题名

運用六標準差手法改善TFT-LCD模組製程設備

并列篇名

Using Six Sigma Techniques to Improve the TFT-LCD Module Manufacturing Equipment

作者

吳嘉興(Chia-Hsin Wu);黃文昌(Wen-Chang Huang);溫元良(Yuan-Liang Wen)

关键词

薄膜電晶體液晶顯示器 ; 六標準差 ; 失效模式與效應分析 ; TFT-LCD ; Six Sigma ; FMEA

期刊名称

明新學報

卷期/出版年月

41卷2期(2015 / 08 / 01)

页次

115 - 131

内容语文

繁體中文

中文摘要

本研究以六標準差的DMAIC手法來針對TFT-LCD工廠如何在預防保養中,提升其設備的穩定性與稼動率,使產品有穩定的良率與產能的提升,以未雨綢繆之精神,發展出預期的高品質水準。研究導入失效模式與效應分析(FMEA)的評估,分析出製程設備中相關失效風險的影響,並區分探討其可能發生嚴重程度的各種模式,以便能夠採取適當的預防措施,對嚴重性或關鍵性等級較高之範圍,設法防止其發生失效之機會,或降低失效可能造成的影響,並據此建立在大量生產時,失效重現的有效管制方案,來提昇製程設備之信賴性。

英文摘要

In this study, Six Sigma DMAIC approach for the TFT-LCD factory how preventive maintenance, and enhance its stability and utilization rate of equipment, the product has a stable yield and improve productivity, and in the spirit of a rainy day, the development of the expected the high quality standards. Research import failure mode and effects analysis (FMEA) assessment, analysis of process equipment - related risk of failure, and to distinguish explore the possible severity of the various modes to be able to take appropriate preventive measures, the key to the severity or higher rating range, try to prevent the failure of his chance occurrence, or reduce the impact of the failure may be caused, and accordingly set up in mass production, the failure to reproduce the effective control program, to enhance the process equipment reliability.

主题分类 人文學 > 人文學綜合
基礎與應用科學 > 基礎與應用科學綜合
工程學 > 工程學綜合
社會科學 > 社會科學綜合
参考文献
  1. 中華映管股份有限公司網站(2011)。取自http://www.cptt.com.tw/
  2. 友達光電股份有限公司網站(2013)。取自http://auo.com.tw/?sn=47&lang=zh-TW
  3. Leang, S.,Spanos, C. J.(1997).A general equipment diagnostic system and its application on photolithographic sequences.IEEE, Transactions On The Semiconductor Manufacturing,10(3),329-343.
  4. Lee, K.,Su, Y.(2013).Applying six sigma to quality improvement in construction.Journal of Management in Engineering,29(4),464-470.
  5. Nooramin, A. S.,Ahouei, V. R.,Sayareh, J.(2011).A Six Sigma framework for marine container terminals.International Journal of Lean Six Sigma,2(3),241-253.
  6. Price, C. J.,Taylor, N. S.(1998).FMEA for multiple failure.Proceedings of Annual Reliability and Maintainability Symposium
  7. Su, C. T.,Chou, C. J.(2008).A systematic methodology for the creation of Six Sigma projects: A case study of semiconductor foundry.Expert Systems with Applications,34(4),2693-2703.
  8. Vijayakumar, M. N.,Prashant, V.,Subramanya, K. N.,Narahari N. S.(2013).Application of six sigma methodology for a manufacturing cell-A case study.Industrial Engineering and Engineering Management(IEEM), 2013 IEEE International Conference on,Bangkok:
  9. 林俊蓮(2009)。碩士論文(碩士論文)。新竹市,清華大學。
  10. 高國華(2006)。碩士論文(碩士論文)。台北市,華梵大學。
  11. 張政豪(2009)。碩士論文(碩士論文)。高雄市,高雄應用科大。
  12. 郭權興(2006)。碩士論文(碩士論文)。桃園市,元智大學。
  13. 陳昆暉(2006)。碩士論文(碩士論文)。桃園市,元智大學。
  14. 陳瀅中(2007)。碩士論文(碩士論文)。彰化縣,大葉大學。
  15. 董舒麟(2001)。碩士論文(碩士論文)。桃園市,中央大學。
  16. 劉美君(2013)。,台北:財團法人工業技術研究院產業經濟與趨勢研究中心。
  17. 蔣承吉(2009)。碩士論文(碩士論文)。台南市,南臺科技大學。