题名

Criticality of Schedule Constraints-Classification and Identification for Project Management

作者

Qui T. Nguyen;David K. H. Chua

关键词

Constraint criticality ; constraint management ; schedule management

期刊名称

Journal of Engineering, Project, and Production Management

卷期/出版年月

4卷1期(2014 / 01 / 01)

页次

17 - 25

内容语文

英文

英文摘要

In construction scheduling, constraints among activities are vital as they govern the schedule solution. Understanding their criticality is essential for better schedule management. This paper presents a systematic method to classify and identify the criticality of schedule constraints for the schedule management from the constraint perspective. In terms of criticality, schedule constraints can be grouped into four types: project-critical, activity-critical, sequencecritical and non-critical. Project-critical constraints are those which govern start/finish time of critical activities and the project end time. Activity-critical constraints define the start/finish time of non-critical activities, and sequence-critical constraints are those whose existence affect the start/finish time of some activities or the project end time. Constraints belonging to any of these groups are vital to a schedule as they cannot be removed from the constraint collection. Noncritical constraints, on the other hand, do not govern either start/finish time of any activity or the project end time. Accordingly, non-critical constraints are redundant and can be removed from the constraint collection without causing any change to the schedule solution. The method proposed was applied to a illustrative case example based on the construction of the main entrance of a nursing house for further interpretation. The proposed classification scheme could shed light on a more in-depth understanding of the nature of criticality and the role of constraints in a schedule, and thus better schedule management may be achieved.

主题分类 工程學 > 工程學總論
被引用次数
  1. 楊廷曄(2016)。營建生產作業行為及累積性職業傷害整合自動辨識系統。交通大學土木工程系所學位論文。2016。1-86。