2003).Economic optimization of off-line inspection with inspection errors.Journal of the Operational Research Society,54,888-895.
  29. Su, C. H.(2012).Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit.International Journal of Production Economics,139,247-256.
  30. Wang, C. H.(2007).Economic off-line quality control strategy with two types of inspection errors.European Journal of Operational Research,179,132-147.
  31. Wang, C. H.,Dohi, T.,Tsai, W.C.(2010).Coordinated procurement/inspection and production model under inspection errors.Computers & Industrial Engineering,59,473-478.
  32. Waters, C. D. J.(1994).Inventory Control and Management.Chichester:Wiley.
  33. Wu, C. C.,Chou, C. Y.,Huang, C.(2009).Optimal price, warranty length and production rate for free replacement policy in the static demand market.Omega International Journal of Management Sciences,37,29-39.
  34. Yassine, A.,Maddah, B.,Salameh, M.(2012).Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model.International Journal of Production Economics,135,345-352.
  35. Yoo, S. H.,Kim, D. S.,Park, M. S.(2009).Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return.International Journal of Production Economics,121,255-265.
  36. Yoo, S. H.,Kim, D. S.,Park, M. S.(2012).Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return.International Journal of Production Economics,140,922-933.
  37. Zhang, X.,Gerchak, Y.(1990).Joint lot sizing and inspection policy in an EOQ model with random yield.IIE Transactions,22,41-47.
被引用次数
  1. 蔡登茂、林芷如(2015)。具回收料價格考慮之逆物流最適買賣整合生產存貨模式。臺灣企業績效學刊,8(2),159-180。