参考文献
|
-
Artana, K. B.,Ishida, K.(2002).Spreadsheet modeling of optimal maintenance schedule for components in wear-out phase.Reliability Engineering & System Safety,77(1),81-91.
-
Ashayeri, J.,Teelen, A.,Selen, W.(1996).A production and maintenance planning model for the process industry.International Journal of Production Research,34(12),3311-3326.
-
Baker, K. R.,Jia, D.(1993).A comparative study of lot streaming procedures.Omega,21(5),561-566.
-
Ben-Daya, M.,Al-Fawzan, M.(1996).A simulated annealing approach for the one-machine mean tardiness scheduling problem.European Journal of Operational Research,93(1),61-67.
-
Billinton, R.,Pan, J.(1999).Optimal maintenance scheduling in a parallel redundant system consisting of series components in each branch.IEEE Transactions on Power Delivery,14(3),928-933.
-
Botta-Genoulaz, V.(2000).Hybrid flow shop scheduling with precedence constrains and time lags to minimize maximum lateness.International Journal of Production Economics,64(1-3),101-111.
-
Campbell, H. G.,Dudek, R. A.,Smith, M. L.(1970).A heuristic algorithm for the n job, m machine sequencing problem.Management Science,16(10),B630-B637.
-
Canfield, R. V.(1986).Cost optimization of periodic preventive maintenance.IEEE Transactions on Reliability,35(1),78-81.
-
Caraffa, V.,Ianes, S.,Bagchi, T. P.,Sriskandarajah, C.(2001).Minimizing makespan in a blocking flowshop using genetic algorithms.International Journal of Production Economics,70(2),101-115.
-
Cassady, C. R.,Kutanoglu, E.(2003).Minimizing job tardiness using integrated preventive maintenance and production scheduling.IIE Transactions,35(6),503-513.
-
Cassady, C. R.,Kutanoglu, E.(2005).Integrating preventive maintenance planning and production scheduling for a single machine.IEEE Transactions on Reliability,54(2),304-309.
-
Chang, Y. C.,Cheng, H. C.,Wu, W. F.(1997).Reliability centered maintenance policy.Proceedings of the Annual Reliability and Maintainability Symposium
-
Chen, T.,Qi, X.,Tu, F.(1994).A bicriteria scheduling problem with earliness and tardiness penalties.Proceedings of the 33rd IEEE Conference on Decision and Control
-
Chen, W. J.(2006).Minimizing total flow time in the single-machine scheduling problem with periodic maintenance.The Journal of the Operational Research Society,57(4),410-415.
-
Dondeti, V. R.,Mohanty, B. B.(1998).Impact of learning and fatigue factors on single machine scheduling with penalties for tardy jobs.European Journal of Operational Research,105(3),509-524.
-
Feldmann, M.,Biskup, D.(2003).Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches.Computers & Industrial Engineering,44(2),307-323.
-
Graves, G. H.,Lee, C.-Y(1999).Scheduling maintenance and semiresumable jobs on a single machine.Naval Research Logistics,46(7),845-863.
-
Grigoriev, A.,van de Klundert, J.,Spieksma, F. C. R.(2006).Modeling and solving the periodic maintenance problem.European Journal of Operational Research,172(3),783-797.
-
Hino, C. M.,Ronconi, D. P.,Mendes, A. B.(2005).Minimizing earliness and tardiness penalties in a single-machine problem with a common due date.European Journal of Operational Research,160(1),190-201.
-
Koulamas, C.(1998).On the complexity of two-machine flowshop problems with due date related objectives.European Journal of Operational Research,106(1),95-100.
-
Kumar, D.,Westberg, U.(1997).Maintenance scheduling under age replacement policy using proportional hazards model and TTT-plotting.European Journal of Operational Research,99(3),507-515.
-
Lee, C.-Y.,Chen, Z.-L.(2000).Scheduling jobs and maintenance activities on parallel machines.Naval Research Logistics,47(2),145-165.
-
Lenstra, J. K.,Kan Rinnooy, A. H. G.,Brucker, P.(1977).Complexity of machine scheduling problems.Annals of Discrete Mathematics,1,343-362.
-
Liao, C. J.,Chen, W. J.(2003).Single-machine scheduling with periodic maintenance and nonresumable jobs.Computers & Operations Research,30(9),1335-1347.
-
Lin, B. M. T.(2001).Scheduling in the two-machine flowshop with due date constraints.International journal of Production Economics,70(2),117-123.
-
Malik, M. A. K.(1979).Reliable preventive maintenance scheduling.AIIE Transactions,11(3),221-228.
-
Nakagawa, T.(1986).Periodic and sequential preventive maintenance policies.Journal of Applied Probability,23(2),536-542.
-
Percy, D. F.,Kobbacy, K. A. H.(2000).Determining economical maintenance intervals.International Journal Of Production Economics,67(1),87-94.
-
Qi, X.(2007).A note on worst-case performance of heuristics for maintenance scheduling problems.Discrete Applied Mathematics,155(3),416-422.
-
Ruiz, R.,Garcia-Diaz, J. C.,Maroto, C.(2007).Considering scheduling and preventive maintenance in the flowshop sequencing problem.Computers & Operations Research,34(11),3314-3330.
-
Rutz, D.(2006).Preventive maintenance for drives and control systems.Pulp & Paper,80(7),19.
-
Samrout, M.,Yalaoui, F.,Châtelet, E.,Chebbo, N.(2005).New methods to minimize the preventive maintenance cost of series-parallel systems using ant colony optimization.Reliability Engineering & System Safety,89(3),346-354.
-
Santos, D. L.,Hunsucker, J. L.,Deal, D. E.(1996).An evaluation of sequencing heuristics in flow shops with multiple processors.Computers & Industrial Engineering,30(4),681-691.
-
Sen, T.,Sulek, J. M.,Dileepan, P.(2003).Static scheduling research to minimize weighted and unweighted tardiness: a state-of-art survey.International Journal of Production Economics,83(1),1-12.
-
Sortrakul, N.,Nachtmann, H. L.,Cassady, C. R.(2005).Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine.Computers in Industry,56(2),161-168.
-
Tam, A. S. B.,Chan, W. M.,Price, J. W. H.(2006).Optimal maintenance intervals for a multicomponent system.Production Planning & Control,17(8),769-779.
-
Yeh, R. H.,Chen, M.-Y(2005).Optimal preventive-maintenance warranty policies for repairable products with age-dependent maintenance costs.International Journal of Reliability, Quality and Safety Engineering,12(2),111-125.
-
Zhou, B.-H.,Jiang, S.-Y.,Wang, S.-J.,Wu, B.,Xi, L.-F.(2007).Integrated production and preventive maintenance scheduling algorithm for flow shops.Journal of Dalian Maritime University,33(3),32-35.
|