A Comprehensive Value Engineering Approach for Gas Pipeline Projects Using Mathematical Models and FAST: A Case Study of Mazandaran Gas Company

DOI

10.6702/ijbi.2011.6.2.3

作者

Iraj Mahdavi;Hamed Fazlollahtabar;Nezam Mahdavi-Amiri;Mohsen Arabmaghsudi;Mohammad Hassan Yahyanejad

关键词

Value engineering ; gas pipelines ; location-allocation ; minimum spanning tree (MST) ; Functional Analysis System Technique(FAST)

期刊名称

International Journal of Business and Information

卷期/出版年月

6卷2期(2011 / 12 / 01)

页次

182 - 204

内容语文

英文

英文摘要

This study explores implementation of value engineering (VE) in gas pipeline projects, focusing on the link among transfer, feed, and distribution lines. For any feed line, there is a City Gate Station (CGS), and for any distribution line, there are some Town Broad Stations (TBS). We assess value in two cases. The first case concerns the location of the TBS's, allocation of consumption zones to TBS's, and the routing of distribution lines among the TBS's and consumption zones. The second case focuses on analyzing activities during the implementation process to identify any extra or malfunctioned activities in order to propose a change of strategy to gain a higher value. For the first case, we apply a combination of a location-allocation mathematical model and the minimum spanning tree (MST) method, and for the second case, we use the Functional Analysis System Technique (FAST). We conduct a case study of a gas company to assess the validity and effectiveness of the value engineering approach.

主题分类 基礎與應用科學 > 資訊科學
社會科學 > 經濟學
社會科學 > 管理學
参考文献
  1. Circ. 2001. Construct for Excellence: Report of the Gas Industry Review Committee, Hong Kong Administrative Government, Hong Kong.
  2. Federal Highway Administration. 2008. The Value Engineering Process. .
  3. Abidin, N.Z.,Pasquire, C.L.(2005).Delivering sustainability through value management: Concept and performance overview.Eng Construct Architect Manage,12(2),168-180.
  4. Cheah, C.Y.J.,Ting, S.K.(2005).Appraisal of value engineering in a gas project in Southeast Asia.International Journal of Project Management,23(2),151-158.
  5. Chen, W.T.、Chang, P.Y.(2008)。Using the computer to enhance the efficiency of a value engineering study。Journal of Civil and Hydraulic,35(1),78-85。
  6. DeEll'Isola, A.J.(1997).Value Engineering: Practical Application for Design, Construction, Maintenance, and Operations.Washington, D.C.:R.S. Means Company.
  7. Dunnette, M.D.(ed.),Hough, L.M.(ed.)(1991).Handbook of industrial and organizational psychology.California:Consulting Psychologists Press.
  8. Ellis, R.C.T.,Wood, G.D.,Keel, D.A.(2005).Value management practices of leading UK cost consultants.Construction Management and Economics,23,483-493.
  9. Fong, P.S.-W.(2004).A critical appraisal of recent advances and future directions in value management.European Journal of Engineering Education,29(3),377-388.
  10. Fong, P.S.-W.(1998).What do value practitioners think about value methodology?.SAVE International Conference Proceedings
  11. Fong, P.S.-W.,,Shen, Q.(2000).Is the Hong Kong construction industry ready for value management?.International Journal of Project Management,18(5),317-326.
  12. Frondizi, R.(1971).What Is Value? An Introduction to Axiology.LaSalle, Illinois:Open Court Publishing Company.
  13. Holdbrook, M.B.(Ed.)(1999).Consumer Value: A Framework for Analysis and Research.New York:Routledge.
  14. Kelly, J.,Male, S.,Graham, D.(2004).Value Management of Gas Projects.Blackwell:Blackwell.
  15. Male, S.,Kelly, J.,Gronqvist, M.,Graham, D.(2007).Managing value as a management style for projects.International Journal of Project Management,25(2),107-114.
  16. Palmer, A.,Kelly, J.,Male, S.(1996).Holistic appraisal of value engineering in gas projects in United States.Journal of Construction Engineering and Management,122(4),324-328.
  17. Parsons, T.(ed.),Shils, E.A.(ed.)(1959).Toward a General Theory of Action.Boston:Harvard University Press.
  18. Rescher, N.(1969).Introduction to Value Theory.Englewood Cliffs, New Jersey:Prentice-Hall.
  19. Rokeach, M.(1973).The Nature of Human Values.New York:Free Press.
  20. Shen, Q.,Chung, J.K.H.(2002).A group decision support system for value management studies in the construction industry.International Journal of Project Management,20(3),247-252.
  21. Spaulding, W.M.,Bridge, A.,Skitmore, R.M.(2005).The use of function analysis as the basis of value management in the Australian construction industry.Construction Management and Economics,23,723-731.
  22. Winter, M.,Smith, C.,Morris, P.,Cicmil, S.(2006).Directions for future research in project management: The main findings of a UK government- funded research network.International Journal of Project Management,24(8),638- 649.
  23. Younker, D.L.(2003).Value Engineering: Analysis and Methodology.New York:Marcel Dekker.
  24. Yu, A.T.W.,Shen, Q.,Kelly, J.,Hunter, K.(2005).Application of value management in project briefing.Facilities,23(7/8),330-342.