参考文献
|
-
Alamri, A. A.,Irina H.,Aris, A.S.(2016).Efficient inventory control for imperfect quality items.European Journal of Operational Research,254(1),92-104.
-
Chauhan, N.,Yadav, A.S.(2020).An inventory model for deteriorating items with two-warehouse and dependent demand using genetic algorithm.International Journal of Advanced Science and Technology,29(5),1152-1162.
-
Chen, S.C.,Teng, J.T.(2015).Inventory and credit decisions for time-varying deteriorating items with up-stream and down-stream trade credit financing by discounted cash flow analysis.European Journal of Operational Research,243,566-575.
-
Chung, C.J.,Huang, T.S.(2007).The optimal retailer’s ordering policies for deteriorating items with limited storage capacity under trade credit financing.International Journal of Production Economics,106,127-145.
-
Datta, T.K.(2016).Inventory system with defective products and investment opportunity for reducing defective proportion.Operational Research,17,297-312.
-
Diabat, A.,Taleizadeh, A. A.,Lashgari, M.(2017).A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items.Journal of Manufacturing Systems,45,322-342.
-
Eck, K.,Engemann, M.(2015).How trade credits foster exporting.Review of World Economics,151,73-101.
-
Goyal, S. K.(1985).Economic order quantity under condition of permissible delay in payments.The Journal of the Operational Research Society,36,335-338.
-
Goyal, S. K.,Cárdenas-Barrón, L. E.(2002).Note on: Economic production quantity model for items with imperfect quality-a practical approach.International Journal of Production Economics,77,85-87.
-
Hartley, R. V.(1976).Operations Research- A Managerial Emphasis.California:Good Year Publishing Company.
-
Heydari, J.,Rastger, M.,Glock, C.(2017).A two-level delay in payments contract for supply chain coordination: The case of credit-dependent demand.International Journal of Production Economics,191,26-36.
-
Jaggi, C. K.,Cárdenas-Barrón, L. E.,Tiwari, S.,Shaffi, A. A.(2017).Two-warehouse inventory model for deteriorating items with imperfect quality under the conditions of permissible delay in payments.Scientia Iranica E,24,390-412.
-
Jaggi, C. K.,Tiwari, S.,Shafi, A. A.(2015).Effect of deterioration on two-warehouse inventory model with imperfect quality.Computers & Industrial Engineering,88,378-385.
-
Kazemi, N.,Abdul-Rashid, S.H.,Ghazilla, R.A.R.,Shekarian, E.,Zanoni, S.(2018).Economic order quantity models for items with imperfect quality and emission considerations.International Journal of Systems Science: Operations & Logistics,5,99-115.
-
Khanna, A.,Kishore, A.,Jaggi, C.(2017).Strategic production modeling for defective items with imperfect inspection process, rework, and sales return under two-level trade credit.International Journal of Industrial Engineering Computations,8,85-118.
-
Khanna, A.,Mittal, M.,Gautam, P.,Jaggi, C.(2016).Credit financing for deteriorating imperfect quality items with allowable shortages.Decision Science Letters,5,45-60.
-
Krommyda, I. P.,Skouri, K.,Lagodimos, A. G.(2019).A unified EOQ model with financial constraints and market tolerance.Applied Mathematical Modeling,65,89-105.
-
Kumar, N.,Singh, S. R.,Kumari, R.(2013).Two-warehouse inventory model for deteriorating items with three-component demand rate and time proportional backlogging rate in fuzzy environment.International Journal of Industrial Engineering Computations,4,587-598.
-
Lashgari, M.,Taleizadeh, A. A.(2016).An inventory control problem for deteriorating items with backordering and financial considerations under two levels of trade credit linked to order quantity.Journal of Industrial and Management Optimization,12,1091-1119.
-
Lashgari, M.,Taleizadeh, A. A.,Ahmadi, A.(2016).Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain.Annals of Operations Research,238,329-354.
-
Lashgari, M.,Taleizadeh, A. A.,Sadjadi, S. J.(2018).Ordering policies for non-instantaneous deteriorating items under hybrid partial prepayment, partial trade credit and partial backordering.Journal of the Operational Research Society,69(8),1167-1196.
-
Li, R.,Chan, Y.L.,Chang, C.T.,Cárdenas-Barrón, L. E.(2017).Pricing, and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash-flow analysis.International Journal of Production Economics,193,578-589.
-
Li, R.,Liu, Y.,Teng, J.T.,Tsao, Y.C.(2019).Optimal pricing, lot-sizing and backordering decisions when a seller demands an advance-cash credit payment scheme.European Journal of Operational Research,278(1),283-295.
-
Li, R.,Yang, H.,Shi, Y.,Teng, J. T.,Lai, K. K.(2021).EOQ-based pricing and customer credit decisions under general supplier payments.European Journal of Operational Research,289(2),652-665.
-
Liang, Y.,Zhou, F.(2011).A two-warehouse inventory model for deteriorating items under conditionally permissible delay in payment.Applied Mathematical Modeling,35,2221-2231.
-
Liao, J. J.,Chung, K. J.,Huang, K. N.(2013).A deterministic inventory model for deteriorating items with two warehouses and trade credit in a supply chain system.International Journal of Production Economics,146,557-565.
-
Liao, J. J.,Huang, K. N.,Chung, K. J.(2012).Lot-sizing decisions for deteriorating items with two warehouses under an order-size dependent trade credit.International Journal of Production Economics,137,102-115.
-
Mahata, G. C.(2016).Optimal ordering policy with trade credit and variable deterioration for fixed lifetime products.International Journal of Operational Research,25,307-326.
-
Mahata, G. C.,De, S. K.(2017).Supply chain inventory model for deteriorating items with maximum lifetime and partial trade credit to credit-risk customers.International Journal of Management Science and Engineering Management,12(1),21-32.
-
Mahata, P.,Mahata, G. C.,De, S. K.(2020).An economic order quantity model under two-level partial trade credit for time varying deteriorating items.International Journal of System Science: Operations & Logistics,7,1-17.
-
Mahata, P.,Mahata, G. C.,De, S. K.(2018).Optimal replenishment and credit policy in supply chain inventory model under two levels of trade credit with time- and credit-sensitive demand involving default risk.Journal of Industrial Engineering International,14(1),31-42.
-
Maihami, R.,Karimi, B.,Ghomi, S. M. T. F.(2017).Effect of two-echelon trade credit on pricing inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions.Annals of Operations Research,257,237-273.
-
Mandal, P.,Giri, B. C.(2017).A two warehouse integrated inventory model with imperfect production process under stock dependent demand and quantity discount offer.International Journal of Systems Science: Operations & Logistic,1-12.
-
Mukherjee, A.,Mahata, G. C.(2018).Optimal replenishment and credit policy in an inventory model for deteriorating items under two-levels of trade credit policy when demand depends on both time and credit period involving default risk.RAIRO-Operations Research,52(4-5),1175-1200.
-
Pal, S.,Mahapatra, G.S.(2017).A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages.Computers & Industrial Engineering,106,299-314.
-
Palanivel, M.,Uthayakumar, R.(2016).Inventory model with imperfect items, stock dependent demand and permissible delay in payments under inflation.RAIRO-Operations Research,50,473-489.
-
Panda, G. C.,Khan, MA-A,Shaikh, A. A.(2019).A credit policy approach in a two-warehouse inventory model for deteriorating items with price- and stock-dependent demand under partial back-logging.Journal of Industrial Engineering International,15,147-170.
-
Pasandideh, S. H. R.,Niaki, S. T. A.,Nobil, A.H.,Cárdenas-Barrón, L. E.(2015).A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost.International Journal of Production Economics,169,203-214.
-
Ranjan, R.S.,Uthayakumar, R.(2015).A two-warehouse inventory model for deteriorating items with permissible delay under exponentially increasing demand.International Journal of Supply and Operation Management,2(1),662-682.
-
Rosenblatt, M.J,Lee, H.L.(1986).Economic production cycles with imperfect production processes.IIE Transactions,18,48-55.
-
Salameh, M. K.,Jaber, M. Y.(2000).Economic production quantity model for items with imperfect quality.International Journal of Production Economics,64,59-64.
-
Sarma, K.V.(1983).A deterministic inventory model with two level of storage and an optimum release rule.Opsearch,20,175-180.
-
Shah, N. H.,Jani, M. Y.,Chaudhari, U.(2018).Optimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand.Mathematical and Computer Modelling of Dynamical Systems,24(1),1-11.
-
Shi, Y.,Zhang, Z.,Chen, S.C.,Cárdenas-Barrón, L. E.,Skouri, K.(2020).Optimal replenishment decisions for perishable products under cash, advance, and credit payments considering carbon tax regulations.International Journal of Production Economics,223,107514.
-
Singh, S.,Sharma, S.,Singh, S.R.(2018).Two-warehouse inventory model for deteriorating items with time dependent demand and partial backlogging under inflation.International Journal of Mathematical Modelling and Computations,8(2),73-88.
-
Taleizadeh, A. A.(2014).An economic order quantity model for deteriorating item in a purchasing system with multiple prepayments.Applied Mathematical Modeling,38,5357-5366.
-
Taleizadeh, A. A.(2017).Lot-sizing model with advance payment pricing and disruption in supply under planned partial backordering.International Transactions in Operational Research,24,783-800.
-
Taleizadeh, A. A.(2014).An EOQ model with partial backordering and advance payments for an evaporating item.International Journal of Production Economics,155,185-193.
-
Taleizadeh, A. A.,Akram, R.,Lashgari, M.,Heydari, J.(2017).A three-level supply chain with up-stream and down-stream trade credit periods linked to ordered quantity.Applied Mathematical Modelling,40,8777-8793.
-
Taleizadeh, A. A.,Mohsen, M,Akram, R.,Heydari, J.(2016).Imperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periods.Applied Mathematical Modeling,40,8777-8793.
-
Taleizadeh, A. A.,Nematollahi, M.R.(2014).An inventory control problem for deteriorating items with backordering and financial engineering considerations.Applied Mathematical Modeling,38,93-109.
-
Tavakoli, S.,Taleizadeh, A. A.(2017).An EOQ model for decaying item with full advanced payment and conditional discount.Annals of Operations Research,259(1-2),415-436.
-
Teng, J.T.,Cárdenas-Barrón, L. E.,Chang, H. J.,Wu, J.,Hu, Y.(2016).Inventory lot-size policies for deteriorating items with expiration dates and advance payment.Applied Mathematical Modelling,40,8605-8616.
-
Tiwari, S.,Cárdenas-Barrón, L. E.,Goh, M.,Shaikh, A. A.(2018).Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain.International Journal of Production Economics,200,16-36.
-
Tiwari, S.,Cárdenas-Barrón, L. E.,Khanna, A.,Jaggi, C. K.(2016).Impact of trade credit and inflation on retailer’s ordering policies for non-instantaneous deteriorating items in a two-warehouse environment.International Journal of Production Economics,176,154-169.
-
Tsao, Y. C.,Lee, P.L.,Liao, L.W.,Zhang, Q.,Vu, T. L.,Tsai, J.(2020).Imperfect economic production quantity models under predictive maintenance and reworking.International Journal of Systems Science: Operations & Logistics,7,347-360.
-
Tsao, Y. C.,Putri, Rizka Pricilia Fitriana Restu,Zhang, C.,Linh, V.T.(2019).Optimal pricing and ordering policies for perishable products under advance-cash-credit payment scheme.Journal of Industrial Engineering International,15,131-146.
-
Tsao, Y.C.,Zhang, Q.,Chang, F. C.,Vu-Thuy, L.(2017).An imperfect production model under radio frequency identification adoption and trade credit.Applied Mathematical Modelling,42,493-508.
-
Udayakumar, R.,Geetha, K. V.(2018).An EOQ model for non-instantaneous deteriorating items with two levels of storage under trade credit policy.Journal of Industrial Engineering International,14,343-365.
-
Wang, W. T.,Wee, H. M.,Cheng, Y. L.,Wen, C. L.,Cárdenas-Barrón, L. E.(2015).EOQ model for imperfect quality items with partial backorders and screening constraint.European Journal of Industrial Engineering,9(6),744-773.
-
Wu, J.,Teng, J. T.,Chan, Y. L.(2018).Inventory policies for perishable products with expiration dates and advance-cash-credit payment schemes.International Journal of System Science: Operations & Logistics,5,310-326.
-
Zhang, Q.,Tsao, Y. C.,Chen, T. H.(2014).Economic order quantity under advance payment.Applied Mathematical Modelling,38(24),5910-5921.
-
Zhou, Y.,Chen, C.,Li, C.,Zhong, Y.(2016).A synergic economic order quantity model with trade credit, shortages, imperfect quality and inspection errors.Applied Mathematical Modeling,40,1012-1028.
-
Zia, N. P. M.,Taleizadeh, A. A.(2015).A lot sizing model with backordering under hybrid linked to order multiple advance payments and delayed payment.Transportation Research Part E,82,19-37.
|