题名

Technical Treatment of Manual Digging Pile

DOI

10.6919/ICJE.202205_8(5).0033

作者

Weiqiang Tan;Hao Cheng

关键词

Artificial Excavated Pile ; Wall Protection ; Groundwater ; Flow Sand

期刊名称

International Core Journal of Engineering

卷期/出版年月

8卷5期(2022 / 05 / 01)

页次

279 - 282

内容语文

英文

中文摘要

In recent years, the artificial dig-hole pile technology in urban construction with its construction to carry out the flexible, simple equipment, easy to guarantee quality, shorten the construction period, the advantage of relatively low cost to get the recognition of many design, construction units, and play an important role in the construction, but its also affected by many factors in construction process, in the artificial dig-hole pile construction of engineering practice, the needleSome experience has been accumulated in the treatment of several special problems, which can provide reference for similar engineering construction.

主题分类 工程學 > 工程學綜合
参考文献
  1. J.P.Huang.Discussion on Handling of Several Special Problems in Construction of Artificial Excavated Pile [J].Science and Technology Information,2008(28):57.
  2. Z.J.Zhang.Technical treatment of several special problems in construction of manually excavated pile [J]. Heilongjiang Science and Technology Information,2011(16):261. (in Chinese).
  3. H.Y.Li.Technical Treatment of Several Special Problems in Construction of Artificial Excavated Pile [J].Science and Technology Information,2010(18):64.