参考文献
|
-
Shum, Y. -S.,Yeh, R. -C.,Chung, C.–J.(2007).Optimizing Replenishment Policy for Supply Chain Collaboration with Multiple Delivery Considering Pricing and Information Sharing.Logistics Management Review,2(1),99-106.
連結:
-
Palisade Corporation, Evolver 4.0 Manual, The Genetic Algorithm solver for Microsoft Excel, 2004..
-
Agrell, P.,Lindroth, R.,Norrman, A(2004).Risk, information and incentives in telecom supply chains.International Journal of Production Economics,90(1),1-16.
-
Ahmad, S.,Schroeder, R. G.,Sinha, K. K.(2003).The Role of Infrastructure Practices in the Effectiveness of JIT Practices: Implications for Plant Competitiveness.Journal of Engineering and Technology Management,20,161-191.
-
Altiparmak, F.,Gen, M.,Lin, L.,Paksoy, T.(2006).A Genetic Algorithm Approach for Multi-objective Optimization of Supply Chain Networks.Computers and Industrial Engineering,51,197-216.
-
Ben-Daya, M.,Hariga, M.(2000).Economic Lot Scheduling Problem with Imperfect Production Processes.Journal of the Operational Research Society,51,875-881.
-
Chopra, S.,Meindl, P.(2007).Supply Chain Management: Strategy, Planning and Operation.Pearson.
-
Goyal, S. K.,Gunaskaran, A.(1995).An Integrated Production-inventory-marketing Model for Deteriorating Items.Computer and Industrial Engineering,28,755-762.
-
Goyal, S. K.,Gupta, Y. P.(1989).Integrated Inventory Model: The Vendor -buyer Coordination.European Journal of Operational Research,41,261-269.
-
Hill, R. M.(1997).The Single-vendor Single-buyer Integrated Production Inventory Model with a Generalized Policy.European Journal of Operational Research,97,493-499.
-
Holland, J. H.(1975).Adaptation in Natural and Artificial Systems.Ann Arbor:University of Michigan Press.
-
Hsiao, Y.-C.(2008).Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information.International Journal of Production Economics,115,229-235.
-
Kim, S. -L.,Ha, D.(2003).A JIT Lot-splitting Model for Supply Chain Management: Enhancing Buyer-supplier Linkage.International Journal of Production Economics,86,1-10.
-
Lee, H. L.,Rosenblatt, M. J.(1987).Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System.Management Science,33,1125-1136.
-
Lee, H. L.,Rosenblatt, M. J.(1986).A Generalized Quantity Discount Pricing Model to Increase Supplier's Profits.Management Science,32,1177-1185.
-
Lee, H.L.,So, K.T.,Tang, C.S.(2000).The value of information sharing in a two-level supply chain.Management Science,46,626-643.
-
Maiti, A. K.,Bhunia, A. K.,Maiti, M.(2006).An Application of Real-coded Genetic Algorithm (RCGA) for Mixed Integer Non-linear Programming in Two-storage Multi-item Inventory Model with Discount Policy.Applied Mathematics and Computation,183,903-915.
-
Maiti, M. K.,Maiti, M.(2007).Two-storage Inventory Model with Lot-size Dependent Fuzzy Lead-time Under Possibility Constraints via Genetic Algorithm.European Journal of Operational Research,179,352-371.
-
Mishra, B.K.,Raghunathan, S.,Yue, X.(2003).Demand forecast sharingin supply chains.University of Texas at Dallas.
-
Mitra, S.,Chatterjee, A. K.(2004).Leveraging Information in Multi-echelon Inventory Systems.European Journal of Operational Research,152,263-280.
-
Nachiappan, S. P.,Jawahar, N.(2007).A Genetic Algorithm for Optimal Operating Parameters of VMI System in a Two-echelon Supply Chain.European Journal of Operational Research,182,1433-1452.
-
Ouyang, L. -Y.,Wu, K. -S.(1997).Mixture Inventory Model Involving Variable Lead-time with a Service Level Constraint.Computer and Operations Research,24,875-882.
-
Pal, P.,Das, C. B.,Panda, A.,Bhunia, A. K.(2005).An Application of Real-coded Genetic Algorithm (for Mixed Integer Non-linear Programming in an Optimal Two-warehouse Inventory Policy for Deteriorating Items with a Linear Trend in Demand and a Fixed Planning Horizon).International Journal of Computer Mathematics,82(2),163-175.
-
Raghunathan, S.(2001).Information sharing in a supply chain: A note on its value when demand is non-stationary.Management Science,47,605-610.
-
Schniederjans, M. J.,Cao, Q.(2000).A Note on JIT Purchasing vs. EOQ with a Price Discount: An Expansion of Inventory Costs.International Journal of Production Economics,65,289-294.
-
Tkaczyk, S.,Jagla, J.(2001).The Economic Aspects of the Implementation of a Quality System Process in Polish Enterprises.Journal of Materials Processing Technology,109,196-205.
-
Torabi, S. A.,Fatemi Ghomi, S. M. T.,Karimi, B.(2006).A Hybrid Genetic Algorithm for the Finite Horizon Economic Lot and Delivery Scheduling in Supply Chains.European Journal of Operational Research,173,173-189.
-
White, R. E.,Prybutok, V.(2001).The Relationship between JIT Practices and Type of Production System.Omega,29,113-124.
-
Zhao, X.,Xie, F.,Zhang, W. F.(2002).The Impact of Information Sharing and Ordering Co-ordination on Supply Chain Performance.Supply Chain Management: An International Journal,7,24-40.
|