英文摘要
|
Through taking the relay production line as the example, and by analyzing the production process, working hours, logistics, worker movements and manufacturing line balance, the present study aimed to locate the problems and improve the production system. The results showed that the work efficiency was significantly improved applying the methods of industrial engineering. This further proofed that performing industrial engineering is able to achieve management innovation, improve work efficiency and production quality.
|