参考文献
|
-
[2] 余政洋,2014,考量製造商最佳選別檢驗計畫與品質投資水準之研究,台灣碩士論文。
連結:
-
[3] 余曉萍,2007,逐次抽樣計畫最佳停止法則之研究,國立成功大學機構典藏。
連結:
-
[5] 陳啟政,2003,運用總品質成本分析之供應商績效評估模式,中原大學工業工程研究所學位論文。
連結:
-
[6] 黃允成、林淑萍、蘇琬菁和黃彥彰,2009,貝氏逐次抽樣計畫與傳統逐次抽樣計畫之比較分析,管理研究學報,第9卷,第1頁至44頁。
連結:
-
[9] Aslama, M. and Junb, C. H., 2010, “A Double Acceptance Sampling Plan for Generalized Log-Logistic Distributions with Known Shape Parameters”, Journal of Applied Statistics, Vol. 37, No. 3, pp. 405-414.
連結:
-
[10] Chang, H. and Huang, T. Y., 2006, “Design of a Double Attribute Acceptance Sampling Plan and its Operating Characteristic Curve: a Visual Approach using LabVIEW Programming Language”, Hua Kang Journal of Engineering Chinese Culture University, Vol. 20, pp. 29-38.
連結:
-
[11] Chen, C. C. and Yang, C. C., 2004, “A Study of Supplier Performance Rating Using Total-Involved-Quality-Costs Analysis”, Journal of the Chinese Institute of Industrial Engineers, Vol. 21, No. 3, pp. 272-281.
連結:
-
[12] Chen, C. H. and Chou, C. Y., 2002, “Economic Design of Continuous Sampling Plan under Linear Inspection Cost”, Journal of Applied Statistics, Vol. 29, No. 7, pp. 1003-1009.
連結:
-
[13] Chen, C. H., 2012, “Optimum Profit Model Considering Single Sampling Inspection Plan and Quality Loss of Product”, Journal of Quality, Vol. 19, No. 3 pp. 207-221.
連結:
-
[14] Dodge, H. F. and Romig, H. G., 1941 “Single Sampling and Double Sampling Inspection Tables”, Bell System Technical Journal, Vol. 20, No. 1, pp. 1-61.
連結:
-
[16] Hailey, William A., 1980, “Computer Programs: Minimum Sample Size Single Sampling Plans: A Computerized Approach”, Journal of Quality Technology, Vol. 12, No. 4, pp. 230-235.
連結:
-
[17] Huang, Y. C., Li, T. L. and Tseng, C. W., 2009, “The Economic Design of Quality Improvement Strategy for Manufacturing Process”, Journal of Quality, Vol. 16, No. 5 pp. 347-367.
連結:
-
[18] Ittner, C. D., 1994, “An Examination of the Indirect Productivity Gains from Quality Improvement”, Vol. 3, No. 3, pp. 153-170.
連結:
-
[19] Kandasamya, C. and Govindaraju, K., 1994, “Selection of CSP-V Continuous Sampling Plans”, Journal of Applied Statistics, Vol. 21, No. 4, pp. 235-254.
連結:
-
[20] Ksenija, D. and Berislav, Z., 2012, “Decision Making Based on Single and Double Acceptance Sampling Plans for Assessing Quality of Lots”, Business Systems Research, Vol. 3, No. 2, pp. 27-40.
連結:
-
[21] Lee, H. L. and Tagaras, G., 1992, “Economic Acceptance Sampling Plans in Complex Multi-stage Production Systems”, International Journal of Production Research, Vol. 30, No. 11, pp. 2615-2632.
連結:
-
[23] Yu, H. F. and Yu, W. C., 2011, “A Joint Inspection Policy between CSP-1 and Precise Inspection for Non-repairable Products under Inspection Errors and Return Cost”, Journal of Quality, Vol. 18, No. 1, pp. 61-74.
連結:
-
[1] 王勝民,1994,規準型雙次抽樣計劃與CSP-2之相關研究,台灣碩士論文。
-
[4] 張有成,2012,「抽樣檢驗」,中華民國品質學會,台北。
-
[7] 簡聰海和鄒靖寧,1999,「全面品質保證實務:ISO9000品保模式之認證,高立,台北。
-
[8] 蘇朝墩,2010,「品質管理」,前程,台北。
-
[15] Feigenbaum, A.V., 1983, “Total Quality Control”, McGraw-Hill Book Company, New York, 3rd Ed.
-
[22] Yang, M. B., 2004, “A New Quality Cost Model and the Optimum Quality Level”, Pan-Pacific Management Review, Vol. 7, No. 2, pp. 161-181.
|