题名

物料運輸成本的聯合-訂貨和生產批量模型研究

并列篇名

A Study on the Joint Materials Ordering and Manufacturing Lot Sizes Model Considering the Transportation Cost of Materials

作者

桂華明(Hua-Ming Gui)

关键词

物料運輸成本 ; 聯合訂貨和生產批量 ; 物料訂貨模式 ; Transportation cost ; Integrated procurement-production lot size ; Materials ordering pattern

期刊名称

東亞論壇

卷期/出版年月

480期(2013 / 06 / 01)

页次

13 - 25

内容语文

繁體中文

中文摘要

考慮單位物料運輸成本對訂貨批量敏感時,建立了製造商的聯合物料採購與生產批量決策模型,數學分析和算例研究表明:當物料加工成完工產品時增值越多,物料訂貨成本與生產準備成本的比值越大,單位物料的運輸成本對訂貨批量越敏感時,物料訂貨批量相比單批產品生產所需物料數量的倍數越大,製造商宜採用EOQ的物料訂貨模式,反之,則宜採用JIT的物料訂貨模式。此外,在單位物料的運輸成本對物料的訂貨批量較敏感的情況下,單位時間的需求量越小,製造商宜採用JIT的物料訂貨模式。但在物料訂貨成本較低和單位物料的運輸成本對訂貨批量較不敏感時,無論單位時間的需求量多大,都宜採用JIT的物料訂貨模式,而且需求量越大,相比生產批次的訂貨次數越多。

英文摘要

This research studies prerequisite conditions considering for EOQ and JIT. The transportation cost of unit material sensitive to the order quantity, an integrated procurement-production lot sizes decision model of manufacturers was constructed. Mathematical analysis and numerical illustrations show: the more the added value of unit finished product by manufacturing processes which convert the materials into the finished products, the larger the ratio of the materials ordering cost to the manufacturer's set up cost, the more sensitive to the materials ordering quantity the transportation cost of unit material, the larger the multiple of the materials ordering quantity compared to the production batch, the more the manufacturer should use the EOQ if ordering pattern, on otherwise it is advised to adopt the JIT materials ordering pattern. In addition, the transportation cost of unit material is more sensitive to the materials ordering quantity, the smaller the demand per unit time, the manufacturer is more appropriate to adopt the JIT pattern. However, when the materials ordering cost is lower and the transportation cost of unit material is less sensitive to the materials ordering quantity, regardless of what the demand per unit time is, the manufacture is more to adopt the JIT ordering pattern, and the greater the demand, the higher the frequency of materials ordering should be.

主题分类 社會科學 > 社會科學綜合
社會科學 > 社會學
参考文献
  1. Cao, Q.,Schniederjans, M.J.(2004).A revised EMQ/JIT production-run model: An examination of inventory and production costs.International Journal of Production Economics,87(1),83-95.
  2. Ertogral, K.,Darwish, M.,Ben-Daya, M.(2007).Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost.European Journal of Operational Research,176(3),1592-1606.
  3. Fazel, F.,Fischer, K. P.,Gilbert, E.W.(1998).JIT purchasing VS EOQ with a price discount: An analytical comparison of inventory costs.International Journal of Production Economics,54(1),101-109.
  4. Jamal, A.M.M.,Sarker, B.R.(1993).An optimal batch size for a production system operating under a just-in-time delivery system.International Journal of Production Economics,32(2),255-260.
  5. Kim, T.,Hong, Y.S.,Chang, S.Y.(2006).Joint economic procurement-production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system.International Journal of Production Economics,103(1),199-208.
  6. Lee, Wenyih(2005).A joint economic lot size model for raw material ordering, manufacturing set up, and finished good delivering.Omega,33(2),163-174.
  7. Parija, G.R.,Sarker, B.R.(1999).Operations planning in a supply chain system with fixed-interval: deliveries of finished goods multiple customers.IIE Transactions,31(11),1075-1082.
  8. Samar, K.,Mukhopadhyay, Huafan Ma(2009).Joint procurement and production decisions in remanufacturing under quality and demand uncertainty.International Journal of Production Economics,120(1),5-17.
  9. Sarker, B.R.,Parija, G. R.(1996).Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system.European Journal of Operational Research,89(3),593-608.
  10. Schniederjans, M. J.,Cao, Q.(2000).A note on JIT purchasing VS. EOQ with a price discount: An expansion of inventory cost.International Journal of Production Economics,65(3),289-294.
  11. Swenseth, Scott R.,Michael, R.G.(2002).Incorporating transportation costs into inventory replenishment decisions.International Journal of Production Economics,77(2),113-130.
  12. Toptal, A.(2009).Replenishment decisions under an all-units discount schedule and stepwise freight costs.European Journal of Operational Research,198(2),504-510.
  13. Wang, C.H.,Dohi, T.,Tsai, W.C.(2010).Coordinated procurement/inspection and production model under inspection errors.Computers & Industrial Engineering,59(3),473-478.
  14. Wu, M.,Low, S.P.(2007).Modeling just-in-time purchasing in the ready mixed concrete industry.International Journal of Production Economics,107(1),190-201.
  15. Zhao, Q.H.(2004).Model and algorithm of an inventory problem with the consideration of transportation cost.Computers & Industrial Engineering,46(2),389-397.
  16. Zolghadri, M.,Olivier, C.,Bourrières, J. P.(2008).Close-optimal production and procurement policy for a X-network of added value using lexicographic linear goal programming.Computers & Industrial Engineering,54(4),821-839.
  17. 周欣(2012)。考慮批量訂貨成本的最優 JIT 訂貨與生產策略。工業工程,15(3),35-40。
  18. 陳瑤、霍佳震(2012)。製造企業精准供應物流的整合優化與成本分攤問題―以汽車業為例。管理工程學報,26(3),55-63。
  19. 馮春花、宋學峰(2009)。考慮運輸成本和資訊成本的JIT 採購模式選擇。系統管理學報,18(4),459-468。