参考文献
|
-
Chen, C. H.,Chou, C. Y.(2004).Minimum average fraction inspected for modified CSP-1 plan.Pan-Pacific Management Review,7(1),35-43.
連結:
-
Lin, T. Y.(2008).Optimal inspection policy for CSP-T with return cost using GERT.Journal of Chinese Institute of Industrial Engineers,25(6),446-456.
連結:
-
Lin, T. Y.,Yu, H. F.(2009).An optimal policy for CSP-1 with inspection errors and return cost.Journal of Chinese Institute of Industrial Engineers,26(1),70-76.
連結:
-
Yu, H. F.,Yu, W. C.(2011).A joint inspection policy for CSP-1 and precise inspection for nonrepairable products under inspection errors and return cost.Journal of Quality,18(1),61-74.
連結:
-
Dodge, H. F., 1943, A sampling inspection plan for continuous production, Annals of Mathematical Statistics, 14(3), 264-279.
-
Balamurali, S.(1999).Modified two-level continuous sampling plans.Economic Quality Control,14(3-4),123-133.
-
Balamurali, S.,Govindaraju, K.(2000).Modified tightened two-level continuous sampling plans.Journal of Applied Statistics,27(4),397-409.
-
Balamurali, S.,Jun, C. H.(2004).Modified CSP-T sampling procedures for continuous production processes.Quality Technology and Quantitative Management,1(2),175-188.
-
Case, K. E.,Bennett, G. K.,Schmidt, J. W.(1973).The Dodge CSP-1 continuous sampling plan under inspection error.AIIE Transactions,5(2),193-202.
-
Chen, C. H.,Chou, C. Y.(2002).Economic design of continuous sampling plan under linear inspection cost.Journal of Applied Statistics,29(7),1003-1009.
-
Chen, C. H.,Chou, C. Y.(2006).Economic design of short-run CSP-1 plan under linear inspection cost.Tamkang Journal of Science and Engineering,9(1),19-23.
-
Derman, C.,Littauer, S.,Solomon, H.(1957).Tightened multi-level continuous sampling plans.Annals of Mathematical Statistic,28(2),395-404.
-
Dodge, H. F.,Torrey, M. N.(1951).Additional continuous sampling inspection plans.Industrial Quality Control,7(5),7-12.
-
Fordice, J. J.(1972).CSP-T ReportCSP-T Report,Ammunition Procurement and Supply Agency.
-
Ghosh, D. T.(1990).The optimum CSP-2 (k = i) that minimizes inspection when incoming quality p follows a distribution.Operations Research,27(3),153-164.
-
Ghosh, D. T.(1996).An optimum continuous sampling plan CSP-2 with k ≠ i to minimize the amount of inspection when incoming quality p follows a distribution.The Indian Journal of Statistics,58(Series B),105-117.
-
Ghosh, D. T.(1990).The optimum continuous sampling plan CSP-2 with k = i that minimizes the amount of inspection.Operations Research,27(1),31-38.
-
Govindaraju, K.,Kandasamy, C.(2000).Design of generalized CSP-C continuous sampling plan.Journal of Applied Statistics,27(7),829-841.
-
Haji, A.,Haji, R.(2004).The optimal policy for a sampling plan in continuous in terms of the clearance number.Computers & Industrial Engineering,47(2-3),141-147.
-
Jun, C. H.,Balamurali, S.,Kalyanasundaram, M.(2006).Evaluation and design of two level continuous sampling plans.Tamkang Journal of Science and Engineering,9(4),409-417.
-
Lieberman, G. J.,Solomon, H.(1955).Multi-level continuous sampling plans.Annals of Mathematical Statistics,26(4),686-704.
-
Murphy, R. B.(1959).Stopping rules with CSP-1 sampling inspection plans in continuous production.Industrial Quality Control,16(5),10-16.
-
Resnikoff, G. J.(1960).Minimum average fraction inspected for a continuous sampling plan.Journal of Industrial Engineering,11(2),208-209.
-
Shankar, G.,Mohapatra, B. N.(1994).GERT analysis of Dodge's CSP-1 continuous sampling plan.The Indian Journal of Statistics,56(Series B),468-478.
-
Wang, R. C.,Chen, C. H.(1993).The design of CSP-2 under the conditioned inspection capacity.The International Journal of Quality & Reliability Management,10(3),43-60.
-
Wang, R. C.,Chen, C. H.(1994).Minimum AFI for CSP-2 under inspection error.Computer & Industrial Engineering,26(4),755-785.
-
Wang, R. C.,Chen, C. H.,(1997).Minimum average fraction inspected for continuous sampling plan CSP-1 under inspection error.Journal of Applied Statistics,24(5),539-548.
-
Yu, H. F.,Chang, A. Y.,Chiang, Y. C.(2010).A mixed inspection policy for CSP-2 and precise inspection under inspection errors and return cost.Journal of the Chinese Institute of Industrial Engineers,27(4),304-315.
-
Yu, H. F.,Yu, W. C.(2008).The optimal production and quality policy for the vendor in a trade.International Journal of Production Research,46(15),4135-4153.
-
Yu, H. F.,Yu, W. C.,Wu, W. P.(2009).A mixed inspection policy for CSP-1 and precise inspection under inspection errors and return cost.Computers & Industrial Engineering,57(3),652-659.
|