Technical Treatment of Manual Digging Pile |
DOI |
10.6919/ICJE.202205_8(5).0033 |
作者 |
Weiqiang Tan;Hao Cheng |
关键词 |
Artificial Excavated Pile ; Wall Protection ; Groundwater ; Flow Sand |
期刊名称 |
International Core Journal of Engineering |
卷期/出版年月 |
8卷5期(2022 / 05 / 01) |
页次 |
279 - 282 |
内容语文 |
英文 |
中文摘要 |
In recent years, the artificial dig-hole pile technology in urban construction with its construction to carry out the flexible, simple equipment, easy to guarantee quality, shorten the construction period, the advantage of relatively low cost to get the recognition of many design, construction units, and play an important role in the construction, but its also affected by many factors in construction process, in the artificial dig-hole pile construction of engineering practice, the needleSome experience has been accumulated in the treatment of several special problems, which can provide reference for similar engineering construction. |