题名

Standby System with Imperfect Coverage and Repairable Service Station

DOI

10.6186/IJIMS.2016.27.3.6

作者

Ying-Lin Hsu;Ying-Cheng Tseng;Chia-Jung Chang;Fu-Min Chang

关键词

Imperfect coverage ; service station breaks down ; reliability ; MTTF ; sensitivity analysis

期刊名称

International Journal of Information and Management Sciences

卷期/出版年月

27卷3期(2016 / 09 / 01)

页次

299 - 316

内容语文

英文

英文摘要

This paper analyzes the reliability characteristics of a system with imperfect coverage in which a repairable service station is considered. Failure times of primary and standby units are assumed to follow exponential distributions. With a coverage probability c, a failed unit is immediately detected and replaced by a standby if one is available. If the failed unit is not detected, the system enters an unsafe failure state and has to be refreshed by a reboot action. When the service station breaks down, it needs repair at a repair device. We present the expression for reliability function R_Y (t) and mean time to system failure MT TF. Several cases are analyzed to study the effects of various parameters on the system reliability R_Y (t) and MT TF. We also perform the sensitivity analysis of R_Y (t) and MT TF with respect to system parameters. Finally, we present an application example to demonstrate the applicability of investigated model.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 管理學
参考文献
  1. Amari, S. V.,Dugan, J. B.,Misre, R. B.(1999).A separable method for incorporating imperfect fault-coverage into combinatorial models.IEEE Transactions on Reliability,48,267-274.
  2. Arnold, T. F.(1973).The concept of coverage and its effect on the reliability model of a repairable system.IEEE Transactions on Computers,C-22,251-254.
  3. Jain, M.,Agrawal, S. C.,Preeti, C.(2012).Fuzzy reliability evaluation of a repairable system with imperfect coverage, reboot and common-cause shock failure.International Journal of Engineering,25,231-238.
  4. Ke, J. B.,Chen, J. W.,Wang, K. H.(2011).Reliability measures of a repairable system with standby switching failures and reboot delay.Quality Technology and Quantitative Management,8,15-26.
  5. Ke, J. B.,Lee, W. C.,Ke, J. C.(2008).Reliability-based measure for a system with standbys subjected to switching failures.International Journal for Computer-Aided Engineering and Software,25,694-706.
  6. Ke, J. C.,Hsu, Y. L.,Liu, T. H.,Zhang, Z. G.(2013).Computational analysis of machine repair problem with unreliable multi-repairmen.Computers and Operations research,40,848-855.
  7. Ke, J. C.,Huang, H. I.,Lin, C. H.(2008).Parametric programming approach for a two-unit repairable system with imperfect coverage, reboot and fuzzy parameters.IEEE Transactions on Reliability,57,498-506.
  8. Ke, J. C.,Lee, S. L.,Ko, M. Y.(2011).Two-Unit redundant system with detection delay and imperfect coverage: confidence interval estimation.Quality Technology and Quantitative Management,8,1-14.
  9. Ke, J. C.,Wang, K. H.(2002).The reliability analysis of balking and reneging in a repairable system with warm standbys.Quality and Reliability Engineering International,18,467-478.
  10. Krishnamoorthy, A.,Pramod, P. K.,Chakravarthy, S. R.(2014).Queues with interruptions: a survey.TOP-Spanish Journal of Statistics & Operations Research,22,290-320.
  11. Trivedi, K. S.(2002).Probability and Statistics with Reliability Queueing and Computer Science Applications.New York:John Wiley and Sons.
  12. Wang, K. H.,Chiu, L. W.(2006).Cost benefit analysis of availability systems with warm standby units and imperfect coverage.Applied Mathematics and Computation,172,1239-1256.
  13. Wang, K. H.,Lai, Y. J.,Ke, J. B.(2004).Reliability and sensitivity analysis of a system with warm standbys and a repairable service station.International Journal of Operations Research,1,61-70.
  14. Wang, K. H.,Pearn, W. L.(2003).Cost benefit analysis of series systems with warm standby components.Mathematical Methods of Operations Research,58,247-258.
  15. Wang, K. H.,Sivazlian, B. D.(1989).Reliability of a system with warm standbys and repairmen.Microelectronics and Reliability,29,849-860.
  16. Wang, K. H.,Yen, T. C.,Fang, Y. C.(2012).Comparison of availability between two systems with warm standby units and different imperfect coverage.Quality Technology and Quantitative Management,9,265-282.
  17. Wang, K. H.,Yen, T. C.,Jian, J. J.(2013).Reliability and sensitivity analysis of a repairable system with imperfect coverage under service pressure condition.Journal of Manufacturing Systems,32,357-363.