题名

An Integrated Vendor-Buyer Inventory Model with Defective Items and Trade Credit under Holding Cost Reduction

DOI

10.6186/IJIMS.201806_29(2).0001

作者

Tsu-Pang Hsieh;Ming-Wei Weng;Rung-Hung Su;Kuei-Kuei Lai

关键词

Supply chain coordination ; holding cost reduction ; defective items ; delay in payment ; precision machine industry

期刊名称

International Journal of Information and Management Sciences

卷期/出版年月

29卷2期(2018 / 06 / 01)

页次

145 - 169

内容语文

英文

中文摘要

This paper develops an integrated vendor-buyer inventory model by a case study in the precision machine industry from Taiwan. The vendor offers the buyer a permissible delay period, and the buyer receives an arriving lot containing some defective items. In addition, it is assumed that holding cost is a function of capital expenditure. The dispensable assumption that the screening time is less than the permissible delay period is relaxed. The objective is to minimize the joint total expected cost per unit time and to study the effects of trade credit and an added capital expenditure on inventory decisions. A solution procedure is established to find the optimal solutions for the supply chain. Further, we use a couple of numerical examples to illustrate the proposed model and conclude the paper with suggestions for possible future researches.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 管理學
参考文献
  1. Alfares, H. K.(2007).Inventory model with stock-level dependent demand rate and variable holding cost.International Journal of Production Economics,108,259-265.
  2. Badami, V. G.,Smith, S. T.,Raja, J.,Hocken R. J.(1996).A portable three-dimensional stylus profile measuring instrument.Precision Engineering,18,147-156.
  3. Billington, P. J.(2003).Holding cost reduction in the EOQ model.Journal of American Academy of Business, Cambridge,3,409-415.
  4. Chen, L. H,Kang, F. S.(2010).Coordination between vendor and buyer considering trade credit and items of imperfect quality.International Journal of Production Economics,123,52-61.
  5. Chung, K. J.,Huang, Y. F.(2006).Retailer's optimal cycle times in the EOQ model with imperfect quality and a permissible credit period.Quality and Quantity,40,59-77.
  6. Eroglu, A.,Ozdemir, G.(2007).An economic order quantity model with defective items and shortages.International Journal of Production Economics,106,544-549.
  7. Fujiwara, O.,Perera, U.(1993).EOQ models for continuously deteriorating products using linear and exponential penalty costs.European Journal of Operational Research,70,104-114.
  8. Hsu, J. T.,Hsu, L. F.(2013).An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns.International Journal of Production Economics,143,162-170.
  9. Jaber, M. Y.,Goyal, S. K.(2008).Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers.International Journal of Production Economics,116,95-103.
  10. Jaber, M. Y.,Goyal, S. K.(2009).A basic model for co-ordinating a four-level supply chain of a product with a vendor, multiple buyers and tier-1 and tier-2 suppliers.International Journal of Production Research,47,3691-3704.
  11. Jaber, M. Y.,Osman, I. H.(2006).Coordinating a two-level supply chain with delay in payments and profit sharing.Computers & Industrial Engineering,50,385-400.
  12. Jaggi, C. K.,Goel, S. K.,Mittal, M.(2013).Credit financing in economic ordering policies for defective items with allowable shortages.Applied Mathematics and Computation,219,5268-5282.
  13. Khan, M.,Jaber, M. Y.(2011).Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers.International Journal of Operational Research,10,442-457.
  14. Khan, M.,Jaber, M. Y.,Guiffrida, A. L.,Zolfaghari, S.(2011).A review of the extensions of a modified EOQ model for imperfect quality items.International Journal of Production Economics,132,1-12.
  15. Lin T. Y.(2010).An economic order quantity with imperfect quality and quantity discounts.Applied Mathematical Modelling,34,3158-3165.
  16. Lin, Y. J,Ouyang, L. Y.,Dang, Y. F.(2012).A joint optimal ordering and delivery policy for an integrated supplier-retailer inventory model with trade credit and defective items.Applied Mathematics and Computation,218,7498-7514.
  17. Maddah, B.,Jaber, M. Y.(2008).Economic order quantity for items with imperfect quality: Revisited.International Journal of Production Economics,112,808-815.
  18. Ouyang, L. Y.,Chang, C. T.(2013).Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging.International Journal of Production Economics,144,610-617.
  19. Pando, V.,García-Laguna, J.,San-José, L. A.,Sicilia, J.(2012).Maximizing profits in an inventory model with both demand rate and holding cost per unit time dependent on the stock level.Computers & Industrial Engineering,62,599-608.
  20. Papachristos, S.,Konstantaras, I.(2006).Economic ordering quantity models for items with imperfect quality.International Journal of Production Economics,100,148-154.
  21. Porteus, E. L.(1986).Optimal lot sizing, process quality improvement and setup cost reduction.Operations Research,34,137-144.
  22. Rezaei, J.,Davoodi, M. A.(2008).Deterministic, multi-item inventory model with supplier selection and imperfect quality.Applied Mathematical Modelling,32,2106-2116.
  23. Rosenblatt, M. J.,Lee, H. L.(1986).Economic production cycles with imperfect production processes.IIE Transactions,18,48-55.
  24. Roy, M. D.,Sana, S. S.,Chaudhuri, K.(2011).An economic order quantity model of imperfect quality items with partial backlogging.International Journal of Systems Science,42,1409-1419.
  25. Salameh, M. K.,Jaber, M. Y.(2000).Economic production quantity model for items with im- perfect quality.International Journal of Production Economics,64,59-64.
  26. Shah, N. H,Soni H. N.,Patel, K. A.(2013).Optimizing inventory and marketing policy for non- instantaneous deteriorating items with generalized type deterioration and holding cost rates.Omega,41,421-430.
  27. Su, C. H.(2012).Optimal replenishment policy for an integrated inventory system with defective items and allowable shortage under trade credit.International Journal of Production Economics,139,247-256.
  28. Teng, J. T.,Crdenas-Barrn, L. E.,Lou, K. R.(2011).The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: A simple derivation.Applied Mathemat- ics and Computation,217,5972-5977.
  29. Teng, J. T.,Yang, H. L.(2007).Deterministic inventory lot-size models with time-varying demand and cost under generalized holding costs.International Journal of Information and Management Sciences,18,113-125.
  30. Wahab, M. I. M.,Jaber, M. Y.(2010).Economic order quantity model for items with imperfect quality, different holding costs, and learning effects: A note.Computers and Industrial Engineering,58,186-190.
  31. Wee, H. M.,Yu, J.,Chen, M. C.(2007).Optimal inventory model for items with imperfect quality and shortage backordering.Omega,35,7-11.
  32. Yassine, A.,Maddah, B.,Salameh, M.(2012).Disaggregation and consolidation of imperfect qual- ity shipments in an extended EPQ model.International Journal of Production Economics,135,345-352.