参考文献
|
-
任恒毅,廖秀姬(2008)。精實生產價值溪流程改善方法之實證研究—以某汽車空調製造商為例。品質學報,15(5),323-336。
連結:
-
林秀娟,李元墩,戴謙(2012)。高科技企業員工工作品質改善之研究—工作負荷觀點。品質學報,19(5),445-463。
連結:
-
俞凱允,蘇力萍(2019)。整合六標準差及精實生產於ISO 9000品質管理系統。品質學報,26(2),92-113。
連結:
-
陳順興,吳逸萍(2012)。全面品質管理對行銷管理、顧客滿意度與顧客忠誠度影響之研究—以國內證券業為例。品質學報,19(5),491-522。
連結:
-
楊錦洲(2009)。整合6σ—專案與策略規劃之營運系統。品質學報,16(1),15-22。
連結:
-
盧昆宏,劉威志(2018)。應用精實六標準差提升In-House公司的發料效率。品質學報,25(6),380-398。
連結:
-
Ahmad, S.,Schroeder, R. G.,Sinha, K. K.(2003).The role of infrastructure practices in the effectiveness of JIT practices: implications for plant competitiveness.Journal of Engineering and Technology Management,20(3),161-191.
-
Amit, R.,Belcourt, M.(1999).Human resources management processes: a value-creating source of competitive advantage.European of Management Journal,17(2),174-181.
-
Bevilacqua, M.,Ciarapica, F. E.,De Sanctis, I.(2017).Lean practices implementation and their relationships with operational responsiveness and company performance: an Italian study.International Journal of Production Research,55(3),769-794.
-
Bicheno, J.(1989).Cause and Effect of JIT: A Pocket Guide.Buckingham, UK:Production and Inventory Control Systems and Industrial Engineering Books.
-
Black, J. T.(2007).Design rules for implementing the Toyota production system.International Journal of Production Research,45(16),3639-3664.
-
Bowersox, D. J.,Closs, D. J.,Stank, T. P.,Keller, S. B.(2000).How supply chain competency leads to business success.Supply Chain Management Review,4(4),70-78.
-
Chahal, V.,Narwal, M. S.(2017).Impact of lean strategies on different industrial Lean Wastes.International Journal of Theoretical and Applied Mechanics,12(2),275-286.
-
Chan, J. S.,Samson, D. A.,Sohal, A. S.(1990).An integrative model of Japanese manufacturing techniques.International Journal of Operations & Production Management,10(9),37-56.
-
Cravvford, K. M.,Blackstone, J. H., Jr.,Cox, J. F.(1988).A study of JIT implementation and operating problems.International Journal of Production Research,26(9),1561-1568.
-
Cua, K. O.,McKone, K. E.,Schroeder, R. G.(2001).Relationships between implementation of TQM, JIT, and TPM and manufacturing performance.Journal of Operations Management,19(2),675-694.
-
Dahlgaard, J. J.,Kristensen, K.,Kanji, G. K.(1998).Fundamentals of Total Quality Management.London, UK:Taylor & Francis.
-
Das, A.,Jayaram, J.(2007).Socio-technical perspective on manufacturing system synergies.International Journal of Production Research,45(1),169-205.
-
Daugherty, P. J.,Spencer, M. S.(1990).Just in time concepts: applicability to logistics/transportation.International Journal of Physical Distribution & Logistics Management,20(7),12-18.
-
de Jesus Pacheco, D. A.,Pergher, I.,Junior, J. A. V. A.,Vaccaro, G. L. R.(2019).Exploring the integration between lean and the theory of constraints in operations management.International Journal of Lean Six Sigma,10(3),718-742.
-
de Menezes, L. M.,Wood, S.(2006).The reality of flexible work systems in Britain.The International Journal of Human Resource Management,17(1),106-138.
-
Dwyer, G.(2002).Quality management initiatives and people management strategies: the need for integration in the new millennium in an Irish context.International Journal of Quality & Reliability Management,19(5),524-539.
-
Finch, B. J.,Cox, J. F.(1986).An examination of just-in-time management for the small manufacturer: with an illustration.International Journal of Production Research,24(2),329-342.
-
Flynn, B. B.,Schroeder, R. G.,Flynn, E. J.(1999).World class manufacturing: an investigation of Hayes and Wheelwright’s foundation.Journal of Operations Management,17(3),249-269.
-
Genaidy, A. M.,Karwowski, W.(2003).Human performance in lean production environment: critical assessment and research framework.Human Factors and Ergonomics in Manufacturing & Service Industries,13(4),317-330.
-
Guest, D.(2002).Human resource management, corporate performance and employee wellbeing: building the worker into HRM.Journal of Industrial Relations,44(3),335-358.
-
Hay, E. J.(1988).The Just-in-Time Breakthrough: Implementing the New Manufacturing Basics.New York, NY:Wiley.
-
Hayes, R. H.(1981).Why Japanese factories work.Harvard Business Review,59(4),56-65.
-
Holweg, M.(2007).The genealogy of lean production.Journal of Operations Management,25(2),420-437.
-
Inman, R. A.,Sale, R. S.,Green, K. W., Jr.,Whitten, D.(2011).Agile manufacturing: relation to JIT, operational performance and firm performance.Journal of Operations Management,29(4),343-355.
-
Jackson, S. E.,Schuler, R. S.,Rivero, J. C.(1989).Organizational characteristics as predictors of personnel practices.Personnel Psychology,42(4),727-786.
-
Kaynak, H.(2003).The relationship between total quality management practices and their effects on firm performance.Journal of Operations Management,21(4),405-435.
-
Koufteros, X. A.,Vonderembse, M. A.,Doll, W. J.(1998).Developing measures of time-based manufacturing.Journal of Operations Management,16(1),21-41.
-
Lee, B.-H.,Jo, H.-J.(2007).The mutation of the Toyota production system: adapting the TPS at Hyundai Motor Company.International Journal of Production Research,45(16),3665-3679.
-
Lee, S. M.,Ebrahimpour, M.(1984).Just-in-time production system: some requirements for implementation.International Journal of Operations & Production Management,4(4),3-15.
-
Liker, J. K.(2004).The Toyota Way: 14 Management Principles From the World’s Greatest Manufacturer.NewYork, NY:McGraw-Hill.
-
Liker, J. K.(ed.),Fruin, W. M.(ed.),Adler, P. S.(ed.)(1999).Remade in America: Transplanting and Transforming Japanese Management Systems.New York, NY:Oxford University Press.
-
Liker, Jeffrey K.,Hoseus, Michael,李芳齡(譯)(2008).豐田文化:複製豐田DNA的核心關鍵.臺北:麥格羅希爾出版.
-
MacDuffie, J. P.(1995).Human resource bundles and manufacturing performance: organizational logic and flexible production systems in the world auto industry.Industrial and Labor Relations Review,48(2),197-221.
-
Melton, T.(2005).The benefits of lean manufacturing: what lean thinking has to offer the process industries.Chemical Engineering Research and Design,83(6),662-673.
-
Monden, Y.(1981).What makes the Toyota production system really tick?.Industrial Engineering,13(1),36-46.
-
Negrão, L. L. L.,Filho, M. G.,Marodin, G.(2017).Lean practices and their effect on performance: a literature review.Production Planning & Control,28(1),31-56.
-
Nimeh, H. A.,Abdallah, A. B.,Sweis, R.(2018).Lean supply chain management practices and performance: empirical evidence from manufacturing companies.International Journal of Supply Chain Management,7(1),1-15.
-
Oakland, J. S.(2003).Total Quality Management: Text With Cases.Oxford, UK:Butterworth-Heinemann.
-
Onofrei, G.,Fynes, B.(2019).Quality practices as a mediator of the relationship between lean practices and production fitness.International Journal of Lean Six Sigma,10(1),500-522.
-
Onofrei, G.,Fynes, B.,Nguyen, H.,Azadnia, A. H.(2020).Quality and lean practices synergies: a swift even flow perspective.International Journal of Quality & Reliability Management,38(1),98-115.
-
Paez, O.,Dewees, J.,Genaidy, A.,Tuncel, S.,Karwowski, W.,Zurada, J.(2004).The lean manufacturing enterprise: an emerging sociotechnological system integration.Human Factors and Ergonomics in Manufacturing,14(3),285-306.
-
Panwar, A.,Jain, R.,Rathore, A. P. S.,Nepal, B.,Lyons, A. C.(2018).The impact of lean practices on operational performance-an empirical investigation of Indian process industries.Production Planning & Control,29(2),58-169.
-
Pegels, C. C.(1984).The Toyota production system-lessons for American management.International Journal of Operations & Production Management,4(1),3-11.
-
Piper, C. J.,McLachlin, R. D.(1990).Just-in-time production: eleven achievable dimensions.Operations Management Review,7(3–4),1-8.
-
Reed, R.,Lemak, D. J.,Montgomery, J. C.(1996).Beyond process: TQM content and firm performance.Academy of Management Review,21(1),173-202.
-
Richey, D.(1996).The Shingo Prize for excellence in manufacturing.Journal for Quality and Participation,19(4),28-31.
-
Sakakibara, S.,Flynn, B. B.,Schroeder, R. G.,Morris, W. T.(1997).The impact of just-in-time manufacturing and its infrastructure on manufacturing performance.Management Science,43(9),1246-1257.
-
Schonberger, R. J.(2007).Japanese production management: an evolution-with mixed success.Journal of Operations Management,25(2),403-419.
-
Seppälä, P.,Klemola, S.(2004).How do employees perceive their organization and job when companies adopt principles of lean production?.Human Factors and Ergonomics in Manufacturing & Service Industries,14(2),157-180.
-
Shah, R.,Ward, P. T.(2003).Lean manufacturing: context, practice bundles, and performance.Journal of Operations Management,21(2),129-149.
-
Sugimori, Y.,Kusunoki, K.,Cho, F.,Uchikawa, S.(1977).Toyota production system and kanban system materialisation of just-in-time and respect-for-human-system.International Journal of Production Research,15(6),553-564.
-
Suzaki, K.(1985).Japanese manufacturing techniques: their importance to U.S. manufacturers.Journal of Business Strategy,5(3),10-19.
-
Takeuchi, H.,Osono, E.,Shimizu, N.(2008).The contradictions that drive Toyota’s success.Harvard Business Review,86(6),96-104.
-
Uluskan, M.,McCreery, J. K.,Rothenberg, L.(2018).Impact of quality management practices on change readiness due to new quality implementations.International Journal of Lean Six Sigma,9(3),351-373.
-
Vázquez-Bustelo, D.,Avella, L.,Fernández, E.(2007).Agility drivers, enablers and outcomes: empirical test of an integrated agile manufacturing model.International Journal of Operations & Production Management,27(12),1303-1332.
-
Venkatraman, N.,Ramanujam, V.(1986).Measurement of business performance in strategy research: a comparison of approaches.Academy of Management Review,11(4),801-814.
-
Voss, C. A.,Robinson, S. J.(1987).Application of just-in-time manufacturing techniques in the United Kingdom.International Journal of Operations & Production Management,7(4),46-52.
-
Wemmerlov, U.,Johnson, D. J.(2000).Empirical findings on manufacturing cell design.International Journal of Production Research,38(3),481-507.
-
White, R. E.(1993).An empirical assessment of JIT in U.S. manufacturers.Production and Inventory Management Journal,34(2),38-42.
-
White, R. E.,Pearson, J. N.,Wilson, J. R.(1999).JIT Manufacturing: a survey of implementations in small and large U.S. manufacturers.Management Science,45(1),1-15.
-
Womack, J. P.,Jones, D. T.(1996).Lean Thinking: Banish Waste and Create Wealth in Your Corporation.New York, NY:Simon & Schuster.
-
Womack, J. P.,Jones, D. T.(1994).From lean production to the lean enterprise.Harvard Business Review,72(2),93-103.
-
Wu, Y. C.(2003).Lean manufacturing: a perspective of lean suppliers.International Journal of Operations & Production Management,23(11),1349-1376.
-
Yang, C.-C.(2006).The impact of human resource management practices on the implementation of total quality management: an empirical study on high tech firms.The TQM Magazine,18(2),162-173.
-
Yang, C.-C.,Yeh, T.-M.,Yang, K.-J.(2011).The implementation of technical practices and human factors of the Toyota production system in different industries.Human Factors and Ergonomics in Manufacturing & Service Industries,22(6),541-555.
-
李友錚,賀力行(2010).品質管理:整合性思維.臺北:前程文化.
|