题名

工作站限制下typeⅡ與typeⅢ生產線平衡之佈置

并列篇名

Assembly Line Balancing Problem for Type Ⅱ and Type Ⅲ with Constrained Workstations

DOI

10.29705/EAR.201106.0007

作者

藍毓華(Yu-Hua Lan);余玟慧(Wen-Hui Yu)

关键词

生產線平衡 ; 工作負荷平滑化 ; 平衡效率 ; Assembly Line Balancing ; Workload Smoothing ; Balancing Efficiency

期刊名称

東亞論壇

卷期/出版年月

472期(2011 / 06 / 01)

页次

109 - 118

内容语文

繁體中文

中文摘要

本研究探討周程時間最小化(Type Ⅱ)與工作負荷平滑化(Type Ⅲ)考量下之生產平衡效率問題。一般認為當以Type Ⅲ的目標之下應會有較佳的平衡效率產出,但本研究透過數值範例進行不同工作站數改變下的模擬情況,其結果發現當以追求Type Ⅲ為目標時,若工作站數給予過大的佈置空間,最佳佈置結果將傾向將生產周程時間加以放大,同時並進行工作單元的佈置調動,以達到各工作站平均負荷變異最小化的目標。因此,研究發現在工作站排給定條件下,兩個不同目標導向下,以Type Ⅱ為目標的生產線平衡問題之佈置有著較佳的平衡效率表現。

英文摘要

This study mainly investigates the efficiency of assembly line balancing (ALB) with the consideration of the minimization of cycle time (type Ⅱ) and workload smoothing (type Ⅲ). General researchers considered that the more workload smoothing makes the more ALB efficiency. Through the simulation of variable number of workstations, the ALB efficiency of type Ⅱ is often tie or ahead than type Ⅲ. The major finding of this work shows that the ALB solution of type Ⅱ is better than type Ⅲ under a given number of workstations. When the number of workstations is satisfied enough, the research suggested solution is going to type Ⅲ because type Ⅲ not only owns ALB efficiency and cycle time have insignificant difference than type Ⅱ, but creates the better workload smoothing. Therefore, the major finding of this work shows that the ALB solution of type Ⅱ is better than type Ⅲ under a given number of workstations.

主题分类 社會科學 > 社會科學綜合
社會科學 > 社會學
参考文献
  1. Baybars, I.(1986).An Efficient Heuristic Method for the Simple Assembly Line Balancing Problem.International Journal of Production Research,24(1),149-166.
  2. Bryton, B.(1954).North-Western University.
  3. Erel, E.,Gokcen, H.(1999).Shortest-route formulation of mixed-model assembly line balancing problem.European Journal of Operational Research,116,194-204.
  4. Ghosh, S.,Gagnon, R. J.(1989).A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems.Int. J. Prod. Res.,27(4),637-670.
  5. He Helgeson, W.B.,Birnie, D.P.(1961).Assembly Line Balancing using Ranked Positional Weight Technique.Journal of Industrial Engineering,12,394-398.
  6. Kim, Y. K.,Kim, Y.J.,Kim, Y.(1996).Genetic algorithms for assembly line balancing with various objectives.Computers International Engineering,30(3),397-409.
  7. Kim, Y. K.,Kim, Y.J.,Kim, Y.(2000).Two-sided Assembly Lines Balancing Using an Ant-colony-based Heuristic.Production Planning & Control,44-53.
  8. Oh, Keytack H.(1997).Expert line balancing system (ELBS).Computers International Engineering,33(1-2),303-306.
  9. Rachamadugu, R.,Talbot, B.(1991).Improving the equality of workload assignments in assembly lines.International Journal ProductionRes,29,619-633.
  10. Salveson, M. E.(1955).The Assembly Line Balancing Problem.Journal Industrial Engineering,6(3),17-25.
  11. 方世榮譯、Groover, Mikell P.(1991)。自動化生產系統及電腦整合製造。台北:曉園出版社。
  12. 王建鈞(2004)。碩士論文(碩士論文)。南華大學管理科學研究所。
  13. 呂英毅(2002)。碩士論文(碩士論文)。逢甲大學工業工程研究所。
  14. 陳英美(2008)。碩士論文(碩士論文)。國立中山大學企業管理系。
  15. 傅和彥(2005)。生產與作業管理:建立產品於服務標竿。台北:前程文化。
  16. 黃國峰、黃義清(2009)。模糊多目標線性規劃於組裝生產線工作站最適生產週期時間、生產成本與工作平滑度之研究。全球商業經營管理學報,1,129-138。
  17. 劉慧芬(2002)。碩士論文(碩士論文)。元智大學工業工程與管理學系。