英文摘要
|
Under the assumptions that inspections in CSP-1 are not perfect and each defective shipped to the buyer will be fined a return cost, this paper investigates a joint policy between precise inspection and CSP-1 for non-repairable products, where precise inspection is introduced to screen out the defectives for the products behind the procedure of CSP-1. By using the criterion of maximizing the unit net profit, the following five decision variables are determined: (1) the optimal clearance number, (2) the optimal sampling frequency, and (3) the proportions which should be taken precise inspection for the defectives identified by CSP-1, the non-inspected items in the procedure of CSP-1, and the non-defectives identified by CSP-1. Overall, the analytical results indicate that depending on seven parameters (Type Ⅰ error, Type Ⅱ error, the selling price of an item, the unit opportunity cost, the unit return cost, the unit cost of precise inspection, and the process defective fraction), two main inspection policies for CSP-1 are ”Do not inspect” and ”Do 100% inspection.” Besides, for the defectives and the non-defectives identified in CSP-1 and the non-inspected items, two main proportions which should be performed precise inspection are: 100% and 0%.
|
参考文献
|
-
Chen, C. H.,Chou, C. Y.(2004).Minimum average fraction inspected for modified CSP-1 plan.Pan-Pacific Management Review,7(1),35-43.
連結:
-
Lin, T. Y.,Yu, H. F.(2009).An optimal policy for CSP-1 with inspection errors and return cost.Journal of Chinese Institute of Industrial Engineers,26(1),70-76.
連結:
-
Dodge, H. F., 1943, A sampling inspection plan for continuous production, Annals of Mathematical Statistics, 14(3), 264-279.
-
Case, K. E.,Bennett, G. K.,Schmidt, J. W.(1973).The Dodge CSP-1 continuous sampling plan under inspection error.AIIE Transactions,5(2),193-202.
-
Chen, C. H.,Chou, C. Y(2002).Economic design of continuous sampling plan under linear inspection cost.Journal of Applied Statistics,29(7),1003-1009.
-
Endres, A. C.(1979).Minimum AFI plan designs for inspection error.Proceedings of ASQC Technical Conference Transaction-Houston
-
Govindaraju, K.,Kandasamy, C.(2000).Design of generalized CSP-C continuous sampling plan.Journal of Applied Statistics,27(7),829-841.
-
Haji, A.,Haji, R.(2004).The optimal policy for a sampling plan in continuous production in terms of the clearance number.Computers and Industrial Engineering,47(2),141-147.
-
Resnikoff, G. J.(1960).Minimum average fraction inspected for a continuous sampling plan.Journal of Industrial Engineering,11(2),208-209.
-
Ross, S. M.(1993).Introduction to probability models.New York:Academic Press, Inc..
-
Wang, R. C.,Chen, C. H.(1997).Minimum average fraction inspected for continuous sampling plan CSP-1 under inspection error.Journal of Applied Statistics,24(5),539-548.
-
Yu, H. F.,Yu, W. C.,Wu, W. P.(2009).A mixed inspection policy for CSP-1 and precise inspection under inspection errors and return cost.Computers and Industrial Engineering,57(3),652-659.
|