英文摘要
|
In this research, the major study is the parallel machine scheduling in a single production stage. Using the Mathematical Programming and according the industry characteristic to create a model that can apply on knitted industry. Also, it adapts the software of Lindo6.1 to implement the model. Then try to using a case to verify this model by minimizing cost and ordering fill rate. In example one, the total costs fell to 475 from 555, the total costs reduces 14% and ordering fill rate is 50%. In example two, the total costs fell to 276 from 1308, the total costs reduces 79% and ordering fill rate increases from 33% to 50% and confirm it feasibility.
|
参考文献
|
-
Baker, K. R., 1974, “Introduction to Sequencing and Scheduling”, New York: Wiley.
連結:
-
Chen, W. J., 2009, “Scheduling with dependent setups and maintenance in a textile company”, Computers & Industrial Engineering, Vol. 57, pp. 867-873.
連結:
-
Gursel, A. S., F. Pico, and A. Santiago, 1997, “Identical machine scheduling to minimize the number of tardy jobs when lot-splitting is allowed”, Computer and Industrial Engineering, Vol. 33, No. 1-2, pp. 277-280.
連結:
-
Hsu, H. M., H. Yai, Y. Z. Chen, and M. C. Wu, 2009, “A GA methodology for the scheduling of yarn-dyed textile production”, Expert Systems with Applications, Vol. 36, pp. 12095-12103.
連結:
-
Karacapilidis, N. I., and C. P. Pappis, 1997, “Production planning and control in textile industry: A case study”, Computers in Industry, Vol. 30, No.2, pp. 127-144.
連結:
-
Lee, J. Y., Y. D. Kim, and B. J. Jeong, 2013, “Heuristic algorithms to minimize total tardiness in an identical-parallel-machine scheduling problem with flexible maintenance”, Asia Pacific Industrial Engineering and Management System.
連結:
-
Lee, W. C., M. C. Chuang, and W. C. Yeh, 2012, “Uniform parallel-machine scheduling to minimize makespan with position-based learning curves”, Computer and Industrial Engineering, Vol. 63, pp. 813-818.
連結:
-
Schaller, J. E., 2014, “Minimizing total tardiness for scheduling identical parallel machines with family setups”, Computer and Industrial Engineering, Vol. 72, pp. 274-281.
連結:
-
Silva, C., and J. M. Magalhaes, 2006, “Heuristic lot size scheduling on unrelated parallel machines with applications in the textile industry”, Computers & Industrial Engineering, Vol. 50, pp. 76-89.
連結:
-
Wang, X. L., and T. C. E. Cheng, 2015, “A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint”, Int. J. Production Economics, Vol. 161, pp. 74-82.
連結:
-
何應欽,2012,作業管理,第10版,美商麥格羅.希爾國際股份有限公司 台灣分公司。
連結:
-
林桂菁,2006,“應用基因演算法在紡織業之生產排程”,國立台中技術學院資訊科技與應用研究所碩士論文。
連結:
-
陳俊吉,2008,“以啟發式方法解決具迴流性質之彈性流程式排程問題”,國立政治大學資訊管理研究所碩士論文。
連結:
-
陳致亨,2004,“產能限制驅導現場管理模式建立—以紡織業為例”,中原大學工業工程學系碩士論文。
連結:
-
湯璟聖,2003,“動態彈性平行機群排程的探討”,中原大學工業工程學系碩士論文。
連結:
-
黃秋媚,2007,“非相關平行機台之彈性生產排程模式”,中原大學工業工程學系碩士論文。
連結:
-
葉麗芬,2002,“雙目標非等效平行機台排程問題之探討”,元智大學工業工程與管理學系碩士論文。
連結:
-
英文文獻
-
Conway, R. W., W. L. Maxwell, and L. W. Miller, 1967, “Theory of Scheduling”, Addison-Wesey, pp.42-51.
-
-
中文文獻
-
田國興,2000,“有設置時間之流程型工廠多階段平行機台總排程時間最小化問題” ,中原大學工業工程學系碩士論文。
-
行政院全球資訊網,http://www.ey.gov.tw/。
-
李晉裕,2000,“半導體測試廠有限資源產能規劃研究”,中原大學工業工程學系碩士論文。
-
周清江、黃信強,2002,“運用基因演算法於平行器之工作排程”,資訊管理展望,第4卷,第1期。
-
林純行,2003,“多階平行機器零工式多目標排程之模式化與系統之研究”,東海大學工業工程與經營資訊研究所碩士論文。
-
林清河,2010,工業工程與管理,第3版,華泰文化。
-
邱敬琮,2006,“先進規劃與排程系統應用於紡織業之研究”,東海大學工業工程與經營資訊研究所碩士論文。
-
紡拓會,http://www.textiles.org.tw/。
-
產業價值鏈資訊平台,http://ic.tpex.org.tw/index.php。
-
游展宗,2008,“以基因演算法產生工件序列來最小化自動導引車(AGV)之週期時間”,國立交通大學運輸科技與管理學系碩士論文。
-
黃信強,2000,“運用基因演算法於平行機器之工作排程”,淡江大學資訊管理學系碩士論文。
-
黃維曄,1994,“彈性製造系統中考慮運輸時間之排程探討”,中原大學工業工程學系碩士論文。
-
賴崇瑋,2001,“二機開放工場具有工作連接性限制之排程演算法效率比較”,東海大學工業工程學系碩士論文。
-
謝東穎,2014,“考慮不同派工策略下彈性製造系統作業複雜度績效評估”,國立雲林科技大學工業工程與管理系碩士論文。
|