英文摘要
|
There have been few studies to explore the relationship between risk-sharing and revenue-sharing within BOT projects, although many studies have explored issues of risk-sharing and revenue-sharing separately. However, to achieve the objectives of risk management and revenue-sharing it is critical, during the operational phase, to construct a balance mechanism between risk-sharing and revenue-sharing for BOT projects. In this paper we have shown a mathematical model for assessing risk-sharing and revenue-sharing based on income-guaranteed and royalty computed alternatives and then taking into account a balance mechanism. The mathematical model describes the relationship between risk-sharing and revenue-sharing using the real option approach from the public utility viewpoint. Additionally, this paper conducted a case study with the Taipei Port Container Logistic BOT project to find the operation income-guaranteed and royalty computed income, respectively. Results of the case study show that the developed model can be applied to describe the relationship between risk-sharing and revenue-sharing for BOT projects and the balance mechanism between the public utility and the private-sector.
|
参考文献
|
-
邱裕鈞、沈秋美(2005)。不確定環境下的交通建設BOT計畫權利金模式。運輸學刊,17(2),123-146。
連結:
-
康照宗、馮正民、黃思綺(2004)。以政府觀點發展BOT計畫財務模型。運輸計劃季刊,33(1),1-27。
連結:
-
康照宗、馮正民、黃思綺(2005)。以政府觀點構建BOT計畫權利金棋式。管理學報,22(2),173-189。
連結:
-
張大成、周麗娟、劉宛怡(2004)。BOT專案收購保證與貸款保證之探討。經濟論文叢刊,3(2),447-481。
連結:
-
(2002)。天開規劃,高鐵車站特定區剩餘可建地出租程序之研究。台北:交通部高速鐵路工程局。
-
(1996)。茂林國際開發,台北國際金融大樓-市場與財務可行性分析與開發方案建議報告書。
-
David Ehrhardt,Timothy Irwin(2004).The World Bank, Policy Research Working Paper SeriesThe World Bank, Policy Research Working Paper Series,未出版
-
David, A. K.(1996).Risk modeling in energy contract between host utilities and POT plant investors.IEEE Transaction on Energy and Conversion,11(2),359-365.
-
Ghosh, Sid,Jintanapakanont, Jakkapan(2004).Identifying and assessing the critical risk factors in an underground rail project in Thailand: A factor analysis approach.International Journal of Project Management,22,633-643.
-
Grimsey, Darrin,Mervyn K. Lewis(2002).Evaluating the risks of public private partnerships for infrastructure projects.International Journal of Project Management,20,107-118.
-
Kumaraswamy, M. M.,Zhang, X. Q.(2001).Governmental role in DOT-led infrastructure development.International Journal of Project Management,1(19),195-205.
-
Li, Bing,A. Akinotoye,P. J. Edwardsm,Hardcastle, C.(2005).The allocation of risk in PPP/PFI construction projects in the UK.International Journal of Project Management,23,25-35.
-
Patrick, T. I. Lam(1999).A sectoral review of risks associated with major-infrastructure projects.International Journal of Project Management,17(2),77-87.
-
Tiong, L. K.(1997).Final negotiation in competitive POT tender.Journal of Construction Engineering and Management,123(1),6-10.
-
Zayed, Tarek M.,Chang, Luh-Maan(2002).Prototype model for Build-Operate-Transfer risk assessment.Journal of Management in Engineering,18(1),7-16.
-
交通部基隆港務局(2000)。徵求民間機構參與興建暨營運台北港貨櫃儲運中心建設計畫。
-
周蒔霈(2000)。碩士論文(碩士論文)。國立交通大學土木工程系。
-
張大成、賴景昌(2000)。BOT放棄價值的評估-以臺灣高速鐵路為例。管理學報,17(3),441-460。
-
許家駒(2000)。碩士論文(碩士論文)。國立交通大學交通運輸研究所。
-
陳煌銘(1999)。論BOT計畫之投資及風險管理策略。公營事業評論,1(2),19-50。
-
馮正民、康照宗(2000)。BOT計畫談判群體之風險衡量。運輸計劃季刊,29(4),709-738。
-
劉正怡(2002)。碩士論文(碩士論文)。國立高雄第一科技大學運輸倉儲營運所。
|