题名

莫拉克颱風災後十年之重建成果及省思(四)-強化未來抗災韌性之重建

并列篇名

Reconstruction after Typhoon Morakot: Achievements and Reflection on Its 10th Anniversary (IV) - Reconstruction for Building Resilience to Future Disaster

DOI

10.6653/MoCICHE.201906_46(3).0004

作者

陳振川(Jenn-Chuan Chern)

关键词
期刊名称

土木水利

卷期/出版年月

46卷3期(2019 / 06 / 01)

页次

39 - 45

内容语文

繁體中文

中文摘要

莫拉克颱風侵襲台灣造成百年之複合型災害,其破紀錄暴雨規模造成南部地區環境破壞、基礎建設及建築物重大損害及人民生命財產損失,也因救災空前困難造成媒體民眾對於政府救災不力之抱怨及內閣之改組。於救災同時,政府成立行政院莫拉克災後重建推動委員會,本於一面加速災民安置,一面和時間賽跑,防災與重建併行,避免二次災害。災後,政府體念政府組織能力及經驗、尚恐無法達成有效之防救災工作,遂進行災害防救法之修訂,同時持續強化軟硬體設備。在推動重建工作兩年後,馬前總統回顧檢討指出「預防不足、救災吃力、安置快速、重建妥速」為結語,並提出「料敵從寬、禦敵從嚴、超前部署、預置兵力、隨時防救」要領,並強調「防災重於救災、離災重於防災」以及做好「中央與地方政府攜手合作」。在過去十年,民間團體力量精進,政府與民間協力構建了防災重建之「社會管理系統」,防災能力大幅提升,以「防災永續為主軸之重建來強化未來抗災韌性」,積極面對未來之颱風豪雨挑戰。在災後重建方面,建議政府應成立統籌之正式組織及體系,加強結合政府相關單位與民間團體之職能,擬備改策定期演練,累積經驗,並能於災後迅速啟動運作。

英文摘要

Typhoon Morakot created a once-in-a-century, compound disaster in Taiwan when the record-breaking rainfall it brought devastated the environment and fundamental infrastructure in southern Taiwan, resulting in great loss of life and properties. As the relief work was incredibly difficult, complaints from the victims and the media also mounted up, criticizing the government for its inefficiency and ineffectiveness, which eventually led to a cabinet reshuffle. While the government was busy offering disaster relief, the Morakot Post-Disaster Reconstruction Council was also established under the Executive Yuan in order to relocate the victims, carry out reconstruction work and prevent any further damage at the same time. Aware of the fact that current government system didn't have the ability and experience to offer proper relief and succeed in the prevention of another huge disaster like this one, the government amended the "Disaster Prevention and Protection Act" and upgraded public facilities and software. In 2010, two years after the disaster, former President Ma Ying-Jeou reflected on the post-disaster process, concluding that "insufficient prevention effort made the disaster relief extremely difficult. Fortunately, the victims were rapidly relocated and the reconstruction was executed with efficiency and circumspection." Moreover, he pointed out that "when it comes to fighting enemies, we must anticipate the worst, and prepare for the worst. We should be ready in advance, with troops prepared in advance for prevention and relief at any time," and emphasized that "disaster prevention is more important than relief, and evacuation of victims is more important than disaster prevention." What's equally noteworthy is "good collaboration between the central and local governments." During the past 10 years, as the abilities of private sectors improved, the government has worked with them to build a preliminary structure of "social management system," enabling Taiwan to be more capable of prevent future disasters. In addition, the government "takes disaster prevention and sustainable development as its main goals in order to make Taiwan more resilient to any upcoming disasters." Pursuing these goals has helped us survive many strong typhoons and heavy rainfalls in subsequent years. With regard to post-disaster reconstruction work, the suggestion will be for the government to set up an official department and system in order to achieve better integration of the skills of both the state and private sectors. Regular drills should also be scheduled in order to gain relevant experience and ensure that the operation of post-disaster relief and reconstruction can be carried out effectively.

主题分类 工程學 > 土木與建築工程
工程學 > 水利工程
参考文献
  1. 陳振川,洪世益(2012)。大規模災害家園重建策略─以莫拉克颱風重建為例。災害防救科技與管理學刊,1(1),63-79。
    連結:
  2. 謝志誠,陳竹山,林萬億(2013)。跳過中繼直達永久?探討莫拉克災後永久屋政策的形成。台灣社會研究季刊,93,49-86。
    連結:
  3. 謝志誠,傅從喜,陳竹山,林萬億(2012)。一條離原鄉愈來愈遠的路?:莫拉克颱風災後異地重建政策的再思考。臺大社工學刊,26,41-86。
    連結:
  4. 內政部(民 95),921 震災住宅重建進度總結報告,民國 95 年 3 月。
  5. 全國成(2018)。國立暨南大學公共行政與政策學系。
  6. 邱柏勳,李依仁,洪毓芸(2015)。從災後異地重建中社區重建工作者的角色─以莫拉克風災為例。社區發展季刊,152,325-331。
  7. 張光甫,陳振川,鐘偉舜(2007)。921 大地震『築巢專案』之執行服務成果。台灣混凝土學會 2007 混凝土工程研討會論文集
  8. 張麗珠(2014)。,國立屏東科技大學。
  9. 陳振川,吳月招(2012).莫拉克颱風災後救助與安置.行政院莫拉克颱風災後重建推動委員會.
  10. 陳振川,張恆裕(2014).莫拉克颱風災後重建五周年成果彙編.行政院莫拉克颱風災後重建推動委員會.
  11. 陳振川,張恆裕(2014).創新協力重建永續家園.行政院莫拉克颱風災後重建推動委員會.
  12. 陳振川,劉敬宗(2011)。莫拉克颱風災後重建─效率、尊重、創新。建築師雜誌,37(12),68-75。
  13. 陳振川,劉敬宗,許芛溱(2013).在廢墟中站起來─莫拉克災後校園重建.行政院莫拉克颱風災後重建推動委員會.
  14. 陳振川,劉敬宗,黃恆瑩(2014).莫拉克颱風災後心理(靈)重建挑戰與創新.行政院莫拉克颱風災後重建推動委員會.
  15. 傅從喜,林萬億,謝志誠,林珍珍(2014)。莫拉克災後遷村策略對社區凝聚之影響。科技部研究計畫研討會
  16. 廖振驊(2019).重建心路─九二一地震與莫拉克颱風災後重建比較.
  17. 鄭淳毅(民 101),「重建,雖然是災難,我們學到很多」─ 中繼屋經驗再思考,莫拉克獨立新聞網,民國 101 年 7 月。
  18. 鄧傳忠(2017)。,國家災害防救科技中心。
  19. 謝志誠(2001).回家的路─築巢專案系列.財團法人九二一震災重建基金會.
  20. 謝志誠(2009)。,國立台灣大學。
  21. 謝臥龍,駱慧文,許文耀,陳武宗(2011)。內政部委託研究報告內政部委託研究報告,內政部。
  22. 譚佳音(2015)。中山大學公共事務管理研究所。
被引用次数
  1. 鄧傳忠,曾敏惠,陳宏宇,吳郁玶(2021)。社區災害韌性的探討:以莫拉克颱風災區重建為例。地理學報,99,1-31。