题名

從總成本觀點探討產品線生產延遲規劃之決策

并列篇名

An Analysis on Decisions of Production Postponement Planning through the Viewpoint of Total Cost

作者

吳杉堯(Shan-Yau Wu)

关键词

多階生產系統 ; 延遲策略 ; 製程規劃決策 ; Multi-stage Production Systems ; Postponement Strategy ; Process Planning Decisions

期刊名称

管理與系統

卷期/出版年月

14卷3期(2007 / 07 / 01)

页次

317 - 339

内容语文

繁體中文

中文摘要

本文針對多階生產線的生產延遲點規劃決策提供一組合適的解。這種生產延遲包括在生產過程中延緩產品的流程,直到接到訂單,此稱為時間延遲,或者是在某一生產階段之後將產品差異化,此稱為樣式延遲。本研究建構產品線的延遲點規劃數學決策模式,尋找最低總成本的解,並且以實際範例說明求解的步驟,以及各項系統參數對延遲點規劃決策的影響,執行結果顯示生產率、單位存貨成本、及投資設置成本三者非常影響產品線延遲點規劃的決策。

英文摘要

This paper gives an appropriate solution to the revised flow line, which often involves delaying the delivery of the products until the customer orders arrive, termed time postponement, or delaying the differentiation of the products until later production stages, termed form postponement. Our model enables us to quantify the total cost of the planning decision of the flow line. In a numerical study the influence of various model parameters is investigated and it is shown that the production rate, unit holding cost, and investment cost for postponement can obviously affect to the solution of the revised flow line.

主题分类 基礎與應用科學 > 統計
社會科學 > 財金及會計學
社會科學 > 管理學
参考文献
  1. Bogaschewsky, R.W.,Buscher, U. D.,Linder, G.(2001).Optimizing Multi-stage Production with Constant Lot Size and Varying Number of Unequal Sized Batches.Omega,29,183-191.
  2. Bowersox, C.(1996).Logistics Management-The Integrated Supply Chain Process.McGraw-Hill.
  3. Cooper, J. C.(1993).Logistics Strategies for Global Businesses.International Journal of Physical Distribution and Logistics Management,23(4),12-23.
  4. Dapiran, P.(1993).Benetton-Global Logistics in Action.International Journal of Physical Distribution and Logistics Management,23(1),1-5.
  5. Ding, H.(1994).Initial Order Quantities in Multistage Serial Production Systems.International Journal of Production Economics,35(1-2),277-284.
  6. Feitzinger, E.,Lee, H. L.(1997).Harvard Business Review.
  7. Goyal, S. K.(1977).Economic Batch Quantity in a Multi-stage Production System.International Journal of Production Research,16,267-273.
  8. Houshyar, A.(1992).Single Product Multistage Production with Material Handler and Central Storage.International Journal of Production Research,30(2),353-367.
  9. Kimura, O.,Terada, H.(1981).Design and Analysis of Pull System, A Method of Multi-stage Production Control.International Journal of Production Research,19,241-253.
  10. Lee, H. L.,Billington, C.,Carter, B.(1993).Hewlett-Packard Gains Control of Inventory and Service through Design for Localization.Interfaces,23,1-11.
  11. Lee, H. L.,Tang, C. S.(1997).Modeling The Costs And Benefits of Delay Product Differentiation.Management Science,43(1),40-54.
  12. Lee, S. D.,Rung, J. M.(2000).Production Lot Sizing in Failure Prone Two-stage Serial System.European Journal of Operational Research,123,42-60.
  13. Nagaraj, P.,Selladurai, V.(2002).Analysis of Optimum Batch Size in Multistage, Multifacility and Multiproduct Manufacturing Systems.International Journal of Advanced Manufacturing Technology,19,117-124.
  14. Pagh, C.(1998).Supply Chain Postponement and Speculation Strategies: How to Choose the Right Strategy.Journal of Business Logistics,19(2),13-32.
  15. Takeda, K.,Kuroda, M.(1997).Analysis of Multi-stage Production and Inventory System with an Acceptable Response Time.Computers in Industrial Engineering,33(3-4),725-728.
  16. Wu, S. Y.(2004).Analysis of Multistage Production-inventory Systems with Variable Production Rate.Journal of Commercial Modernizations,3(1),16-21.
  17. Yang, B.,Burns, N.(2003).Implications of Postponement for the Supply Chain.International Journal of Production Research,41(9),2075-2090.
  18. Zinn, W.,Bowersox, D. J.(1988).Planning Physical Distribution with the Principle of Postponement.Journal of Business Logistics,9(2),117-136.
被引用次数
  1. 簡禎富、許鉅秉、林國義、吳政鴻(2016)。台灣生產與作業管理之相關期刊文獻回顧與前瞻:從工業3.0 到工業3.5。管理學報,33(1),87-103。
  2. 詹凌菁、彭火樹、郭翠菱、吳安妮(2016)。臺灣會計領域研究之回顧與展望。管理學報,33(1),139-187。