参考文献
|
-
(2006).Carton He-Lecture notes on LBS.
-
Barreira, T. V.,Kang, M.,Caputo, J. L.,Farley, R. S.,Renfrow, M. S.(2009).Validation of the Actiheart monitor for the measurement of physical activity.Int J Exerc Sci,2(1),60-71.
-
Bouchard, C. E.,Shephard, R. J.,Stephens, T. E.(1994).Physical activity, fitness, and health: International proceedings and consensus statement.International Consensus Symposium on Physical Activity, Fitness, and Health, 2nd,Toronto, ON, Canada:
-
Fang, Hui-Ming,Hsiao, Sung-Shan,Lai, Cheng-Tsen,Wang, Hsing-Yu,Ho, Liang-Sheng.A Study On The Application Of Cloud Computing In Maintenance And Management System For Breakwater.Journal of Coastal and Ocean Engineering,13(2),171-187.
-
Friesen, G. M.,Jannetta, T. C.,Jadallah, M. A.,Yates, S. L.,Quint, S. R.,Nagle, H. T.(1990).A comparison of the noise sensitivity of nine QRS detection algorithms.IEEE Trans Biomed Eng,37(1),85-98.
-
Greenwood, J. A.,Landwehr, J. M.,Matalas, N. C.,Wallis, J. R.(1979).Probability weighted moments: definition and relation to parameters of several distributions express able in inverse form.Water resources rearch,15(5),1049-1054.
-
Kim, Hyunjoo,Grobler, Francois(2009).Design coordination in building information modeling (BIM) using ontological consistency checking.Proceedings of SCE International Workshop on Computing in Civil Engineering,346,410-420.
-
Kuprenas, John A.,Mock, Chris S.(2009).Collaborative BIM modeling case study - Process and results.Proceedings of SCE International Workshop on Computing in Civil Engineering,346,431-441.
-
Lee McCuen, Tamera(2008).Scheduling, estimating, and BIM: A profitable combination.AACE International Transactions, 52nd Annual Meeting of AACE International and the 6th World Congress of ICEC on Cost Engineering, Project Management, and Quantity,Toronto, Canada:
-
Liu, J. X.,Gao, T. X.,Yokogawa, K.,Zhang, Y. P.(2006).Differential population structuring and demographic history of two closely related fish species. Japanese sea bass (Lateolabrax japonicus) and spotted sea bass (Lateolabrax maculates) in Northwestern Pacific.Molecular phylogenetic and Evolution,39(3),799-811.
-
Schiller, J.,Voisard , A.(2004).Location-Based Services.Elsevier Inc.
-
Sylvester, K. E.,Dietrich, C(2010).Evaluation of Building Information Modeling (BIM) Estimating Methods in Construction Education.Proceedings of the 46th Associated School of Construction (ASC) Annual International Conference,Boston, MA., USA:
-
Yates, J. K.,Lockley, E. E.(2002).Documenting and analyzing construction failures.Journal of construction Engineering and management,128(1),8-17.
-
Zhili, Gao,Ganapathy, Mahalingam,Nguyen, Tang-Hung(2008).Applications of Building Information Modeling (BIM) in the Design and Construction Process.Proceedings of 12th International Conference on Computing in Civil and Building Engineering & 2008 International Conference on Information Technology in Construction,Beijing, China:
|