题名

備用元件重複配置最佳化設計

并列篇名

An Optimal Redundancy Allocation Design of Standby Components

DOI

10.6626/MR.2011.11(1).06

作者

黃允成(Yun-Cheng Huang);池秉燊(Ping-Shen Chi);張清怡(Ching-Yi Chang)

关键词

串聯系統 ; 重複配置 ; 總利潤 ; series system ; redundancy allocation ; total profit

期刊名称

管理研究學報

卷期/出版年月

11卷1期(2011 / 06 / 01)

页次

157 - 180

内容语文

繁體中文

中文摘要

現實問題中許多產品在進行可靠度設計之初,往往受到研發成本與其他限制因素影響,導致備用元件重複配置的數量與配置位置都會有所限制;然而過去相關之可靠度研究,鮮少從總利潤與重複配置個數之關聯性進行探討。故本研究針對串聯系統,考量在既定投入資金及重複配置個數限制之條件下,建構備用元件重複配置之總利潤模型,並探討各元件重複配置對整體系統可靠度之影響。最後,提出一數值範例進行分析以驗證模型之可行性。所得結論將可提供備用元件重複配置可靠度最佳化設計之參考。

英文摘要

In reality, there are many problems at the beginning of the product reliability design. Thecost of the research and development and other constraints will limit the quantity and the configuration location of the redundancy components. However, in the researches of thereliability, there are few of them carried on the discussion from the total profit and the relatedarrangement of redundancy components. Therefore, this research is in view of the series system. In the limitation of the investment fund and the redundancy allocation quantity, this study constructed the model of the total profit for the redundancy allocation of the standby components. And then we discussed the influences to the total system reliability by theredundancy allocations. At the end, we proposed a numerical example and took an analysis toconfirm the feasibility of the model. The conclusions might provide the reference for theoptimized reliability design to the redundancy allocation of the standby components.

主题分类 社會科學 > 管理學
参考文献
  1. Kuo, T. I.,Chen, S. H.,Chiu, J. E.(2007).Tabu search in the redundancy allocation optimization for multi-state series-parallel systems.Journal of the Chinese Institute of Industrial Engineers,24(3),210-218.
    連結:
  2. Azaron, Amir,Perkgoz, Cahit,Katagiri, Hideki,Kato, Kosuke,Sakawa, Masatoshi(2009).Multi-objective reliability optimization for dissimilar-unit cold-standby systems using a genetic algorithm.Computers & Operations Research,36,1562-1571.
  3. Bueno, Vanderlei da Costa(2005).Minimal standby redundancy allocation in a k-out-of-n: F system of dependent components.European Journal of Operational Research,165,786-793.
  4. Chern, M. S.(1992).On the computational complexity of reliability redundancy allocation in a series system.Operations Research Letters,11,309-315.
  5. Hsieh, C. C.(2005).Replacement and standby redundancy policies in a deteriorating system with aging and random shocks.Computers & Operations Research,32,2297-2308.
  6. Huang, X. M.,Ju, R. R.,Wang, L.,Wei, Q. H.,Yang, S. S.(2007).Redundancy technology for aircraft multi-channel DC power supply system.Transactions of Nanjing University of Aeronautics & Astronautics,24(4),305-309.
  7. Kuo, W.,Rajendra Prasad, V.(2000).An annotated overview of system-reliability optimization.IEEE Trans. Reliability,49(2),176-187.
  8. Li, J. P.(1996).A bound dynamic programming for solving reliability redundancy optimization.Microelectronic Reliability,36(10),1515-1520.
  9. Li, J. P.,Jia, X.(1997).A new partial bound enumeration for solving reliability redundancy optimization.Microelectronic Reliability,37(2),237-242.
  10. Liang, H. C.(2007).Representatives of economical repair solutions for memories.Journal of Advanced Engineering,2(1),49-54.
  11. Luus, R.(1985).Optimization of system reliability by a new nonlinear integer programming procedure.IEEE Trans. Reliability,R-24,14-16.
  12. Misra, K. B.,Sharma, J.(1973).A new geometric programming formulation for a reliability problem.Intermational Journal Control,18,497-503.
  13. Mitchell, Billy F.,Murry, Robert J.(1996).Predicting operational availability for system with redundant, repairable components and multiple sparing levels.Annual Reliability and Maintainability Symposium
  14. Murthy, D. N. P.,Blischke, W. R.(1994).Warranty Cost Analysis.New York:Marcel Dekker, Inc..
  15. Toogood, R.,Zuo, M. J.,Monga, A.(1995).Reliability Design for minimal life cycle costs.Proceedings of the 4th Industrial Engineering Research Conference,Norcross, GA: