题名

鐵路列車密度與初始延滯以及調度策略對連鎖延滯之影響分析

并列篇名

The Influence of Train Density, First-Delay and Timetable Recovery Strategies on Knock-On Delay

DOI

10.6402/TPJ.201103.0063

作者

黃承傳(Cherng-Chwan Hwang);劉昭榮(Jau-Rong Liu)

关键词

連鎖延滯 ; 列車密度 ; 初始延滯 ; 運轉調度策略 ; Knock-on delay ; Train density ; First delay ; Timetable recovery strategy

期刊名称

運輸計劃季刊

卷期/出版年月

40卷1期(2011 / 03 / 30)

页次

63 - 97

内容语文

繁體中文

中文摘要

軌道系統容量不足往往是導致列車延滯之主因,尤其在初始延滯(first delay)發生後,後續所引發的連鎖延滯(knock-on delay)擴散效應對列車正常營運之影響甚大,因此欲確保系統之可靠度及服務品質,快速有效地降低連鎖延滯一直是重要課題。為有效釐清造成連鎖延滯之複雜因素及其交互作用,本研究依據臺鐵系統之運作特性開發一模擬模式作為分析工具,並以臺鐵之七堵-樹林路段為案例分析關鍵因素對於連鎖延滯之影響。本研究主要內容除研析列車密度(train density)、初始延滯及逆轉調度策略(timetable recovery strategy)對連鎖延滯之個別影響及其整體交互作用之影響外,更以迴歸分析方法構建列車連鎖延滯與該3項因子之間的指數關係函數以作為估算連鎖延滯的簡便工具。研究成果可作為排班規劃、系統可靠度分析以及服務品質改善之參考。

英文摘要

Railway system train delays are affected by many factors, and one of the most important factors is insufficient line capacity, and knock-on delays (delay propagation) caused by the first delays, always interrupt railway operation. How to reduce the knock-on delays quickly is the most important issue to maintain timetable reliability and the high quality of the railway service. In order to clarify the impacts of these complicated factors and their interactions on knock-on delays, this research develops a comprehensive simulation model to deal with the related problems, and a rail section from Cidu to Shulin of the Taiwan railway system is selected for case study. Regression analysis is used to calibrate the relationships of the knock-on delay with the three key factors, which are train density, first delay and timetable recovery strategy based on the simulation results of the case study. The regression models indicate that the relationship between the knock-on delay and these three key factors conforms to an exponential function. It is expected that the results can be helpful to timetable scheduling, system reliability analysis and service quality improvement.

主题分类 工程學 > 交通運輸工程
社會科學 > 管理學
参考文献
  1. Barter, W. M.(1998).Application of Computer Simulation to Rail Capacity Planning.Computers in Railways VI
  2. Briggs, K.,Beck, C.(2007).Modeling Train Delays with Q-exponential Functions.Physica A: Statistical Mechanics and its Applications,378(2),498-504.
  3. Carey, M.(1999).Ex ante Heuristic Measures of Schedule Reliability.Transportation Research Part B,33,473-494.
  4. Carey, M.,Carville, S.(2000).Testing Schedule Performance and Reliability for Train Stations.Journal of the Operational Research Society,51,666-682.
  5. Carey, M.,Crawford, I.(2007).Scheduling Trains on a Network of Busy Complex Stations.Transportation Research Part B,41,159-178.
  6. Chakroborty, P.,Vikram, D.(2008).Optimum Assignment of Trains to Platforms under Partial Schedule Compliance.Transportation Research Part B,42,169-184.
  7. Chang, S. C.,Chung, Y. C.(2005).From Timetabling to Train Regulation- A New Train Operation Model.Information and Software Technology,47,575-583.
  8. Corman, F.,D''Ariano, A.,Pacciarelli, D.,Pranzo, M.(2010).A Tabu Search Algorithm for Rerouting Trains during Rail Operations.Transportation Research Part B,44,175-192.
  9. Goverde, R. M. P.(2005).Railway Timetable Stability Analysis Using Max-Plus System Theory.Transportation Research Part B,41,179-201.
  10. Hansen, I. A.(2000).Station Capacity and Stability of Train Operations.Computers in Railways VII
  11. Hansen, I. A.,Pachl, J.(2008).Railway Timetable & Traffic Analysis- Modelling- Simulation.Hamburg Germany:Railway Gazette.
  12. Higgins, A.,Kozan, E.(1998).Modeling Train Delay in Urban Networks.Transportation Science,32(4),346-357.
  13. Higgins, A.,Kozan, E.,Ferreira L.(1995).Modeling Delay Risks Associated with Train Schedules.Transportation Planning and Technology,19(2),89-108.
  14. Huisman, T.,Boucherie, R. J.(2001).Running Times on Railway Sections with Heterogeneous Train Traffic.Transportation Research Part B,35,271-292.
  15. Hwang, C. C.,Liu, J. R.(2010).A Simulation Model for Estimating Knock-on Delay of Taiwan Regional Railway.Journal of the Eastern Asia Society for Transportation Studies,8,1082-1097.
  16. Jong, J. C.,Lin, T. H.,Lee, C. K.,Hu, H. L.(2010).The Analysis on Train Reliability of Taiwan High Speed Rail.Proceedings of 12th COMPRAIL Conference
  17. Mattsson, L. G.(2004).,Stockholm Sweden:Swedish Institute for Transport and Communications Analysis.
  18. Middelkoop, D.,Bouwman, M.(2002).Testing the Stability of the Rail Network.Computers in Railways VIII
  19. Nie, L.,Hansen, I. A.(2005).System Analysis of Train Operations and Track Occupancy at Railway Stations.European Journal of Transport and Infrastructure Research,5,31-54.
  20. Olsson, Nils, O. E.,Haugland, H.(2004).Influencing Factors on Train Punctuality-Results from Some Norwegian Studies.Transport Policy,11,387-397.
  21. Rietveld, P.,Bruinsma, F. R.,Van Vuuren, D. J.(2001).Coping with Unreliability in Public Transport Chains: A Case for the Netherlands.Transportation Research Part A,35,539-559.
  22. Vromans, M. J.,Dekker, R.,Kroon, L. G.(2006).Reliability and Heterogeneity of Railway Services.European Journal of Operational Research,172,647-665.
  23. Yuan, J.,Hansen, I. A.(2007).Optimizing Capacity Utilization of Stations by Estimating Knock-on Train Delays.Transportation Research Part B,41,202-217.
  24. 交通部運輸研究所(2005)。,未出版
  25. 交通部運輸研究所(2007)。,未出版
  26. 李治綱(2009)。公共運輸之安全績效:臺灣鐵管理局之個案分析。運輸計劃季刊,38(4),381-406。
  27. 周斯畏(2002)。物件導向系統分析與設計使用UML與C++。臺北市:全華科技圖書股份有限公司。
  28. 邱戊吉(2010)。碩士論文(碩士論文)。國立交通大學交通運輸研究所。
被引用次数
  1. 盧衍良、楊政樺、林詠晴、李靜旻(2013)。臺灣高鐵標準車廂及臺鐵自強號常乘顧客再購動機暨市場觀察:羅序模式之應用。顧客滿意學刊,9(1),103-134。
  2. 陶治中、洪敏琛(2015)。隨機派翠網路應用於臺鐵捷運化之運行調度模擬模式建構與分析。運輸計劃季刊,44(4),333-372。
  3. 鍾志成、黃笙茲(2015)。城際鐵路列車時刻表可靠度分析。運輸學刊,27(1),1-28。